Removal of the Aft Cargo-Trim Air-Valve
TASK 21-43-51-000-001-A
Removal of the Aft Cargo-Trim Air-Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-43-51-861-050-A ** ON A/C NOT FOR ALL Subtask 21-43-51-865-061-A ** ON A/C NOT FOR ALL
Subtask 21-43-51-020-050-B ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:05:44 UTC
Removal of the Aft Cargo-Trim Air-Valve
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
FIN: 12HC ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197BB | |
| 197KB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
Subtask 21-43-51-861-050-A ** ON A/C NOT FOR ALL Subtask 21-43-51-865-061-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-43-51-941-050-C ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
C. Safety Precautions
(1) On the panel 30VU:
(a) Make sure that:
(2) On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.
Subtask 21-43-51-010-050-A ** ON A/C NOT FOR ALL (1) On the panel 30VU:
(a) Make sure that:
- the APU BLEED pushbutton switch is in the off position (the ON legend is off) and,
- the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(2) On the HP ground connector put a warning notice in position to tell persons not to supply the ground air.
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197BB.
(2) Remove the access panel 197BB (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-43-51-010-050-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197BB.
(2) Remove the access panel 197BB (Ref. AMM TASK 53-35-13-000-002).
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197KB.
(2) Remove the access panel 197KB (Ref. AMM TASK 53-35-13-000-002).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at the access panel 197KB.
(2) Remove the access panel 197KB (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-43-51-020-050-B ** ON A/C NOT FOR ALL
A. Removal of the Trim Air Valve
(1) Disconnect the electrical connector (6).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the nut (4), the washers (5), the screw (7) and disconnect the bonding strap (8).
(4) Remove the lock pin (13) from the stowage hole (12).
(5) Turn the manual override lever (10) to the closed position and install the lock pin (13) in the hole (11).
(6) Remove the clamps (3), the trim air valve (9) and the O-rings (2).
(7) Put the PLUG-BLANKING in each disconnected line end.
(1) Disconnect the electrical connector (6).
(2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
(3) Remove the nut (4), the washers (5), the screw (7) and disconnect the bonding strap (8).
(4) Remove the lock pin (13) from the stowage hole (12).
(5) Turn the manual override lever (10) to the closed position and install the lock pin (13) in the hole (11).
(6) Remove the clamps (3), the trim air valve (9) and the O-rings (2).
(7) Put the PLUG-BLANKING in each disconnected line end.
Aft Cargo-Trim Air-Valve