W DOC AIRBUS | AMM A320F

Removal of the Air Duct upstream of the Flow Control Unit


TASK 21-51-51-000-002-B
Removal of the Air Duct upstream of the Flow Control Unit


FIN: 23HB ** ON A/C NOT FOR ALL
FIN: 24HB ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
COVER - PROTECTION
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [23HB] (FLOW CTL UNIT - PACK 1)
191BB, 191KB
FOR [24HB] (FLOW CTL UNIT - PACK 2)
192FB, 192KB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-51-51-200-002-A
Attachment Components (In-Service Wear Limits) - Air Duct
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 53-35-13-000-002-A
Removal of the Quick-Release Access Panels from the Belly Fairing Structure
3. Job Set-up
Subtask 21-51-51-861-055-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-51-51-865-066-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 23HB (FLOW CTL UNIT PACK 1)
49VUAIR COND/TEMP CTL/SYS 1 CHAN B/28VDC52HHD08
122VUAIR COND/TEMP CTL SYS 1/CHAN A/115VAC49HHX22
122VUAIR COND/TEMP CTL SYS 1/CHAN A/28VDC51HHX21
122VUAIR COND/TEMP CTL SYS 1/CHAN B/115VAC50HHY18
FOR FIN: 24HB (FLOW CTL UNIT PACK 2)
122VUAIR COND/TEMP CTL SYS 2/CHAN A/115VAC53HHW22
122VUAIR COND/TEMP CTL SYS 2/CHAN A/28VDC55HHW21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/28VDC56HHY21
122VUAIR COND/TEMP CTL SYS 2/CHAN B/115VAC54HHY20
Subtask 21-51-51-941-054-A ** ON A/C NOT FOR ALL
C. Safety Precautions
   (1) On the panel 30VU:
     (a) Make sure that:
  • the APU BLEED pushbutton switch is in the off position (the ON legend is off) and,
  • the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
     (b) Put a warning notice in position to tell persons not to operate these pushbutton switches.
   (2) On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.
Subtask 21-51-51-010-062-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Remove the access panels (Ref. AMM TASK 53-35-13-000-002):
     (a) FOR [23HB] (FLOW CTL UNIT - PACK 1)
     (b) FOR [24HB] (FLOW CTL UNIT - PACK 2)
4. Procedure
Subtask 21-51-51-020-069-A ** ON A/C NOT FOR ALL
A. Removal of the Air Duct Assembly
F Attachment Components - Air Duct ** ON A/C NOT FOR ALL
   (1) Remove the nut (1), the washer (2), the screw (3) and disconnect the bonding strap (4).
   (2) Remove the nuts (10), the washers (9) and the bolts (7) from the support rods (5).
   (3) Remove the v-clamps (12) and (13).
   (4) Remove the air duct assembly.
   (5) Remove and discard the o-ring (11).
   (6) Put COVER - PROTECTION on the open duct ends.
Subtask 21-51-51-020-070-A ** ON A/C NOT FOR ALL
B. Removal of the Support Rods
F Attachment Components - Air Duct ** ON A/C NOT FOR ALL
   (1) Remove the nuts (24), the washers (23), the bolts (20), the bushings (21) and the support rods (5) from the attachment brackets (22).
   (2) Do the inspection of the components for in-service wear (Ref. AMM TASK 21-51-51-200-002).
[Rev.9 from 2019] 2026.04.02 06:11:23 UTC