2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-41-51-860-050-A ** ON A/C NOT FOR ALL
Subtask 21-41-51-420-050-A ** ON A/C NOT FOR ALL
Subtask 21-41-51-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:17 UTC
Installation of the Air Outlet Heater
WARNING:
MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN WITH A WARNING PLACARD ATTACHED TO IT.
THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE AIRCRAFT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 811 | |
| FOR [3HE] (HEATER-AIR OUTLET, L) | |
| 211AW, 211BZ | |
| FOR [4HE] (HEATER-AIR OUTLET, R) | |
| 212AW, 212BZ | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-41-00-720-001-A | Functional Test of the Foot Air-Outlet Heater |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-13-41-000-002-A | Removal of the Sidewall Panels |
| TASK 25-13-41-400-002-A | Installation of the Sidewall Panels |
Subtask 21-41-51-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the access door 811.
(3) Make sure that the access door 811 is open.
(4) Make sure that the sidewall panels are removed as necessary (Ref. AMM TASK 25-13-41-000-002):
(a) FOR [3HE] (HEATER-AIR OUTLET, L)
211BZ 211AW
(b) FOR [4HE] (HEATER-AIR OUTLET, R)
212BZ 212AW
(5) On the AIR COND panel 30VU:
(a) Make sure that:
(6) On the HP and LP ground connectors:
Subtask 21-41-51-865-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at the access door 811.
(3) Make sure that the access door 811 is open.
(4) Make sure that the sidewall panels are removed as necessary (Ref. AMM TASK 25-13-41-000-002):
(a) FOR [3HE] (HEATER-AIR OUTLET, L)
211BZ 211AW
(b) FOR [4HE] (HEATER-AIR OUTLET, R)
212BZ 212AW
(5) On the AIR COND panel 30VU:
(a) Make sure that:
- The APU BLEED pushbutton switch is released
- The ENG 1 BLEED and ENG 2 BLEED pushbutton switches are released
- The PACK 1 and PACK 2 pushbutton switches are released.
(6) On the HP and LP ground connectors:
- Make sure that the WARNING NOTICE(S) to tell persons not to supply the ground source, is in position.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | CKPT/FOOT/HEATERS | 1HE | V23 |
Subtask 21-41-51-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Air Outlet Heater
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the air outlet heater (2) in position.
(4) Put the clamp (3) in position.
(5) Install the four screws (7), washers (8) and nuts (9) and tighten.
(6) Install the duct (5) on the air outlet heater (2) and put the clamp (4) in position.
(7) Tighten the clamps (3) and (4).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Connect the electrical connector (6).
Subtask 21-41-51-865-055-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the air outlet heater (2) in position.
(4) Put the clamp (3) in position.
(5) Install the four screws (7), washers (8) and nuts (9) and tighten.
(6) Install the duct (5) on the air outlet heater (2) and put the clamp (4) in position.
(7) Tighten the clamps (3) and (4).
(8) Remove the CAP-BLANKING from each electrical connector and receptacle.
(9) Make sure that all the electrical connections are clean and in the correct condition.
(10) Connect the electrical connector (6).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-41-51-710-050-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | CKPT/FOOT/HEATERS | 1HE | V23 |
Subtask 21-41-51-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the sidewall panels as necessary (Ref. AMM TASK 25-13-41-400-002):
(a) FOR [3HE] (HEATER-AIR OUTLET, L)
211BZ 211AW
(b) FOR [4HE] (HEATER-AIR OUTLET, R)
212BZ 212AW
(3) Close the access door 811.
(4) Remove the access platform(s).
(5) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Subtask 21-41-51-942-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the sidewall panels as necessary (Ref. AMM TASK 25-13-41-400-002):
(a) FOR [3HE] (HEATER-AIR OUTLET, L)
211BZ 211AW
(b) FOR [4HE] (HEATER-AIR OUTLET, R)
212BZ 212AW
(3) Close the access door 811.
(4) Remove the access platform(s).
(5) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
B. Remove the WARNING NOTICE(S).