1. Reason for the Job
Referenced from AMM
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-43-000-001-A
Removal of the Pack Downstream Check-Valves
TASK 21-52-43-400-001-A
Installation of the Pack Downstream Check-Valves
3. Job Set-up
Subtask 21-52-00-010-072-A
A. Remove the pack downstream check-valves as necessary (Ref. AMM TASK 21-52-43-000-001).
4. Procedure
Subtask 21-52-00-210-061-A
A. Detailed Inspection of the Pack Downstream Check-Valve Flappers for Condition and Operation.
   (1) Make sure that the check valve is clean.
   (2) Do a detailed visual inspection for signs of cracks, dents, marks or corrosion of:
  • the valve flap and its seat,
  • the hinge pin and,
  • the spring of the valve flap.
   (3) Move the valve flap with your hand to make sure that it operates smoothly on its hinge pin.
   (4) Make sure that:
  • the valve flap touches its seat correctly and,
  • there are no gaps between the valve flap and the seat.
   (5) If necessary replace the pack downstream check-valve.
5. Close-up
Subtask 21-52-00-410-070-A
A. Install the pack downstream check-valves as necessary (Ref. AMM TASK 21-52-43-400-001).