W DOC AIRBUS | AMM A320F

Installation of the Air Duct upstream of the Flow Control Unit


TASK 21-51-51-400-002-B
Installation of the Air Duct upstream of the Flow Control Unit


FIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.5 and 0.4 m.daN (44.25 and 35.40 lbf.in ) T
No specific
Torque wrench: range to between 0.93 and 0.81 m.daN (82.30 and 71.68 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [23HB] (FLOW CTL UNIT - PACK 1)
191BB, 191KB
FOR [24HB] (FLOW CTL UNIT - PACK 2)
192FB, 192KB
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
11
SEAL
AIPC 21-51-03-11-090
27
WASHER
AIPC 21-52-03-84-080
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-33-21-618-001-A-01
Pre-conditioning through the HP Ground Connection
TASK 12-33-21-618-001-A-02
Pre-conditioning with the APU
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 21-61-00-710-001-A
Operational Test of the Pack Temperature-Control System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
3. Job Set-up
Subtask 21-51-51-860-053-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that:
     (a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002),
     (b) On the panel 30VU:
       1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
       2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
       3 A warning notice is in position to tell persons not to operate these pushbutton switches.
     (c) On the HP ground connector a warning notice is in position to tell persons not to supply the ground air.
     (d) The access panels are removed (Ref. AMM TASK 53-35-13-000-002):
       1 FOR [23HB] (FLOW CTL UNIT - PACK 1)
191KB and 191BB.
       2 FOR [24HB] (FLOW CTL UNIT - PACK 2)
192KB and 192FB.
Subtask 21-51-51-865-067-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNIT PACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNIT PACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
4. Procedure
Subtask 21-51-51-420-061-A ** ON A/C NOT FOR ALL
A. Installation of the Attachment Components
F Attachment Components - Air Duct ** ON A/C NOT FOR ALL
   (1) Put the support rods (5) in position on the brackets (22) and install the bushings (21), the bolts (20), the washers (23) and the nuts (24).
Subtask 21-51-51-420-062-A ** ON A/C NOT FOR ALL Subtask 21-51-51-220-059-A ** ON A/C NOT FOR ALL
C. Post Installation Measurement and Adjustment
   (1) At the sleeve (24):
  • make sure that the dimension X is 160.5 +3.5 mm or -3.5 mm (6.3189 +0.1378 in. or -0.1378 in.).
   (2) At the support rod (5):
  • make sure that the dimension V between the support rod (5) and the bracket (22) is 1.2 mm (0.0472 in.) minimum.
   (3) If necessary adjust the support-rods to get the correct dimensions V and X:
NOTE: Normally it is only necessary to adjust the aft support rod.
     (a) Bend the tab washer (27) away from the lock-nut (26).
     (b) Loosen the lock-nut (26).
     (c) Remove the rod eye (25) and install a new AIPC 21-52-03-84-080 WASHER (27) on the rod eye thread.
     (d) Install the rod eye (25).
     (e) Turn the rod eye (25) clockwise or counterclockwise until:
  • the dimensions V and X are in the correct limits and
  • the bolt (7) can still easily be installed.
     (f) Make sure that the threads of the rod eye (25) are deep enough in the support rod (5).
NOTE: If you cannot push a needle or equivalent through the inspection hole, then rod eye is deep enough in the support rod.
     (g) Tighten the lock-nut (26).
     (h) Bend the tab washer (27) to safety the lock-nut (26).
Subtask 21-51-51-865-068-A ** ON A/C NOT FOR ALL
D. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNIT PACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNIT PACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-51-51-710-054-A ** ON A/C NOT FOR ALL
E. Test
   (1) Do the pre-conditioning through the HP ground connector (
Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
   (2) Do a leak check of the air duct connections.
NOTE: Minimum leakage is permitted. After the pack operates some minutes, the leakage of air will reduce because the seals have their correct operating temperature.
   (3) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
   (4) Do the operational test of the pack temperature control system (Ref. AMM TASK 21-61-00-710-001).
5. Close-up
Subtask 21-51-51-410-061-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access panels (Ref. AMM TASK 53-35-13-400-002):
     (a) FOR [23HB] (FLOW CTL UNIT - PACK 1)
191KB and 191BB.
     (b) FOR [24HB] (FLOW CTL UNIT - PACK 2)
192KB and 192FB.
Subtask 21-51-51-862-054-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.9 from 2019] 2026.04.02 06:11:23 UTC