Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit


TASK 21-51-51-400-001-A
Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE. HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 11HB ** ON A/C NOT FOR ALL
FIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
FIN: 8HB ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in ) T
No specific
Torque wrench: range to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in ) T
No specific
Torque wrench: range to between 1.05 and 0.95 m.daN (92.92 and 84.07 lbf.in ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03PBB1)
Lubricant-Anti Seize High Temp. -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [11HB] (P1 FLOW CTL VALVE)
191BB, 191KB
FOR [23HB] (FLOW CTL UNIT-PACK 1)
191BB, 191KB
FOR [24HB] (FLOW CTL UNIT-PACK 2)
192FB, 192KB
FOR [8HB] (P2 FLOW CTL VALVE)
192FB, 192KB
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
31
SEAL 64 INSTL
AIPC 21-52-03-11-420
131
SEALS
AIPC 21-52-03-17-340
31
SEAL
AIPC 21-52-83-03-320
131
SEAL
AIPC 21-52-83-10-270
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-33-21-618-001-A-01
Pre-conditioning through the HP Ground Connection
TASK 12-33-21-618-001-A-02
Pre-conditioning with the APU
TASK 20-26-00-910-002-A
Installation of Expansion Joints
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 20-28-00-912-803-A
Bonding Surface Preparation
TASK 21-51-00-710-002-A
Operational Test of the Flow Control and Indicating System
TASK 21-51-41-000-001-A
Removal of the Ozone Filter
TASK 21-51-41-400-001-A
Installation of the Ozone Filter
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
TASK 53-35-13-400-002-A
Installation of the Quick-Release Access Panels on the Belly Fairing Structure
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
F Pack Flow-Control Unit ** ON A/C NOT FOR ALL
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 21-51-51-860-050-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
   (3) In the cockpit, on AIR COND panel 30VU, make sure that:
  • The APU BLEED pushbutton switch is released (the OFF legend is on).
  • The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (a) The WARNING NOTICE(S) is (are) in position to tell persons not to operate these pushbutton switches.
   (4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
   (5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [11HB] (P1 FLOW CTL VALVE)
     (b) FOR [8HB] (P2 FLOW CTL VALVE)
   (6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
Subtask 21-51-51-860-050-D ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
   (2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
   (3) In the cockpit, on AIR COND panel 30VU, make sure that:
  • The APU BLEED pushbutton switch is released (the OFF legend is on).
  • The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
     (a) The WARNING NOTICE(S) is (are) in position to tell persons not to operate these pushbutton switches.
   (4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
   (5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
     (b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
   (6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
Subtask 21-51-51-865-072-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/FIRE/EXTIG/SQUIB/B2WFL39
121VUAPU/FIRE/EXTIG/SQUIB/A1WFL38
** ON A/C NOT FOR ALL
FOR FIN: 11HB (P1 FLOW CTL VALVE)
49VUAIR COND/FLOW/CTL &/IND11HBD07
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 8HB (P2 FLOW CTL VALVE)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNITPACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNITPACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
4. Procedure
Subtask 21-51-51-420-054-A
A. Installation of the Attachment Components
   (1) Apply a small quantity of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the fitting (12) and the bushing (6).
   (2) Put the fitting (12) in position in the brackets (11).
   (3) Install the bushing (6), washer (7) (if removed), bolt (5), washer (4) and nut (3).
   (4) Tighten the nut (3).
Subtask 21-51-51-420-051-D ** ON A/C NOT FOR ALL
B. Installation of the Pack Flow-Control Valve
   (1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
   (2) Remove the protective covers from the pack flow-control valve (17) and the heat exchanger-unit connecting-end (15).
   (3) Clean the component interfaces and the adjacent area.
   (4) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
   (6) Make sure that the components that follow are clean and dry:
     (a) The seal retaining grooves in the sleeve (14)
     (b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
   (7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
NOTE: If the seal is not easy to install, you can make it wet with water.
     (a) For pack flow-control valve 11HB:
     (b) For pack flow-control valve 8HB:
   (8) Put the flange (13) in position in the sleeve (14).
   (9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
   (10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
   (11) Carefully put the pack flow-control valve (17) in position on the fitting (12):
     (a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
   (12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
   (13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
T.
   (14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control valve (17).
   (15) Put the clamp (16) in position on the flange (13) and the pack flow-control valve (17).
   (16) Make sure that the clamp (16) does not touch the adjacent ducts.
   (17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
T.
   (18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
   (19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(
Ref. AMM TASK 20-28-00-912-802).
   (20) Remove the blanking caps from the sense line quick-connectors.
   (21) Connect the sense lines (2) and (4).
   (22) Install the threaded sense line as follows:
     (a) Apply a small amount of Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the sense line connector (5).
     (b) Install the sense line connector (5).
     (c) TORQUE the sense line connector (5) to between 1.05 and 0.95 m.daN (92.92 and 84.07 lbf.in ) T.
   (23) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
   (24) Connect the electrical connector (3).
Subtask 21-51-51-420-051-I ** ON A/C NOT FOR ALL
B. Installation of the Pack Flow-Control Unit
   (1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
   (2) Remove the protective covers from the pack flow-control unit (17) and the heat exchanger-unit connecting-end (15).
   (3) Clean the component interfaces and the adjacent area.
   (4) Make sure that the parts retained from the removed component are clean and in the correct condition.
   (5) Prepare the surface of the bonding point(s)
(
Ref. AMM TASK 20-28-00-912-803).
   (6) Make sure that the components that follow are clean and dry:
     (a) The seal retaining grooves in the sleeve (14)
     (b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
   (7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
NOTE: If the seal is not easy to install, you can make it wet with water.
     (a) For pack flow-control unit 23HB:
     (b) For pack flow-control unit 24HB:
   (8) Put the flange (13) in position in the sleeve (14).
   (9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
   (10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
   (11) Carefully put the pack flow-control unit (17) in position on the fitting (12):
     (a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
   (12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
   (13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
T.
   (14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control unit (17).
   (15) Put the clamp (16) in position on the flange (13) and the pack flow-control system (17).
   (16) Make sure that the clamp (16) does not touch the adjacent ducts.
   (17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
T.
   (18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
   (19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(
Ref. AMM TASK 20-28-00-912-802).
   (20) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION: MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
   (21) Connect the electrical connectors (2), (3) and (4).
Subtask 21-51-51-410-058-B ** ON A/C NOT FOR ALL
C. Installation of the Ozone Filter upstream
   (1) Install the ozone filter upstream of the flow control valve (Ref. AMM TASK 21-51-41-400-001).
Subtask 21-51-51-220-050-B ** ON A/C NOT FOR ALL
D. Post Installation Measurement and Adjustment
   (1) Locations.
     (a) At the sleeve (14):
       1 Move the sleeve (14) until the Z dimensions are approximately equal.
NOTE: Turn the sleeve when you move it.
This will help to prevent damage to the seals in the sleeve.
       2 Do a check of the Y dimension:
  • measure the maximum and minimum Y dimensions around the circumference of the sleeve (14),
  • the difference between the maximum and minimum Y dimensions must not be more than 1.7 mm (0.0669 in.).
     (b) At the fitting (12):
       1 do a check of the dimension V between the fitting (12) and the brackets (11).
  • this dimension must not be less than 1.2 mm (0.0472 in.).
  • You can get these tolerances if you adjust:
         a on the heat exchanger unit the tie-rod (1) and,
         b on the ozone filter the tie rod (1) (Ref. AMM TASK 21-51-41-400-001).

  • You must only adjust the tie-rods (1).
  • Safety the tie-rods (1) after you adjust them.

   (2) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-51-51-410-058-D ** ON A/C NOT FOR ALL
E. Installation of the Ozone Filter upstream of the Flow Control Unit
   (1) Install the ozone filter (Ref. AMM TASK 21-51-41-400-001).
Subtask 21-51-51-220-050-D ** ON A/C NOT FOR ALL
F. Post Installation Measurement and Adjustment
   (1) Locations.
     (a) At the sleeve (14):
       1 Move the sleeve (14) until the Z dimensions are approximately equal.
NOTE: Turn the sleeve when you move it.
This will help to prevent damage to the seals in the sleeve.
       2 Do a check of the Y dimension:
  • measure the maximum and minimum Y dimensions around the circumference of the sleeve (14),
  • the difference between the maximum and minimum Y dimensions must not be more than 1.7 mm (0.0669 in.).
     (b) At the fitting (12):
       1 do a check of the dimension V between the fitting (12) and the brackets (11).
  • this dimension must not be less than 1.2 mm (0.0472 in.).
  • You can get these tolerances if you adjust:
         a on the heat exchanger unit the tie-rod (1) and,
F Pack Flow-Control Unit ** ON A/C NOT FOR ALL
F Pack Flow-Control Valve ** ON A/C NOT FOR ALL
         b on the ozone filter (Ref. AMM TASK 21-51-41-400-001) the tie rod (1).

  • You must only adjust the tie-rods (1).
  • Safety the tie-rods (1) after you adjust them.

   (2) Make sure that the work area is clean and clear of tools and other items.
Subtask 21-51-51-865-073-A
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/FIRE/EXTIG/SQUIB/B2WFL39
121VUAPU/FIRE/EXTIG/SQUIB/A1WFL38
** ON A/C NOT FOR ALL
FOR FIN: 11HB (P1 FLOW CTL VALVE)
49VUAIR COND/FLOW/CTL &/IND11HBD07
122VUAIR COND/PACK TEMP/CTL SYS1/1/115VAC1HHX22
122VUAIR COND/PACK TEMP/CTL SYS1/1/28VDC3HHX21
122VUAIR COND/PACK TEMP CTL SYS2/1/28VDC4HHY19
122VUAIR COND/PACK TEMP CTL SYS2/1/115VAC2HHY18
FOR FIN: 8HB (P2 FLOW CTL VALVE)
122VUAIR COND/FLOW/CTL AND IND/22HBV21
122VUAIR COND/PACK TEMP/CTL SYS1/2/115VAC21HHW22
122VUAIR COND/PACK TEMP/CTL SYS1/2/28VDC23HHW21
122VUAIR COND/PACK TEMP CTL SYS2/2/28VDC24HHY21
122VUAIR COND/PACK TEMP CTL SYS2/2/115VAC22HHY20
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNITPACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNITPACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-51-51-710-050-A ** ON A/C NOT FOR ALL
H. Test
   (1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
   (2) Do a leak check of the pack flow-control valve.
NOTE: Minimum leakage is permitted. After the pack operates some minutes, the leakage of air will reduce because the seals have their correct operating temperature.
   (3) Do a leak check of the sense line connections.
NOTE: Leaks are not permitted.
   (4) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
   (5) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
Subtask 21-51-51-710-050-B ** ON A/C NOT FOR ALL
H. Test
   (1) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
5. Close-up
Subtask 21-51-51-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
     (a) FOR [11HB] (P1 FLOW CTL VALVE)
     (b) FOR [8HB] (P2 FLOW CTL VALVE)
   (3) Remove the WARNING NOTICE(S).
Subtask 21-51-51-410-053-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
     (a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
     (b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
   (3) Remove the WARNING NOTICE(S).
Subtask 21-51-51-862-050-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).