Installation of the AFT Cargo Heat Controller
TASK 21-43-34-400-002-A
Installation of the AFT Cargo Heat Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-43-34-860-051-A ** ON A/C NOT FOR ALL
Subtask 21-43-34-420-051-A ** ON A/C NOT FOR ALL
Subtask 21-43-34-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:20 UTC
Installation of the AFT Cargo Heat Controller
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 121 | AVIONICS COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-43-00-710-003-A | Operational Test of the AFT Cargo Compartment Heating System |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 21-43-34-860-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-43-34-865-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-43-34-010-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
C. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 811.
(2) Make sure that the access door 811 is open (Ref. AMM TASK 52-41-00-010-002).
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 811.
(2) Make sure that the access door 811 is open (Ref. AMM TASK 52-41-00-010-002).
Subtask 21-43-34-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the AFT Cargo Heat Controller
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the AFT cargo heat controller (6) on its rack (8).
(6) Push the AFT cargo heat controller (6) on its rack (8) to connect the electrical connectors (7).
(7) Engage the nut (9) on the lug (10) and tighten.
Subtask 21-43-34-865-062-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Install the AFT cargo heat controller (6) on its rack (8).
(6) Push the AFT cargo heat controller (6) on its rack (8) to connect the electrical connectors (7).
(7) Engage the nut (9) on the lug (10) and tighten.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-43-34-710-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
C. Do an operational test of the AFT cargo compartment heating system (Ref. AMM TASK 21-43-00-710-003).
5. Close-upSubtask 21-43-34-410-051-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 21-43-34-862-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
AFT Cargo Heat Controller