W DOC AIRBUS | AMM A320F

Visual Inspection of the Seal of the Plenum Chamber for Disbond


TASK 21-52-00-210-801-A
Visual Inspection of the Seal of the Plenum Chamber for Disbond


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 10HM5
FIN: 11HM5
1. Reason for the Job
NOTE: This procedure is only applicable to plenum chamber with part number(s):
  • 2056A0000-02 Amdt A
  • 2056B0000-01 Amdt A
  • 2056C0000-01
  • 2056C0000-01 Amdt A
  • 2056C0000-02
  • 2056D0000-01
  • 2056D0000-01 Amdt A
  • 2056D0000-02
  • 749A0000-02 Amdt B
  • 1816B0000-01
  • 1816B0000-02
  • 1816B0000-03.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE
No specific
1
FLASHLIGHT
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10HM5] (PLENUM CHAMBER)
191KB
FOR [11HM5] (PLENUM CHAMBER)
192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-22-000-001-A
Removal of the Fan Plenum Chamber
TASK 21-52-22-400-001-A
Installation of the Fan Plenum Chamber
TASK 21-61-52-000-003-A
Removal of the Ram-Air Outlet
TASK 21-61-52-400-003-A
Installation of the Ram-Air Outlet
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-52-00-861-066-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 21-52-00-865-090-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM5 (PLENUM CHAMBER)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM5 (PLENUM CHAMBER)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-00-941-053-A
C. Safety Precautions
   (1) In the cockpit, on overhead panel 30VU:
     (a) Make sure that:
  • The APU BLEED pushbutton switch is released (the ON legend is off)
  • ENG 1 BLEED and ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (b) Put the WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
   (2) On the HP ground connector, put a WARNING NOTICE(S) in position to tell persons not to supply the ground air.
Subtask 21-52-00-010-075-A
D. Get Access
   (1) Put an ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position below the applicable access panel.
   (2) Remove the applicable access panel (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [10HM5] (PLENUM CHAMBER)
191KB.
     (b) FOR [11HM5] (PLENUM CHAMBER)
192KB.
   (3) Remove the applicable ram-air outlet (Ref. AMM TASK 21-61-52-000-003).
4. Procedure
Subtask 21-52-00-210-063-A
A. Visual Inspection of the Seal of the Plenum Chamber for Disbond
   (1) If necessary, use a FLASHLIGHT to do the visual inspection.
   (2) Do a visual inspection of the seal along its circumference for disbond at the plenum chamber outlet.
   (3) Make sure that disbond of the seal is not more than one fourth of the total circumference.
NOTE: The location of disbond can be in one or more than one position.
NOTE: There is no effect on the performance of the plenum chamber if disbond is less than one fourth of the total circumference.
     (a) If disbond is more than one fourth of the total circumference:
       1 Remove the plenum chamber (Ref. AMM TASK 21-52-22-000-001).
       2 Send the plenum chamber to the workshop to repair the seal.
       3 Install a new or serviceable plenum chamber (Ref. AMM TASK 21-52-22-400-001).
   (4) Install the ram-air outlet (Ref. AMM TASK 21-61-52-400-003).
Subtask 21-52-00-865-091-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM5 (PLENUM CHAMBER)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
5. Close-up
Subtask 21-52-00-410-072-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the applicable access panel (Ref. AMM TASK 53-35-13-400-002):
     (a) FOR [10HM5] (PLENUM CHAMBER)
191KB.
     (b) FOR [11HM5] (PLENUM CHAMBER)
192KB.
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
Subtask 21-52-00-862-064-A
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:24 UTC