W DOC AIRBUS | AMM A320F

General Visual Inspection of the Bellows between the Pack Outlet and the Mixer Unit


TASK 21-52-00-200-011-A
General Visual Inspection of the Bellows between the Pack Outlet and the Mixer Unit


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 10HM
FIN: 11HM
1. Reason for the Job
referenced from TSM
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [10HM] (PACK 1-AIR CONDITIONING)
191BB
FOR [11HM] (PACK 2-AIR CONDITIONING)
192FB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-00-200-013-A
Detailed Inspection of the Pack Downstream Check-Valve Flappers
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-52-00-861-061-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001)
Subtask 21-52-00-865-073-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
49VUAIR COND/FLOW/CTL &/IND11HBD07
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-00-010-070-A
C. Get Access
   (1) Remove the access panels:
(Ref. AMM TASK 53-35-13-000-002).

     (a) FOR [10HM] (PACK 1-AIR CONDITIONING)
     (b) FOR [11HM] (PACK 2-AIR CONDITIONING)
4. Procedure
Subtask 21-52-00-210-058-A
A. General Visual Inspection of the Bellows
   (1) In the air-conditioning pack bay do a general visual inspection of the bellows (1).
   (2) Make sure that the bellows (1) have no damage and are correctly installed.
   (3) If one or both of the bellows are damaged,
5. Close-up
Subtask 21-52-00-865-085-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM (PACK 1AIR CONDITIONING)
49VUAIR COND/FLOW/CTL &/IND11HBD07
** ON A/C NOT FOR ALL
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM (PACK 2AIR CONDITIONING)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-00-410-068-A
B. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels (Ref. AMM TASK 53-35-13-400-002).
     (a) FOR [10HM] (PACK 1-AIR CONDITIONING)
     (b) FOR [11HM] (PACK 2-AIR CONDITIONING)
   (3) Remove the WARNING NOTICE(S).
Subtask 21-52-00-862-060-A
C. De-energize the ground service network
[Rev.10 from 2021] 2026.04.02 06:11:25 UTC