Remove Primary and Main Heat Exchangers for In Shop Cleaning
TASK 21-52-00-100-001-A
Remove Primary and Main Heat Exchangers for In Shop Cleaning
Refer to the MPD TASK: 215200-01
REMOVE PRIMARY AND MAIN HEAT EXCHANGERS FOR IN SHOP CLEANING.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-52-00-861-053-A Subtask 21-52-00-865-055-A
Subtask 21-52-00-100-050-A
Subtask 21-52-00-410-051-A
[Rev.10 from 2021]
2026.04.02 06:11:25 UTC
Remove Primary and Main Heat Exchangers for In Shop Cleaning
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
NOTE: The procedure to remove the primary and main heat exchangers is the same for the left and right side.
1. Reason for the JobRefer to the MPD TASK: 215200-01
REMOVE PRIMARY AND MAIN HEAT EXCHANGERS FOR IN SHOP CLEANING.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191 | AIR CONDITIONING COMPT AND FAIRINGS |
| 192 | AIR CONDITIONING COMPT AND FAIRINGS |
| FOR [10HM6] (HEAT EXCHANGER-PRIMARY) | |
| 191KB | |
| FOR [10HM7] (HEAT EXCHANGER-MAIN) | |
| 191KB | |
| FOR [11HM6] (HEAT EXCHANGER-PRIMARY) | |
| 192KB | |
| FOR [11HM7] (HEAT EXCHANGER-MAIN) | |
| 192KB | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-52-25-000-001-A | Removal of the Primary Heat Exchanger |
| TASK 21-52-25-400-001-A | Installation of the Primary Heat Exchanger |
| TASK 21-52-26-000-001-A | Removal of the Main Heat Exchanger |
| TASK 21-52-26-400-001-A | Installation of the Main Heat Exchanger |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-52-00-861-053-A Subtask 21-52-00-865-055-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-52-00-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM7 (HEAT EXCHANGERMAIN) FOR FIN: 10HM6 (HEAT EXCHANGERPRIMARY) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM7 (HEAT EXCHANGERMAIN) FOR FIN: 11HM6 (HEAT EXCHANGERPRIMARY) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
C. Get Access
(1) Remove the access panel(s) (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
(d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
4. Procedure(1) Remove the access panel(s) (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
(d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
Subtask 21-52-00-100-050-A
A. Cleaning of the main heat exchanger and the primary heat exchanger
(1) Remove the main heat exchanger (Ref. AMM TASK 21-52-26-000-001) and the primary heat exchanger (Ref. AMM TASK 21-52-25-000-001).
(2) Send the main heat exchanger and the primary heat exchanger to the shop for cleaning.
(3) Install a new or serviceable main heat exchanger (Ref. AMM TASK 21-52-26-400-001) and a new or serviceable primary heat exchanger (Ref. AMM TASK 21-52-25-400-001).
5. Close-up(1) Remove the main heat exchanger (Ref. AMM TASK 21-52-26-000-001) and the primary heat exchanger (Ref. AMM TASK 21-52-25-000-001).
(2) Send the main heat exchanger and the primary heat exchanger to the shop for cleaning.
(3) Install a new or serviceable main heat exchanger (Ref. AMM TASK 21-52-26-400-001) and a new or serviceable primary heat exchanger (Ref. AMM TASK 21-52-25-400-001).
Subtask 21-52-00-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
(d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
Subtask 21-52-00-865-079-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panel(s) (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [10HM6] (HEAT EXCHANGER-PRIMARY)
(b) FOR [10HM7] (HEAT EXCHANGER-MAIN)
(c) FOR [11HM6] (HEAT EXCHANGER-PRIMARY)
(d) FOR [11HM7] (HEAT EXCHANGER-MAIN)
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-52-00-862-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 10HM7 (HEAT EXCHANGERMAIN) FOR FIN: 10HM6 (HEAT EXCHANGERPRIMARY) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HM7 (HEAT EXCHANGERMAIN) FOR FIN: 11HM6 (HEAT EXCHANGERPRIMARY) | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
Primary and Main Heat Exchangers