W DOC AIRBUS | AMM A320F

Remove Primary and Main Heat Exchangers for In Shop Cleaning


TASK 21-52-00-100-001-A
Remove Primary and Main Heat Exchangers for In Shop Cleaning


WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
NOTE: The procedure to remove the primary and main heat exchangers is the same for the left and right side.
ZONE: 191
ZONE: 192
FIN: 10HM6
FIN: 10HM7
FIN: 11HM6
FIN: 11HM7
1. Reason for the Job
Refer to the MPD TASK: 215200-01
REMOVE PRIMARY AND MAIN HEAT EXCHANGERS FOR IN SHOP CLEANING.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
191
AIR CONDITIONING COMPT AND FAIRINGS
192
AIR CONDITIONING COMPT AND FAIRINGS
FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
191KB
FOR [10HM7] (HEAT EXCHANGER-MAIN)
191KB
FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
192KB
FOR [11HM7] (HEAT EXCHANGER-MAIN)
192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-52-25-000-001-A
Removal of the Primary Heat Exchanger
TASK 21-52-25-400-001-A
Installation of the Primary Heat Exchanger
TASK 21-52-26-000-001-A
Removal of the Main Heat Exchanger
TASK 21-52-26-400-001-A
Installation of the Main Heat Exchanger
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-52-00-861-053-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-52-00-865-055-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM7 (HEAT EXCHANGERMAIN) FOR FIN: 10HM6 (HEAT EXCHANGERPRIMARY)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM7 (HEAT EXCHANGERMAIN) FOR FIN: 11HM6 (HEAT EXCHANGERPRIMARY)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-00-010-051-A
C. Get Access
   (1) Remove the access panel(s) (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
     (b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
     (c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
     (d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
4. Procedure
Subtask 21-52-00-100-050-A
A. Cleaning of the main heat exchanger and the primary heat exchanger
   (1) Remove the main heat exchanger (Ref. AMM TASK 21-52-26-000-001) and the primary heat exchanger (Ref. AMM TASK 21-52-25-000-001).
   (2) Send the main heat exchanger and the primary heat exchanger to the shop for cleaning.
   (3) Install a new or serviceable main heat exchanger (Ref. AMM TASK 21-52-26-400-001) and a new or serviceable primary heat exchanger (Ref. AMM TASK 21-52-25-400-001).
5. Close-up
Subtask 21-52-00-410-051-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002):
     (a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
     (b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
     (c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
     (d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
Subtask 21-52-00-865-079-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 10HM7 (HEAT EXCHANGERMAIN) FOR FIN: 10HM6 (HEAT EXCHANGERPRIMARY)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
** ON A/C NOT FOR ALL
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
** ON A/C NOT FOR ALL
FOR FIN: 11HM7 (HEAT EXCHANGERMAIN) FOR FIN: 11HM6 (HEAT EXCHANGERPRIMARY)
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-52-00-862-052-A
C. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:25 UTC