Removal of the Main Heat Exchanger
TASK 21-52-26-000-001-A
Removal of the Main Heat Exchanger
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-52-26-861-051-A Subtask 21-52-26-865-050-A
Subtask 21-52-26-020-050-A
[Rev.10 from 2021]
2026.04.02 06:47:32 UTC
Removal of the Main Heat Exchanger
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the main heat exchanger 10HM7 and 11HM7.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HM7] (HEAT EXCHANGER-MAIN) | |
| 191KB | |
| FOR [11HM7] (HEAT EXCHANGER-MAIN) | |
| 192KB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-52-24-000-001-A | Removal of the Heat Exchanger Unit (from the Aircraft) |
| TASK 21-52-24-000-001-A-01 | Removal of the Heat Exchanger Unit (From the Air Conditioning Pack) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-52-26-861-051-A Subtask 21-52-26-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-26-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM7 (HEAT EXCHANGERMAIN) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM7 (HEAT EXCHANGERMAIN) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Get Access
(1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(b) FOR [11HM7] (HEAT EXCHANGER-MAIN)
4. Procedure(1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(b) FOR [11HM7] (HEAT EXCHANGER-MAIN)
Subtask 21-52-26-020-050-A
A. Removal of the Main Heat Exchanger
(1) Remove the heat exchanger unit (Ref. AMM TASK 21-52-24-000-001).
(2) Remove the screws (4), washers (3), gasket (2) (if installed) and main heat exchanger (5).
(3) Put the protective covers on the cooling elements of the main heat exchanger (5) and the primary heat exchanger (1).
(4) If the nut (9), washer (10), screw (12) and bonding strap (11) are installed, remove them.
(5) If two plates are installed:
(a) Remove the screws (7), the air-conditioning pack identification-plate (6) and the air-conditioning pack amendment-plate (8) from the removed main heat exchanger (5) and keep them for the installation procedure.
(a) Remove the screws (7), the air-conditioning pack identification-plate/air-conditioning pack amendment-plate (6) from the removed main heat exchanger (5) and keep them for the installation procedure.
(1) Remove the heat exchanger unit (Ref. AMM TASK 21-52-24-000-001).
(2) Remove the screws (4), washers (3), gasket (2) (if installed) and main heat exchanger (5).
(3) Put the protective covers on the cooling elements of the main heat exchanger (5) and the primary heat exchanger (1).
(4) If the nut (9), washer (10), screw (12) and bonding strap (11) are installed, remove them.
(5) If two plates are installed:
(a) Remove the screws (7), the air-conditioning pack identification-plate (6) and the air-conditioning pack amendment-plate (8) from the removed main heat exchanger (5) and keep them for the installation procedure.
NOTE: Airbus recommends that this step is necessary as these plates have the part numbers for the air-conditioning pack.
(6) If one plate is installed:(a) Remove the screws (7), the air-conditioning pack identification-plate/air-conditioning pack amendment-plate (6) from the removed main heat exchanger (5) and keep them for the installation procedure.
NOTE: Airbus recommends that this step is necessary as the plate has the part number for the air-conditioning pack.
Main Heat Exchanger 10HM7 (11HM7) - Component Location