General Visual Inspection of Water Injector Nozzles for Erosion
TASK 21-52-00-200-012-A
General Visual Inspection of Water Injector Nozzles for Erosion
1. Reason for the Job
Refer to the MPD TASK: 215242-01
GENERAL VISUAL INSPECTION OF WATER INJECTOR NOZZLES FOR EROSION.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 21-52-00-861-064-A Subtask 21-52-00-860-056-A
Subtask 21-52-00-210-059-A
Subtask 21-52-00-865-078-A
[Rev.10 from 2021]
2026.04.02 06:11:25 UTC
General Visual Inspection of Water Injector Nozzles for Erosion
1. Reason for the Job
Refer to the MPD TASK: 215242-01
GENERAL VISUAL INSPECTION OF WATER INJECTOR NOZZLES FOR EROSION.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | FLASHLIGHT |
| No specific | 1 | MIRROR - INSPECTION, FLEXIBLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 21-52-00-960-001-A | Replacement of the Water Injector Nozzle |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 21-52-00-861-064-A Subtask 21-52-00-860-056-A
B. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) Make sure that the BLEED page is shown on the ECAM lower display unit.
(3) Make sure that the PACK 1 and the PACK 2 pushbutton switches on the AIR COND panel 30VU are in the ON position.
Subtask 21-52-00-618-052-A (1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) Make sure that the BLEED page is shown on the ECAM lower display unit.
(3) Make sure that the PACK 1 and the PACK 2 pushbutton switches on the AIR COND panel 30VU are in the ON position.
C. Do the pre-conditioning with the APU (Ref. AMM TASK 12-33-21-618-001) or through the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
4. ProcedureSubtask 21-52-00-210-059-A
A. Visual Inspection
(a) The spray pattern must be regular.
(2) If the spray pattern is irregular, replace the water injector nozzle (Ref. AMM TASK 21-52-00-960-001).
Subtask 21-52-00-860-058-A WARNING:
BE CAREFUL WHEN YOU DO THIS CLEANING PROCEDURE. A VERY STRONG HOT OR COLD AIRFLOW WILL OCCUR IN THE AREA OF THE PACK BAY. THIS AIRFLOW CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR OUTLET FLAPS. MOVEMENT OF THE RAM AIR OUTLET FLAPS AND HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE AREA NEAR THE RAM AIR INLET IS CLEAN AND FREE FROM LOOSE ARTICLES. LOOSE ARTICLES CAN GO INTO THE RAM AIR INLET AND CAUSE DAMAGE TO EQUIPMENT.
(1) Use a FLASHLIGHT and and examine the spray pattern. (a) The spray pattern must be regular.
(2) If the spray pattern is irregular, replace the water injector nozzle (Ref. AMM TASK 21-52-00-960-001).
B. Aircraft Maintenance Configuration
(1) Stop the pre-conditioning with the APU (Ref. AMM TASK 12-33-21-618-001) or through the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
Subtask 21-52-00-865-077-A (1) Stop the pre-conditioning with the APU (Ref. AMM TASK 12-33-21-618-001) or through the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-00-210-060-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 20HM (P1 WATER INJECTOR) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 21HM (P2 WATER INJECTOR) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
D. Visual Inspection
(1) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE and examine the water injector nozzle.
(a) There must be no erosion holes at the hexagonal flange of the water injector nozzle.
(2) If the water injector nozzle is damaged, replace the water injector nozzle (Ref. AMM TASK 21-52-00-960-001).
5. Close-up(1) Use a FLASHLIGHT and a MIRROR - INSPECTION, FLEXIBLE and examine the water injector nozzle.
(a) There must be no erosion holes at the hexagonal flange of the water injector nozzle.
(2) If the water injector nozzle is damaged, replace the water injector nozzle (Ref. AMM TASK 21-52-00-960-001).
Subtask 21-52-00-865-078-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-52-00-860-057-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 20HM (P1 WATER INJECTOR) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 21HM (P2 WATER INJECTOR) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
B. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
Subtask 21-52-00-862-062-A (1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).