Installation of the Air Conditioning Pack
TASK 21-52-41-400-001-A
Installation of the Air Conditioning Pack
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 21-52-41-860-050-A
Subtask 21-52-41-420-055-A
(1) Carefully put the air conditioning pack (4) in position in the aircraft.
(3) Put the tie rods (71), (72), (73), (74), (75), (77), (78), (79), (80), (81), (82) and (83) in position.
(4) Install the bushes (98), (where fitted the washers (97)), the bolts (96), the washers (100) and the nuts (99).
(6) Put the bonding straps (102) in position and install the screws (101), the washers (103) and the nuts (104) (Ref. AMM TASK 20-28-00-912-802).
Subtask 21-52-41-420-052-A ** ON A/C NOT FOR ALL
Subtask 21-52-41-410-050-A
[Rev.10 from 2021]
2026.03.31 23:07:21 UTC
Installation of the Air Conditioning Pack
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
NOTE: The procedure is the same for the air conditioning pack 10HM (11HM).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03QBB9) | Dry lubricant-General Assembly Molybdenum Disulfide - |
| (Material No.03QBD1) | Dry lubricant-General Assembly Graphite - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HM] (PACK 1-AIR CONDITIONING) | |
| 191BB, 191KB | |
| FOR [11HM] (PACK 2-AIR CONDITIONING) | |
| 192FB, 192KB | |
E. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 20-26-00-910-002-A | Installation of Expansion Joints |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 20-28-00-912-803-A | Bonding Surface Preparation |
| TASK 21-58-00-710-002-A | Operational Test of the Conditioned Service Air System with Bleed Air |
| TASK 21-58-54-400-001-A | Installation of the Temperature Control Module |
| TASK 21-63-00-710-004-A | Operational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDU |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-52-41-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) .
(2) Make sure that the access panel/s is/are removed (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM] (PACK 1-AIR CONDITIONING)
(b) FOR [11HM] (PACK 2-AIR CONDITIONING)
(3) On the panel 30VU make sure that:
(a) The APU BLEED pushbutton switch is in the off position (the ON legend is off).
(b) The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(c) The warning notice to tell persons not to operate these pushbutton switches is in position.
(4) Make sure that the warning notice to tell persons not to supply the ground air is in position on the HP ground connector.
Subtask 21-52-41-865-051-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) .
(2) Make sure that the access panel/s is/are removed (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM] (PACK 1-AIR CONDITIONING)
(b) FOR [11HM] (PACK 2-AIR CONDITIONING)
(3) On the panel 30VU make sure that:
(a) The APU BLEED pushbutton switch is in the off position (the ON legend is off).
(b) The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(c) The warning notice to tell persons not to operate these pushbutton switches is in position.
(4) Make sure that the warning notice to tell persons not to supply the ground air is in position on the HP ground connector.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM (PACK 1AIR CONDITIONING) | |||
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM (PACK 2AIR CONDITIONING) | |||
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
Subtask 21-52-41-420-055-A
A. Installation of the Attachment Components
(1) Put the support rod (72a) in position on the support rod (72b) and install the bolt (3), the washer (1) and the nut (2).
(2) Put the support rods (71), (72a) and (72b), (73), (74), (75), (77), (78), (79), (80), (81), (82) and (83) in their applicable positions in the brackets (101).
(3) Install the bushings (98), if fitted the washers (97), the bolts (96), the washers (100) and the nuts (99).
Subtask 21-52-41-560-050-C ** ON A/C NOT FOR ALL (1) Put the support rod (72a) in position on the support rod (72b) and install the bolt (3), the washer (1) and the nut (2).
(2) Put the support rods (71), (72a) and (72b), (73), (74), (75), (77), (78), (79), (80), (81), (82) and (83) in their applicable positions in the brackets (101).
(3) Install the bushings (98), if fitted the washers (97), the bolts (96), the washers (100) and the nuts (99).
B. Preparation of the Replacement Component
(2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Make sure that:
(a) For the left air conditioning pack the seals (122) and (124) are clean and in a good condition,
(7) For the right air conditioning pack put the seals (222) and (224) in position on the air conditioning pack (4).
(8) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(9) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(10) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL 64 INSTL (41), or the alternative new AIPC 21-52-03-11-420 SEAL 64 INSTL (39) and the new AIPC 21-52-03-11-420 SEAL 64 INSTL (40) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (42) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL 64 INSTL (141), or the alternative new AIPC 21-52-03-17-340 SEAL 64 INSTL (139) and the new AIPC 21-52-03-17-340 SEAL 64 INSTL (140) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (142) in position in the sleeve (31).
(11) Make sure that the clamp (30) is in position on the duct (43).
(12) Put the sleeve (31) in position on the duct (43) and move it as far on the duct as it will go.
(a) For the left air conditioning pack:
1 Make sure that the O-ring (37) is clean, in a good condition and that it is correctly installed.
2 If necessary replace the AIPC 21-52-41-27-100 PACKING-PREFORMED (37).
3 Apply a small quantity of:
1 Make sure that the O-ring (137) is clean, in a good condition and that it is correctly installed.
2 If necessary replace the AIPC 21-52-41-27-100 PACKING-PREFORMED (137).
(15) Apply a small quantity of:
Subtask 21-52-41-560-050-D ** ON A/C NOT FOR ALL NOTE: It is no longer required that the bonding strap (87) is fitted for the installation of the air conditioning pack.
(1) Remove the blanking plugs from the disconnected line ends. (2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Make sure that:
(a) For the left air conditioning pack the seals (122) and (124) are clean and in a good condition,
- if necessary replace the AIPC 21-52-03-14-015 SEAL (122) and/or the AIPC 21-52-03-14-016 SEAL (124).
- if necessary replace the AIPC 21-52-03-20-015 SEALS (222) and/or the AIPC 21-52-03-20-016 SEAL (224).
(7) For the right air conditioning pack put the seals (222) and (224) in position on the air conditioning pack (4).
(8) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(9) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(10) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL 64 INSTL (41), or the alternative new AIPC 21-52-03-11-420 SEAL 64 INSTL (39) and the new AIPC 21-52-03-11-420 SEAL 64 INSTL (40) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (42) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL 64 INSTL (141), or the alternative new AIPC 21-52-03-17-340 SEAL 64 INSTL (139) and the new AIPC 21-52-03-17-340 SEAL 64 INSTL (140) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (142) in position in the sleeve (31).
(11) Make sure that the clamp (30) is in position on the duct (43).
(12) Put the sleeve (31) in position on the duct (43) and move it as far on the duct as it will go.
NOTE: Turn the sleeve (31) when you install it. This will help to prevent damage to the seals.
(13) Put the duct (33) in position in the sleeve (32). NOTE: Turn the sleeve (32) and the duct (33) when you move them or when you install them. This will help to prevent damage to the internal seals.
(a) Put the sleeve (32) and the duct (33) in position on the heat exchanger flange (120). NOTE: Make sure that you move the sleeve (32) and the duct (33) as close to the heat exchanger as possible.
(14) Examine the pipe assembly (38), (a) For the left air conditioning pack:
1 Make sure that the O-ring (37) is clean, in a good condition and that it is correctly installed.
2 If necessary replace the AIPC 21-52-41-27-100 PACKING-PREFORMED (37).
3 Apply a small quantity of:
- Dry lubricant-General Assembly Molybdenum Disulfide - (Material No.03QBB9)
or - Dry lubricant-General Assembly Graphite - (Material No.03QBD1)
to the O-ring (37) before you install it.
NOTE: The material 03QBB9 is a molybdenum disulfide powder.
Before you can apply it you must first make it into a paste.
To do this you must mix the powder with pure water or white spirit.
Before you can apply it you must first make it into a paste.
To do this you must mix the powder with pure water or white spirit.
NOTE: The material 03QBD1 is applied dry.
(b) For the right air conditioning pack: 1 Make sure that the O-ring (137) is clean, in a good condition and that it is correctly installed.
2 If necessary replace the AIPC 21-52-41-27-100 PACKING-PREFORMED (137).
(15) Apply a small quantity of:
- Dry lubricant-General Assembly Molybdenum Disulfide - (Material No.03QBB9)
or - Dry lubricant-General Assembly Graphite - (Material No.03QBD1)
to the O-ring (137) before you install it.
NOTE: The material 03QBB9 is a molybdenum disulfide powder.
Before you can apply it you must first make it into a paste.
To do this you must mix the powder with pure water or white spirit.
Before you can apply it you must first make it into a paste.
To do this you must mix the powder with pure water or white spirit.
NOTE: The material 03QBD1 is applied dry.
B. Preparation of the Replacement Component
(1) Remove the blanking plugs from the disconnected line ends.
(2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Make sure that:
(a) For the left air conditioning pack the seals (122) and (124) are clean and in a good condition,
(7) For the right air conditioning pack put the seals (222) and (224) in position on the air conditioning pack (4).
(8) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(9) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(10) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL (37), or the alternative new AIPC 21-52-03-11-420 SEAL 64 INSTL (35) and the new AIPC 21-52-03-11-420 SEAL (36) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (38) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL (137), or the alternative new AIPC 21-52-03-17-340 SEAL (135) and the new AIPC 21-52-03-17-340 SEAL (136) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (138) in position in the sleeve (31).
(11) Make sure that the clamp (30) is in position on the duct (43).
(12) Put the sleeve (31) in position on the duct (43) and move it as far on the duct as it will go.
Subtask 21-52-41-560-050-E ** ON A/C NOT FOR ALL (1) Remove the blanking plugs from the disconnected line ends.
(2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Make sure that:
(a) For the left air conditioning pack the seals (122) and (124) are clean and in a good condition,
- if necessary replace the AIPC 21-52-03-14-015 SEAL (122) and/or the AIPC 21-52-03-14-016 SEAL (124).
- if necessary replace the AIPC 21-52-03-20-015 SEALS (222) and/or the AIPC 21-52-03-20-016 SEAL (224).
(7) For the right air conditioning pack put the seals (222) and (224) in position on the air conditioning pack (4).
(8) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(9) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(10) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL (37), or the alternative new AIPC 21-52-03-11-420 SEAL 64 INSTL (35) and the new AIPC 21-52-03-11-420 SEAL (36) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (38) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL (137), or the alternative new AIPC 21-52-03-17-340 SEAL (135) and the new AIPC 21-52-03-17-340 SEAL (136) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (138) in position in the sleeve (31).
(11) Make sure that the clamp (30) is in position on the duct (43).
(12) Put the sleeve (31) in position on the duct (43) and move it as far on the duct as it will go.
NOTE: Turn the sleeve (31) when you install it. This will help to prevent damage to the seals.
(13) Put the duct (33) in position in the sleeve (32). NOTE: Turn the sleeve (32) and the duct (33) when you move them or when you install them. This will help to prevent damage to the internal seals.
(a) Put the sleeve (32) and the duct (33) in position on the heat exchanger flange (120). NOTE: Make sure that you move the sleeve (32) and the duct (33) as close to the heat exchanger as possible.
B. Preparation of the Replacement Component
(2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) For the left air conditioning pack (10HM):
(a) Make sure that the seals (122) and (124) are clean and in a good condition.
(b) If necessary, replace the AIPC 21-52-03-20-015 SEAL (122) or AIPC 21-52-83-14-110 SEAL (122) and/or the AIPC 21-52-03-20-016 SEAL (124) or AIPC 21-52-83-14-100 SEAL (124) .
(c) Put the seals (122) and (124) in position on the air conditioning pack (4).
(d) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(e) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(7) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL (36) or AIPC 21-52-83-03-320 SEAL (36) and the new AIPC 21-52-03-11-420 SEAL (37) or AIPC 21-52-83-03-320 SEAL (37), or the alternative new AIPC 21-52-03-11-420 SEAL (38) or AIPC 21-52-83-03-320 SEAL (38) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (39) or AIPC 21-52-83-03-350 SEAL (39) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL (136) or AIPC 21-52-83-10-270 SEAL (136) and the new AIPC 21-52-03-17-340 SEAL (137) or AIPC 21-52-83-10-270 SEAL (137), or the alternative new AIPC 21-52-03-17-340 SEAL (138) or AIPC 21-52-83-10-270 SEAL (138) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (139) or AIPC 21-52-83-10-300 SEAL (139) in position in the sleeve (31).
(8) Make sure that the clamp (30) is in position on the duct (35).
(9) Put the sleeve (31) in position on the duct (35) and move it as far on the duct as it will go.
Subtask 21-52-41-420-051-A NOTE: It is no longer required that the bonding strap (87) is fitted for the installation of the air conditioning pack.
(1) Remove the blanking plugs from the disconnected line ends. (2) Remove the protective cover from the cooling elements of the air conditioning pack (4).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) For the left air conditioning pack (10HM):
- Install the temperature control module (Ref. AMM TASK 21-58-54-400-001).
(a) Make sure that the seals (122) and (124) are clean and in a good condition.
(b) If necessary, replace the AIPC 21-52-03-20-015 SEAL (122) or AIPC 21-52-83-14-110 SEAL (122) and/or the AIPC 21-52-03-20-016 SEAL (124) or AIPC 21-52-83-14-100 SEAL (124) .
(c) Put the seals (122) and (124) in position on the air conditioning pack (4).
(d) Put the inlet plenum (127) in position on the air conditioning pack (4) and install the screws (121), the washers (128) and the nuts (129).
(e) Put the bonding strap (88) in position and install the screw (123), the washer (125) and the nut (126) (Ref. AMM TASK 20-28-00-912-802).
(7) Installation of the Seals (Ref. AMM TASK 20-26-00-910-002)
(a) For the left air conditioning pack (10HM):
1 Put the new AIPC 21-52-03-11-420 SEAL (36) or AIPC 21-52-83-03-320 SEAL (36) and the new AIPC 21-52-03-11-420 SEAL (37) or AIPC 21-52-83-03-320 SEAL (37), or the alternative new AIPC 21-52-03-11-420 SEAL (38) or AIPC 21-52-83-03-320 SEAL (38) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-11-075 SEAL (39) or AIPC 21-52-83-03-350 SEAL (39) in position in the sleeve (31).
(b) For the right air conditioning pack (11HM):
1 Put the new AIPC 21-52-03-17-340 SEAL (136) or AIPC 21-52-83-10-270 SEAL (136) and the new AIPC 21-52-03-17-340 SEAL (137) or AIPC 21-52-83-10-270 SEAL (137), or the alternative new AIPC 21-52-03-17-340 SEAL (138) or AIPC 21-52-83-10-270 SEAL (138) in position in the sleeve (32).
2 Put the new AIPC 21-52-03-17-045 SEAL (139) or AIPC 21-52-83-10-300 SEAL (139) in position in the sleeve (31).
(8) Make sure that the clamp (30) is in position on the duct (35).
(9) Put the sleeve (31) in position on the duct (35) and move it as far on the duct as it will go.
NOTE: Turn the sleeve (31) when you install it. This will help to prevent damage to the seals.
(10) Put the duct (33) in position in the sleeve (32). NOTE: Turn the sleeve (32) and the duct (33) when you move them or when you install them. This will help to prevent damage to the internal seals.
(a) Put the sleeve (32) and the duct (33) in position on the heat exchanger flange (120). NOTE: Make sure that you move the sleeve (32) and the duct (33) as close to the heat exchanger as possible.
WARNING:
SUPPORT THE UNIT/ASSEMBLY. THE UNIT/ASSEMBLY IS HEAVY. IF YOU DO NOT SUPPORT IT, IT WILL FALL. THIS CAN CAUSE INJURY TO PERSONS, AND/OR DAMAGE TO EQUIPMENT.
C. Install the Air Conditioning Pack (1) Carefully put the air conditioning pack (4) in position in the aircraft.
NOTE: The air conditioning pack weighs approx. 79 kg (174.1651 lb).
You must take care not to bend or twist the air conditioning pack as this can cause damage to the component.
(2) Put the clevis (93) in position and install the bush (94), (where fitted the washer (95)), the bolt (89), the washer (92) and the nut (91). You must take care not to bend or twist the air conditioning pack as this can cause damage to the component.
(3) Put the tie rods (71), (72), (73), (74), (75), (77), (78), (79), (80), (81), (82) and (83) in position.
(4) Install the bushes (98), (where fitted the washers (97)), the bolts (96), the washers (100) and the nuts (99).
NOTE: The attachment parts must be installed in the tie rods in the following order:
(5) Put the bonding strap (88) in position and install the screw (84), the washer (85) and the nut (86) (Ref. AMM TASK 20-28-00-912-802). - At the tie rod (82), (80), (79), (78), (75), (74), (73), (72), (81), (77), (83) and (71).
(6) Put the bonding straps (102) in position and install the screws (101), the washers (103) and the nuts (104) (Ref. AMM TASK 20-28-00-912-802).
D. Installation and Measurement of the Air Duct Sleeves
(2) Make sure that the clamp (34) has no contact with adjacent ducts.
(3) TORQUE the clamp (34) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
.
(4) Move the sleeve (32) until the "Z" dimensions are approx. equal.
(5) Move the sleeve (31) in position on the air conditioning pack until you get the 4 mm (0.1575 in.) REF. dimension.
(6) Put the clamp (30) in position on the duct (45) and move it until you get the 4 mm (0.1575 in.) REF. dimension.
(7) Tighten the clamp (30).
(8) Do a check of the "X" and the "Y" dimensions at the sleeves (32) and (31).
(a) For the "X" dimension,
Subtask 21-52-41-420-052-B ** ON A/C NOT FOR ALL NOTE: You must turn the sleeves (31) and (32) when you move them. This will help to prevent damage to the swivel joints in the sleeve (31) and the seals in the sleeve (32).
(1) Put the duct (33) in position and install the clamp (34). (2) Make sure that the clamp (34) has no contact with adjacent ducts.
(3) TORQUE the clamp (34) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
. (4) Move the sleeve (32) until the "Z" dimensions are approx. equal.
(5) Move the sleeve (31) in position on the air conditioning pack until you get the 4 mm (0.1575 in.) REF. dimension.
(6) Put the clamp (30) in position on the duct (45) and move it until you get the 4 mm (0.1575 in.) REF. dimension.
(7) Tighten the clamp (30).
(8) Do a check of the "X" and the "Y" dimensions at the sleeves (32) and (31).
(a) For the "X" dimension,
- measure the maximum and the minimum "X" dimensions around the circumference of the sleeve (32),
- the difference between the maximum and the minimum "X" dimensions must not be more than 1.7 mm (0.0669 in.).
- measure the maximum and the minimum "Y" dimensions around the circumference of the sleeve (31),
- the difference between the maximum and the minimum "Y" dimensions must not be more than 1.2 mm (0.0472 in.).
NOTE: You can get the tolerance of 1.7 mm (0.0669 in.) and 1.2 mm (0.0472 in.) if you adjust the tie-rod/s (76) and/or (83).
Adjustment of the tie-rod (76) will give you a vertical difference.
Adjustment of the tie-rod (83) will give you a lateral difference.
You must only adjust the tie-rods (76) and (83).
Safety the tie-rod/s after you adjust them.
Adjustment of the tie-rod (76) will give you a vertical difference.
Adjustment of the tie-rod (83) will give you a lateral difference.
You must only adjust the tie-rods (76) and (83).
Safety the tie-rod/s after you adjust them.
D. Installation and Measurement of the Air Duct Sleeves
(2) Make sure that the clamp (34) has no contact with adjacent ducts.
(3) TORQUE the clamp (34) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
.
(4) Move the sleeve (32) until the "Z" dimensions are approx. equal.
(5) Move the sleeve (31) in position on the air conditioning pack until you get the 4 mm (0.1575 in.) REF. dimension.
(6) Put the clamp (30) in position on the duct (35) and move it until you get the 4 mm (0.1575 in.) REF. dimension.
(7) Tighten the clamp (30).
(8) Do a check of the "X" and the "Y" dimensions at the sleeves (32) and (31).
(a) For the "X" dimension,
Subtask 21-52-41-420-053-A ** ON A/C NOT FOR ALL NOTE: You must turn the sleeves (31) and (32) when you move them. This will help to prevent damage to the swivel joints in the sleeve (31) and the seals in the sleeve (32).
(1) Put the duct (33) in position and install the clamp (34). (2) Make sure that the clamp (34) has no contact with adjacent ducts.
(3) TORQUE the clamp (34) to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in )
. (4) Move the sleeve (32) until the "Z" dimensions are approx. equal.
(5) Move the sleeve (31) in position on the air conditioning pack until you get the 4 mm (0.1575 in.) REF. dimension.
(6) Put the clamp (30) in position on the duct (35) and move it until you get the 4 mm (0.1575 in.) REF. dimension.
(7) Tighten the clamp (30).
(8) Do a check of the "X" and the "Y" dimensions at the sleeves (32) and (31).
(a) For the "X" dimension,
- measure the maximum and the minimum "X" dimensions around the circumference of the sleeve (32),
- the difference between the maximum and the minimum "X" dimensions must not be more than 1.7 mm (0.0669 in.).
- measure the maximum and the minimum "Y" dimensions around the circumference of the sleeve (31),
- the difference between the maximum and the minimum "Y" dimensions must not be more than 1.2 mm (0.0472 in.).
NOTE: You can get the tolerance of 1.7 mm (0.0669 in.) and 1.2 mm (0.0472 in.) if you adjust the tie-rod/s (76) and/or (83).
Adjustment of the tie-rod (76) will give you a vertical difference.
Adjustment of the tie-rod (83) will give you a lateral difference.
You must only adjust the tie-rods (76) and (83).
Safety the tie-rod/s after you adjust them.
Adjustment of the tie-rod (76) will give you a vertical difference.
Adjustment of the tie-rod (83) will give you a lateral difference.
You must only adjust the tie-rods (76) and (83).
Safety the tie-rod/s after you adjust them.
E. Installation of the Electrical and Sense Line Connections
(1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (64) in position on the water extractor (63).
(3) TORQUE the sense line (64) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
.
(4) Put the sense line (57) in position on the temperature pneumatic sensor (58).
(5) TORQUE the sense line (57) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
.
(6) Remove the blanking caps from the disconnected electrical connectors.
(7) Connect the electrical connector (53) to the bypass valve (54).
(8) Connect the electrical connector (52) to the anti ice valve (51).
(9) Connect the electrical connectors (59) and (62) to the temperature sensors (60) and (61).
(10) Connect the electrical connector (56) to the temperature sensor (55).
(11) Connect the electrical connector (66) to the temperature sensor (65).
Subtask 21-52-41-420-053-C ** ON A/C NOT FOR ALL (1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (64) in position on the water extractor (63).
(3) TORQUE the sense line (64) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
. (4) Put the sense line (57) in position on the temperature pneumatic sensor (58).
(5) TORQUE the sense line (57) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
. (6) Remove the blanking caps from the disconnected electrical connectors.
(7) Connect the electrical connector (53) to the bypass valve (54).
(8) Connect the electrical connector (52) to the anti ice valve (51).
(9) Connect the electrical connectors (59) and (62) to the temperature sensors (60) and (61).
(10) Connect the electrical connector (56) to the temperature sensor (55).
(11) Connect the electrical connector (66) to the temperature sensor (65).
E. Installation of the Electrical and Sense Line Connections
(1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (64) in position on the water extractor (63).
(3) TORQUE the sense line (64) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
.
(4) Put the sense line (57) in position on the temperature pneumatic sensor (58).
(5) TORQUE the sense line (57) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
.
(6) Remove the blanking caps from the disconnected electrical connectors.
(7) Connect the electrical connector (53) to the bypass valve (54).
(8) Connect the electrical connector (52) to the anti ice valve (51).
(9) Connect the electrical connectors (59) and (62) to the temperature sensors (60) and (61).
(10) Connect the electrical connector (56) to the temperature sensor (55).
(11) Connect the electrical connector (66) to the temperature sensor (65).
(12) Connect the electrical connector (67) to the solenoid (68).
Subtask 21-52-41-420-053-D ** ON A/C NOT FOR ALL (1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (64) in position on the water extractor (63).
(3) TORQUE the sense line (64) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
. (4) Put the sense line (57) in position on the temperature pneumatic sensor (58).
(5) TORQUE the sense line (57) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
. (6) Remove the blanking caps from the disconnected electrical connectors.
(7) Connect the electrical connector (53) to the bypass valve (54).
(8) Connect the electrical connector (52) to the anti ice valve (51).
(9) Connect the electrical connectors (59) and (62) to the temperature sensors (60) and (61).
(10) Connect the electrical connector (56) to the temperature sensor (55).
(11) Connect the electrical connector (66) to the temperature sensor (65).
(12) Connect the electrical connector (67) to the solenoid (68).
E. Installation of the Electrical and Sense Line Connections
(1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (57) in position on the water extractor (58).
(3) TORQUE the sense line (57) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
.
(4) Remove the blanking caps from the disconnected electrical connectors.
(5) Connect the electrical connector (53) to the bypass valve (54).
(6) Connect the electrical connector (52) to the temperature sensor (51).
(7) Connect the electrical connector (55) to the temperature sensor (56).
(8) Connect the electrical connector (59) to the temperature sensor (60).
Subtask 21-52-41-420-053-E ** ON A/C NOT FOR ALL (1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (57) in position on the water extractor (58).
(3) TORQUE the sense line (57) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
. (4) Remove the blanking caps from the disconnected electrical connectors.
(5) Connect the electrical connector (53) to the bypass valve (54).
(6) Connect the electrical connector (52) to the temperature sensor (51).
(7) Connect the electrical connector (55) to the temperature sensor (56).
(8) Connect the electrical connector (59) to the temperature sensor (60).
E. Installation of the Electrical and Sense Line Connections
(1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (57) in position on the water extractor (58).
(3) TORQUE the sense line (57) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
.
(4) Put the sense line (61) in position on the temperature pneumatic sensor (62).
(5) TORQUE the sense line (61) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
.
(6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connector (53) to the bypass valve (54).
(9) Connect the electrical connector (52) to the temperature sensor (51).
(10) Connect the electrical connector (55) to the temperature sensor (56).
(11) Connect the electrical connector (59) to the temperature sensor (60).
(12) For the left air conditioning pack (10HM):
(a) Connect the electrical connector (63) to the bypass valve (64).
(b) Connect the electrical connector (65) to the pressure sensor (66).
(c) Connect the electrical connector (67) to the temperature sensor (68).
Subtask 21-52-41-420-054-A ** ON A/C NOT FOR ALL (1) Remove the blanking plugs from the disconnected line ends.
(2) Put the sense line (57) in position on the water extractor (58).
(3) TORQUE the sense line (57) connector to between 1.75 and 1.65 m.daN (12.91 and 12.17 lbf.ft )
. (4) Put the sense line (61) in position on the temperature pneumatic sensor (62).
(5) TORQUE the sense line (61) connector to between 1.2 and 1 m.daN (106.19 and 88.50 lbf.in )
. (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connector (53) to the bypass valve (54).
(9) Connect the electrical connector (52) to the temperature sensor (51).
(10) Connect the electrical connector (55) to the temperature sensor (56).
(11) Connect the electrical connector (59) to the temperature sensor (60).
(12) For the left air conditioning pack (10HM):
(a) Connect the electrical connector (63) to the bypass valve (64).
(b) Connect the electrical connector (65) to the pressure sensor (66).
(c) Connect the electrical connector (67) to the temperature sensor (68).
F. Installation of the Duct Connections and Cross Beam
(1) Make sure that the pipe assembly (38) is in the correct position and install the clamp (36).
(2) Make sure that the clamp (36) is in the correct position.
(3) TORQUE the clamp (36) to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in )
.
(4) Put the sleeve (10) in position on the condensor flange (8) and install the clamp (9).
(5) Make sure that the clamp (9) is in the correct position.
(6) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
.
(7) Put the bellows (3) in position on the inlet plenum flange (1) and install the clamp (2).
(8) Put the sleeve (7) in position on the air outlet (5) and install the clamp (6).
(9) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
Subtask 21-52-41-420-054-B ** ON A/C NOT FOR ALL (1) Make sure that the pipe assembly (38) is in the correct position and install the clamp (36).
(2) Make sure that the clamp (36) is in the correct position.
(3) TORQUE the clamp (36) to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in )
. (4) Put the sleeve (10) in position on the condensor flange (8) and install the clamp (9).
(5) Make sure that the clamp (9) is in the correct position.
(6) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
. (7) Put the bellows (3) in position on the inlet plenum flange (1) and install the clamp (2).
(8) Put the sleeve (7) in position on the air outlet (5) and install the clamp (6).
(9) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
F. Installation of the Duct Connections and Cross Beam
(1) Put the sleeve (10) in position on the condensor flange (8) and install the clamp (9).
(2) Make sure that the clamp (9) is in the correct position.
(3) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
.
(4) Put the bellows (3) in position on the inlet plenum flange (1) and install the clamp (2).
(5) Put the sleeve (7) in position on the air outlet (5) and install the clamp (6).
(6) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
Subtask 21-52-41-420-054-C ** ON A/C NOT FOR ALL (1) Put the sleeve (10) in position on the condensor flange (8) and install the clamp (9).
(2) Make sure that the clamp (9) is in the correct position.
(3) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
. (4) Put the bellows (3) in position on the inlet plenum flange (1) and install the clamp (2).
(5) Put the sleeve (7) in position on the air outlet (5) and install the clamp (6).
(6) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
F. Installation of the Duct Connections and Cross Beam
(1) Put the sleeve (10) in position on the condenser flange (8) and install the clamp (9).
(2) Make sure that the clamp (9) is in the correct position.
(3) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
.
(4) Put the bellow (3) in position on the inlet plenum flange (1) and install the clamp (2).
(5) Put the bellow (7) in position on the air outlet (5) and install the clamp (6).
(6) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
(7) For the left air-conditioning pack (10HM):
(a) Put the sleeves (42) in position on the ducts (44) and (45).
(b) Put the ducts (44) and (45) and the bonding straps (47) and (48) in position.
(c) Install the new AIPC 21-58-03-01-450 SEALS (51) or AIPC 21-58-83-01-660 SEALS (51).
(d) Install the washers (40), the screws (46), the washers (49) and the nuts (50).
(e) TORQUE the nuts (50) to between 0.407 and 0.333 m.daN (36.02 and 29.47 lbf.in )
.
(f) Install the clamps (43).
Subtask 21-52-41-420-054-E ** ON A/C NOT FOR ALL (1) Put the sleeve (10) in position on the condenser flange (8) and install the clamp (9).
(2) Make sure that the clamp (9) is in the correct position.
(3) TORQUE the clamp (9) to between 0.308 and 0.252 m.daN (27.26 and 22.30 lbf.in )
. (4) Put the bellow (3) in position on the inlet plenum flange (1) and install the clamp (2).
(5) Put the bellow (7) in position on the air outlet (5) and install the clamp (6).
(6) Put the cross beam (11) in position in the brackets (12) and (15) and install the quick release pins (13) and (14).
(7) For the left air-conditioning pack (10HM):
(a) Put the sleeves (42) in position on the ducts (44) and (45).
(b) Put the ducts (44) and (45) and the bonding straps (47) and (48) in position.
(c) Install the new AIPC 21-58-03-01-450 SEALS (51) or AIPC 21-58-83-01-660 SEALS (51).
(d) Install the washers (40), the screws (46), the washers (49) and the nuts (50).
(e) TORQUE the nuts (50) to between 0.407 and 0.333 m.daN (36.02 and 29.47 lbf.in )
. (f) Install the clamps (43).
F. Installation of the Cross Beam and the Duct Connections
(1) Put the sleeve (10) in its correct installation position on the condenser flange (8).
(2) Install the clamp (9).
(3) Make sure that the clamp (9) is in its correct installation position.
(4) Tighten the clamp (9).
(5) Put the bellow of the air conditioning pack (4) in its correct installation position on the inlet plenum flange (1).
(6) Install the clamp (2).
(7) Tighten the clamp (2).
(8) Put the bellow (7) in its correct installation position on the air outlet (5).
(9) Install the clamps (6) and (53).
(10) Tighten the clamps (6) and (53).
(11) Put the cross beam (11) in its correct installation position in the brackets (12) and (15).
(12) Install the quick-release pins (13) and (14).
(13) Do the steps that follow for the left air-conditioning pack (10HM):
(a) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(b) Install the new AIPC 21-58-83-01-480 SEAL (141).
(c) Put the sleeves (42) in their correct installation positions on the ducts (44) and (45).
(d) Install the new AIPC 21-58-83-01-660 SEALS (51).
(e) Put the ducts (44) and (45) in their correct installation positions.
(f) Put the heat shield (140) in its correct installation position.
(g) Put the bonding straps (47) and (48) in their correct installation positions.
(h) Install the washers (40), screws (46), washers (49) and nuts (50).
(i) Install the clamps (43).
(j) Tighten the nuts (50).
(k) Tighten the clamps (43).
(l) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
Subtask 21-52-41-865-055-A (1) Put the sleeve (10) in its correct installation position on the condenser flange (8).
(2) Install the clamp (9).
(3) Make sure that the clamp (9) is in its correct installation position.
(4) Tighten the clamp (9).
(5) Put the bellow of the air conditioning pack (4) in its correct installation position on the inlet plenum flange (1).
(6) Install the clamp (2).
(7) Tighten the clamp (2).
(8) Put the bellow (7) in its correct installation position on the air outlet (5).
(9) Install the clamps (6) and (53).
(10) Tighten the clamps (6) and (53).
(11) Put the cross beam (11) in its correct installation position in the brackets (12) and (15).
(12) Install the quick-release pins (13) and (14).
(13) Do the steps that follow for the left air-conditioning pack (10HM):
(a) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(b) Install the new AIPC 21-58-83-01-480 SEAL (141).
(c) Put the sleeves (42) in their correct installation positions on the ducts (44) and (45).
(d) Install the new AIPC 21-58-83-01-660 SEALS (51).
(e) Put the ducts (44) and (45) in their correct installation positions.
(f) Put the heat shield (140) in its correct installation position.
(g) Put the bonding straps (47) and (48) in their correct installation positions.
(h) Install the washers (40), screws (46), washers (49) and nuts (50).
(i) Install the clamps (43).
(j) Tighten the nuts (50).
(k) Tighten the clamps (43).
(l) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-52-41-865-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM (PACK 1AIR CONDITIONING) | |||
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM (PACK 2AIR CONDITIONING) | |||
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
H. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-52-41-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | N28 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | IGGS/CTRL | 7YA | P28 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | CSAS / CTRL | 1HW | U17 |
I. Test
(2) Do a leak check of the air conditioning pack.
(5) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
Subtask 21-52-41-710-051-B ** ON A/C NOT FOR ALL WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001). (2) Do a leak check of the air conditioning pack.
NOTE: Minimum leakage is permitted. After the pack operates some minutes, the leakage of air will reduce because the seals have their correct operating temperature.
(3) Do a leak check of the sense line connections. NOTE: Leaks are not permitted.
(4) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001). (5) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
I. Test
(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the air conditioning pack.
(5) Do the operational test of the conditioned service air system with bleed air (Ref. AMM TASK 21-58-00-710-002).
(6) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
5. Close-up(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the air conditioning pack.
NOTE: Minimum leakage is permitted. After the pack operates some minutes, the leakage of air will reduce because the seals have their correct operating temperature.
(3) Do a leak check of the sense line connections. NOTE: Leaks are not permitted.
(4) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001). (5) Do the operational test of the conditioned service air system with bleed air (Ref. AMM TASK 21-58-00-710-002).
(6) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
Subtask 21-52-41-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002).
(a) FOR [10HM] (PACK 1-AIR CONDITIONING)
(b) FOR [11HM] (PACK 2-AIR CONDITIONING)
(3) Remove the WARNING NOTICE(S).
Subtask 21-52-41-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002).
(a) FOR [10HM] (PACK 1-AIR CONDITIONING)
(b) FOR [11HM] (PACK 2-AIR CONDITIONING)
(3) Remove the WARNING NOTICE(S).
Access Panel Location