Removal of the Primary Heat Exchanger
TASK 21-52-25-000-001-A
Removal of the Primary Heat Exchanger
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-52-25-865-050-A
Subtask 21-52-25-020-050-A
[Rev.10 from 2021]
2026.04.02 06:47:32 UTC
Removal of the Primary Heat Exchanger
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the primary heat exchanger 10HM6 and 11HM6.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HM6] (HEAT EXCHANGER-PRIMARY) | |
| 191KB | |
| FOR [11HM6] (HEAT EXCHANGER-PRIMARY) | |
| 192KB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-52-24-000-001-A | Removal of the Heat Exchanger Unit (from the Aircraft) |
| TASK 21-52-24-000-001-A-01 | Removal of the Heat Exchanger Unit (From the Air Conditioning Pack) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-52-25-865-050-A
A. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-25-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM6 (HEAT EXCHANGERPRIMARY) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM6 (HEAT EXCHANGERPRIMARY) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
B. Get Access
(1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
4. Procedure(1) Remove the access panel/s (Ref. AMM TASK 53-35-13-000-002).
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
Subtask 21-52-25-020-050-A
A. Removal of the Primary Heat Exchanger
(1) Remove the heat exchanger unit (Ref. AMM TASK 21-52-24-000-001).
(2) Remove the screws (2), washers (3), fan plenum (1) and gasket (4) (if installed).
(3) Remove the screws (8), the washers (7) and the primary heat exchanger (5).
(4) Remove the gasket (6) (if installed).
(5) Put the protective covers on the cooling elements of the primary heat exchanger (5) and the main heat exchanger (9).
(1) Remove the heat exchanger unit (Ref. AMM TASK 21-52-24-000-001).
(2) Remove the screws (2), washers (3), fan plenum (1) and gasket (4) (if installed).
(3) Remove the screws (8), the washers (7) and the primary heat exchanger (5).
(4) Remove the gasket (6) (if installed).
(5) Put the protective covers on the cooling elements of the primary heat exchanger (5) and the main heat exchanger (9).
Primary Heat Exchanger 10HM6 (11HM6) - Component Location