Removal of the Fan Plenum Chamber
TASK 21-52-22-000-001-A
Removal of the Fan Plenum Chamber
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-52-22-861-051-A Subtask 21-52-22-865-050-A
Subtask 21-52-22-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:06:53 UTC
Removal of the Fan Plenum Chamber
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for fan plenum chambers 10HM5 and 11HM5.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | COVER - PROTECTION |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [10HM5] (PLENUM CHAMBER) | |
| 191KB | |
| FOR [11HM5] (PLENUM CHAMBER) | |
| 192KB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-52-23-000-001-A | Removal of the Pipe Assembly between the Main Heat Exchanger and the Air Cycle Machine |
| TASK 21-52-24-000-001-A | Removal of the Heat Exchanger Unit (from the Aircraft) |
| TASK 21-52-24-000-001-A-01 | Removal of the Heat Exchanger Unit (From the Air Conditioning Pack) |
| TASK 21-61-52-000-003-A | Removal of the Ram-Air Outlet |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-52-22-861-051-A Subtask 21-52-22-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-22-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM5 (PLENUM CHAMBER) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM5 (PLENUM CHAMBER) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Get Access
(1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HM5] (PLENUM CHAMBER)
(b) FOR [11HM5] (PLENUM CHAMBER)
Subtask 21-52-22-941-050-A (1) Remove the access panel (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HM5] (PLENUM CHAMBER)
(b) FOR [11HM5] (PLENUM CHAMBER)
D. Safety Precautions
(1) On the overhead panel, on AIR COND panel 30VU:
(a) Make sure that:
(2) On the HP ground connector, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
4. Procedure(1) On the overhead panel, on AIR COND panel 30VU:
(a) Make sure that:
- The APU BLEED pushbutton switch is released (the ON legend is off).
- The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
(2) On the HP ground connector, put the WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-52-22-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Fan Plenum Chamber
(1) Remove the ram air outlet(s) (Ref. AMM TASK 21-61-52-000-003).
(2) Disconnect and remove the clamp (4).
(3) Remove the bellow (5).
(4) Disconnect and remove the clamp (9).
(5) Disconnect the sleeve (10).
(6) Disconnect the bonding strap (8).
(8) Remove the screws (2), the washers (3) and the fan plenum chamber (1).
(9) If the gasket (6) is installed on the fan plenum chamber (1), remove the gasket (6).
(10) Put the COVER - PROTECTION on the cooling elements of the primary heat exchanger (7).
Subtask 21-52-22-020-051-C ** ON A/C NOT FOR ALL (1) Remove the ram air outlet(s) (Ref. AMM TASK 21-61-52-000-003).
(2) Disconnect and remove the clamp (4).
(3) Remove the bellow (5).
(4) Disconnect and remove the clamp (9).
(5) Disconnect the sleeve (10).
(6) Disconnect the bonding strap (8).
NOTE: This work step is only applicable to fan plenum-chamber part-numbers 1816A0000-01, 749A0000-02 Amdt B, 2056A0000-02 Amdt A, 2056B0000-01 Amdt A, 2056C0000-01 and 2056C0000-02.
(7) Remove the screw (2), the washer (3) and the bonding strap (8). (8) Remove the screws (2), the washers (3) and the fan plenum chamber (1).
(9) If the gasket (6) is installed on the fan plenum chamber (1), remove the gasket (6).
(10) Put the COVER - PROTECTION on the cooling elements of the primary heat exchanger (7).
A. Removal of the Fan Plenum Chamber
(1) Remove the ram air outlet/s (Ref. AMM TASK 21-61-52-000-003).
(2) Remove the pipe assembly/ies (Ref. AMM TASK 21-52-23-000-001).
(3) Remove heat exchanger unit/s 10HM4 (11HM4) (Ref. AMM TASK 21-52-24-000-001).
(5) Remove the screws (1), the washers (2) and the fan plenum chamber (3).
(6) Put a COVER - PROTECTION on the cooling elements of the primary heat exchanger (5).
(1) Remove the ram air outlet/s (Ref. AMM TASK 21-61-52-000-003).
(2) Remove the pipe assembly/ies (Ref. AMM TASK 21-52-23-000-001).
(3) Remove heat exchanger unit/s 10HM4 (11HM4) (Ref. AMM TASK 21-52-24-000-001).
NOTE: It is not necessary to remove the inlet plenum at this time.
(4) Disconnect the bonding strap (7):NOTE: This work step is only applicable to fan plenum chamber P/N 1816A0000-01.
(a) Remove the nut (10), the washer (9) and the screw (8) and disconnect the bonding strap (7). (5) Remove the screws (1), the washers (2) and the fan plenum chamber (3).
(6) Put a COVER - PROTECTION on the cooling elements of the primary heat exchanger (5).
Fan Plenum Chamber 10HM5 (11HM5)