Hot-Air Leak-Check in the Air Conditioning Bay
TASK 21-52-00-200-010-A
Hot-Air Leak-Check in the Air Conditioning Bay
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 21-52-00-861-060-A Subtask 21-52-00-865-071-A
Subtask 21-52-00-790-051-B ** ON A/C NOT FOR ALL
(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do the Check for Hot-Air Leaks
Do this check on all the hot components which are located in the air conditioning bay:
(4) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
Subtask 21-52-00-790-051-D ** ON A/C NOT FOR ALL
Subtask 21-52-00-410-067-A
[Rev.10 from 2021]
2026.04.02 06:11:25 UTC
Hot-Air Leak-Check in the Air Conditioning Bay
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191BB, 191KB, 192KB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-52-00-861-060-A Subtask 21-52-00-865-071-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-52-00-010-068-A 4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/FLOW/MIXER/FLAP | 3HB | V22 |
| 122VU | AIR COND/FLOW/MIXER/FLAP | 3HB | V22 |
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
Subtask 21-52-00-790-051-B ** ON A/C NOT FOR ALL
WARNING:
PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
A. Hot-Air Leak-Check (1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do the Check for Hot-Air Leaks
Do this check on all the hot components which are located in the air conditioning bay:
- The APU bleed-air duct with its sleeves and clamps (1).
- The crossfeed duct with its sleeves and clamps (2).
- The ozone filter (7).
- The flow control valve (3).
- The duct between the flow control valve and the primary heat exchanger (4).
- The duct between the primaray heat exchanger and the compressor of the air cycle machine (5).
- The compressor of the air cycle machine and the main heat exchanger (6).
NOTE: There is a higher risk of leaks at the clamps and seals at the duct connections than at the ducts itselves.
(3) Repair all leaks. (4) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
A. Hot-Air Leak-Check
(2) Do a Check for Hot-Air Leaks
Do this check on all the hot components which are in the air conditioning bay:
(4) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
5. Close-upWARNING:
PUT ON PROTECTIVE GOGGLES AND THERMAL GLOVES WHEN YOU GO NEAR AN AIR-CONDITIONING PACK WHEN IT OPERATES. THERE CAN BE LEAKAGE OF HOT AIR, WHICH CAN CAUSE INJURIES.
(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001). (2) Do a Check for Hot-Air Leaks
Do this check on all the hot components which are in the air conditioning bay:
- The APU bleed-air duct with its sleeves and clamps (1).
- The crossfeed duct with its sleeves and clamps (2).
- The flow control unit (3).
- The ozone filter (7).
- The duct between the flow control unit and the primary heat exchanger (4).
- The duct between the primary heat exchanger and the compressor of the air cycle machine (5).
- The compressor of the air cycle machine and the main heat exchanger (6).
NOTE: There is a higher risk of leaks at the clamps and seals at the duct connections than at the ducts themselves.
(3) Repair all leaks. (4) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
Subtask 21-52-00-410-067-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002)
Subtask 21-52-00-862-059-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002)
Air Conditioning Bay - Component Location