Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit
TASK 21-51-51-400-001-A
Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 21-51-51-860-050-B ** ON A/C NOT FOR ALL
Subtask 21-51-51-420-054-A
Subtask 21-51-51-410-053-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:23 UTC
Installation of the Pack Flow-Control Valve/Pack Flow-Control Unit
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 11HB ** ON A/C NOT FOR ALL
FIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
FIN: 8HB ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
FIN: 8HB ** ON A/C NOT FOR ALL
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03PBB1) | Lubricant-Anti Seize High Temp. - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [11HB] (P1 FLOW CTL VALVE) | |
| 191BB, 191KB | |
| FOR [23HB] (FLOW CTL UNIT-PACK 1) | |
| 191BB, 191KB | |
| FOR [24HB] (FLOW CTL UNIT-PACK 2) | |
| 192FB, 192KB | |
| FOR [8HB] (P2 FLOW CTL VALVE) | |
| 192FB, 192KB | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 31 | SEAL 64 INSTL | AIPC 21-52-03-11-420 |
| 131 | SEALS | AIPC 21-52-03-17-340 |
| 31 | SEAL | AIPC 21-52-83-03-320 |
| 131 | SEAL | AIPC 21-52-83-10-270 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 20-26-00-910-002-A | Installation of Expansion Joints |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 20-28-00-912-803-A | Bonding Surface Preparation |
| TASK 21-51-00-710-002-A | Operational Test of the Flow Control and Indicating System |
| TASK 21-51-41-000-001-A | Removal of the Ozone Filter |
| TASK 21-51-41-400-001-A | Installation of the Ozone Filter |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
Subtask 21-51-51-860-050-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
(3) In the cockpit, on AIR COND panel 30VU, make sure that:
(4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
(5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [11HB] (P1 FLOW CTL VALVE)
(b) FOR [8HB] (P2 FLOW CTL VALVE)
(6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
Subtask 21-51-51-860-050-D ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
(3) In the cockpit, on AIR COND panel 30VU, make sure that:
- The APU BLEED pushbutton switch is released (the OFF legend is on).
- The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
(4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
(5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [11HB] (P1 FLOW CTL VALVE)
(b) FOR [8HB] (P2 FLOW CTL VALVE)
(6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
(3) In the cockpit, on AIR COND panel 30VU, make sure that:
(4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
(5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
(b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
(6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
Subtask 21-51-51-865-072-A (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the WARNING NOTICE(S) is (are) in position in the cockpit to tell persons not to start the APU.
(3) In the cockpit, on AIR COND panel 30VU, make sure that:
- The APU BLEED pushbutton switch is released (the OFF legend is on).
- The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are released (the OFF legends are on).
(4) On the HP ground connector, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to supply the ground air.
(5) Make sure that the access panels are removed (Ref. AMM TASK 53-35-13-000-002):
(a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
(b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
(6) Make sure that the ozone filter is removed (Ref. AMM TASK 21-51-41-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
| 121VU | APU/FIRE/EXTIG/SQUIB/B | 2WF | L39 |
| 121VU | APU/FIRE/EXTIG/SQUIB/A | 1WF | L38 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HB (P1 FLOW CTL VALVE) | |||
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| FOR FIN: 8HB (P2 FLOW CTL VALVE) | |||
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 23HB (FLOW CTL UNITPACK 1) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| FOR FIN: 24HB (FLOW CTL UNITPACK 2) | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
Subtask 21-51-51-420-054-A
A. Installation of the Attachment Components
(1) Apply a small quantity of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the fitting (12) and the bushing (6).
(2) Put the fitting (12) in position in the brackets (11).
(3) Install the bushing (6), washer (7) (if removed), bolt (5), washer (4) and nut (3).
(4) Tighten the nut (3).
Subtask 21-51-51-420-051-D ** ON A/C NOT FOR ALL (1) Apply a small quantity of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the fitting (12) and the bushing (6).
(2) Put the fitting (12) in position in the brackets (11).
(3) Install the bushing (6), washer (7) (if removed), bolt (5), washer (4) and nut (3).
(4) Tighten the nut (3).
B. Installation of the Pack Flow-Control Valve
(1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
(2) Remove the protective covers from the pack flow-control valve (17) and the heat exchanger-unit connecting-end (15).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Make sure that the components that follow are clean and dry:
(a) The seal retaining grooves in the sleeve (14)
(b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
(7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
(9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
(10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
(11) Carefully put the pack flow-control valve (17) in position on the fitting (12):
(a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
(12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
(13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.
(14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control valve (17).
(15) Put the clamp (16) in position on the flange (13) and the pack flow-control valve (17).
(16) Make sure that the clamp (16) does not touch the adjacent ducts.
(17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
.
(18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
(19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
(20) Remove the blanking caps from the sense line quick-connectors.
(21) Connect the sense lines (2) and (4).
(22) Install the threaded sense line as follows:
(a) Apply a small amount of Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the sense line connector (5).
(b) Install the sense line connector (5).
(c) TORQUE the sense line connector (5) to between 1.05 and 0.95 m.daN (92.92 and 84.07 lbf.in )
.
(23) Remove the CAP-BLANKING from each electrical connector and receptacle.
Subtask 21-51-51-420-051-I ** ON A/C NOT FOR ALL (1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
(2) Remove the protective covers from the pack flow-control valve (17) and the heat exchanger-unit connecting-end (15).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Make sure that the components that follow are clean and dry:
(a) The seal retaining grooves in the sleeve (14)
(b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
(7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
NOTE: If the seal is not easy to install, you can make it wet with water.
(a) For pack flow-control valve 11HB: - Put the new AIPC 21-52-03-11-420 SEAL 64 INSTL (31) in position in the sleeve (14).
- Put the new AIPC 21-52-03-11-420 INSTL (31) in position in the sleeve (14).
(9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
(10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
(11) Carefully put the pack flow-control valve (17) in position on the fitting (12):
(a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
(12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
(13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.(14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control valve (17).
(15) Put the clamp (16) in position on the flange (13) and the pack flow-control valve (17).
(16) Make sure that the clamp (16) does not touch the adjacent ducts.
(17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
. (18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
(19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
(20) Remove the blanking caps from the sense line quick-connectors.
(21) Connect the sense lines (2) and (4).
(22) Install the threaded sense line as follows:
(a) Apply a small amount of Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the sense line connector (5).
(b) Install the sense line connector (5).
(c) TORQUE the sense line connector (5) to between 1.05 and 0.95 m.daN (92.92 and 84.07 lbf.in )
. (23) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(24) Connect the electrical connector (3). B. Installation of the Pack Flow-Control Unit
(1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
(2) Remove the protective covers from the pack flow-control unit (17) and the heat exchanger-unit connecting-end (15).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Make sure that the components that follow are clean and dry:
(a) The seal retaining grooves in the sleeve (14)
(b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
(7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
(9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
(10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
(11) Carefully put the pack flow-control unit (17) in position on the fitting (12):
(a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
(12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
(13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.
(14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control unit (17).
(15) Put the clamp (16) in position on the flange (13) and the pack flow-control system (17).
(16) Make sure that the clamp (16) does not touch the adjacent ducts.
(17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
.
(18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
(19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
(20) Remove the CAP-BLANKING from each electrical connector and receptacle.
Subtask 21-51-51-410-058-B ** ON A/C NOT FOR ALL (1) To prevent damage to the related seals and the sliding surfaces of the components, turn the flanges or seals when you move or install them.
(2) Remove the protective covers from the pack flow-control unit (17) and the heat exchanger-unit connecting-end (15).
(3) Clean the component interfaces and the adjacent area.
(4) Make sure that the parts retained from the removed component are clean and in the correct condition.
(5) Prepare the surface of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-803).
(6) Make sure that the components that follow are clean and dry:
(a) The seal retaining grooves in the sleeve (14)
(b) The sliding surfaces of the flange (13) and the heat exchanger-unit connecting-end (15).
(7) Install the seals (Ref. AMM TASK 20-26-00-910-002):
NOTE: If the seal is not easy to install, you can make it wet with water.
(a) For pack flow-control unit 23HB: - Put the new AIPC 21-52-03-11-420 SEAL 64 INSTL (31) or AIPC 21-52-83-03-320 SEAL (31) in position in the sleeve (14).
- Put the new AIPC 21-52-03-17-340 SEALS (131) or AIPC 21-52-83-10-270 SEAL (131) in position in the sleeve (14).
(9) Put the sleeve (14) and the flange (13) together in position on the heat exchanger-unit connecting-end (15).
(10) Move the sleeve (14) and the flange (13) together away from the heat exchanger unit as far as possible.
(11) Carefully put the pack flow-control unit (17) in position on the fitting (12):
(a) Make sure that the arrow on the structure of the pack flow-control valve (17) points in the direction of the heat exchanger unit (15).
(12) Install the spacers (20), bolts (19), washers (26) (if applicable), washers (21) and nuts (22).
(13) TORQUE the nuts (22) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in )
.(14) Carefully move the flange (13) and the sleeve (14) in position on the pack flow-control unit (17).
(15) Put the clamp (16) in position on the flange (13) and the pack flow-control system (17).
(16) Make sure that the clamp (16) does not touch the adjacent ducts.
(17) TORQUE the clamp (16) to between 0.50 and 0.40 m.daN (44.25 and 35.40 lbf.in )
. (18) Put the bonding strap (25) in position and install the screw (18), the washer (24) and the nut (23).
(19) Do the electrical resistance measurement and the final protection of the bonding point(s)
(Ref. AMM TASK 20-28-00-912-802).
(20) Remove the CAP-BLANKING from each electrical connector and receptacle.
CAUTION:
MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S).
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
(21) Connect the electrical connectors (2), (3) and (4). C. Installation of the Ozone Filter upstream
(1) Install the ozone filter upstream of the flow control valve (Ref. AMM TASK 21-51-41-400-001).
Subtask 21-51-51-220-050-B ** ON A/C NOT FOR ALL (1) Install the ozone filter upstream of the flow control valve (Ref. AMM TASK 21-51-41-400-001).
D. Post Installation Measurement and Adjustment
(1) Locations.
(a) At the sleeve (14):
1 Move the sleeve (14) until the Z dimensions are approximately equal.
1 do a check of the dimension V between the fitting (12) and the brackets (11).
b on the ozone filter the tie rod (1) (Ref. AMM TASK 21-51-41-400-001).
Subtask 21-51-51-410-058-D ** ON A/C NOT FOR ALL (1) Locations.
(a) At the sleeve (14):
1 Move the sleeve (14) until the Z dimensions are approximately equal.
NOTE: Turn the sleeve when you move it.
This will help to prevent damage to the seals in the sleeve.
2 Do a check of the Y dimension: This will help to prevent damage to the seals in the sleeve.
- measure the maximum and minimum Y dimensions around the circumference of the sleeve (14),
- the difference between the maximum and minimum Y dimensions must not be more than 1.7 mm (0.0669 in.).
1 do a check of the dimension V between the fitting (12) and the brackets (11).
- this dimension must not be less than 1.2 mm (0.0472 in.).
- You can get these tolerances if you adjust:
b on the ozone filter the tie rod (1) (Ref. AMM TASK 21-51-41-400-001).
- You must only adjust the tie-rods (1).
- Safety the tie-rods (1) after you adjust them.
E. Installation of the Ozone Filter upstream of the Flow Control Unit
(1) Install the ozone filter (Ref. AMM TASK 21-51-41-400-001).
Subtask 21-51-51-220-050-D ** ON A/C NOT FOR ALL (1) Install the ozone filter (Ref. AMM TASK 21-51-41-400-001).
F. Post Installation Measurement and Adjustment
(1) Locations.
(a) At the sleeve (14):
1 Move the sleeve (14) until the Z dimensions are approximately equal.
1 do a check of the dimension V between the fitting (12) and the brackets (11).
b on the ozone filter (Ref. AMM TASK 21-51-41-400-001) the tie rod (1).
Subtask 21-51-51-865-073-A (1) Locations.
(a) At the sleeve (14):
1 Move the sleeve (14) until the Z dimensions are approximately equal.
NOTE: Turn the sleeve when you move it.
This will help to prevent damage to the seals in the sleeve.
2 Do a check of the Y dimension: This will help to prevent damage to the seals in the sleeve.
- measure the maximum and minimum Y dimensions around the circumference of the sleeve (14),
- the difference between the maximum and minimum Y dimensions must not be more than 1.7 mm (0.0669 in.).
1 do a check of the dimension V between the fitting (12) and the brackets (11).
- this dimension must not be less than 1.2 mm (0.0472 in.).
- You can get these tolerances if you adjust:
b on the ozone filter (Ref. AMM TASK 21-51-41-400-001) the tie rod (1).
- You must only adjust the tie-rods (1).
- Safety the tie-rods (1) after you adjust them.
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-51-51-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
| 121VU | APU/FIRE/EXTIG/SQUIB/B | 2WF | L39 |
| 121VU | APU/FIRE/EXTIG/SQUIB/A | 1WF | L38 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 11HB (P1 FLOW CTL VALVE) | |||
| 49VU | AIR COND/FLOW/CTL &/IND1 | 1HB | D07 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| FOR FIN: 8HB (P2 FLOW CTL VALVE) | |||
| 122VU | AIR COND/FLOW/CTL AND IND/2 | 2HB | V21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 23HB (FLOW CTL UNITPACK 1) | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| FOR FIN: 24HB (FLOW CTL UNITPACK 2) | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
H. Test
(1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the pack flow-control valve.
(5) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
Subtask 21-51-51-710-050-B ** ON A/C NOT FOR ALL (1) Do the pre-conditioning through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or with the APU (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of the pack flow-control valve.
NOTE: Minimum leakage is permitted. After the pack operates some minutes, the leakage of air will reduce because the seals have their correct operating temperature.
(3) Do a leak check of the sense line connections. NOTE: Leaks are not permitted.
(4) After approx. 15 minutes stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001). (5) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
H. Test
(1) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
5. Close-up(1) Do the operational test of the flow control and indicating system (Ref. AMM TASK 21-51-00-710-002).
Subtask 21-51-51-410-053-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [11HB] (P1 FLOW CTL VALVE)
(b) FOR [8HB] (P2 FLOW CTL VALVE)
(3) Remove the WARNING NOTICE(S).
Subtask 21-51-51-410-053-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [11HB] (P1 FLOW CTL VALVE)
(b) FOR [8HB] (P2 FLOW CTL VALVE)
(3) Remove the WARNING NOTICE(S).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
(b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
(3) Remove the WARNING NOTICE(S).
Subtask 21-51-51-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels (Ref. AMM TASK 53-35-13-400-002):
(a) FOR [23HB] (FLOW CTL UNIT-PACK 1)
(b) FOR [24HB] (FLOW CTL UNIT-PACK 2)
(3) Remove the WARNING NOTICE(S).
Pack Flow-Control Valve