Installation of the Residual Pressure Control Unit
TASK 21-31-35-400-001-A
Installation of the Residual Pressure Control Unit
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-31-35-860-050-A ** ON A/C NOT FOR ALL
Subtask 21-31-35-420-050-A ** ON A/C NOT FOR ALL
Subtask 21-31-35-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:15 UTC
Installation of the Residual Pressure Control Unit
FIN: 9HL ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 1M(3 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 811 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-31-00-710-802-A | Operational Test of the Residual Pressure Control Unit (RPCU) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
Subtask 21-31-35-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-31-35-865-051-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-31-35-010-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | RPCU | 4HL | X23 |
C. Get Access
(1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the access door 811.
(2) Make sure that the access door 811 is open.
4. Procedure(1) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position at the access door 811.
(2) Make sure that the access door 811 is open.
Subtask 21-31-35-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Residual Pressure Control-Unit
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the control unit (5) on the mounting (1).
(4) Install the washers (6) and the screws (7). Tighten the screws (7).
(5) Put the bonding strap (2) in position and install the screw (4) and the washer (3). Tighten the screw (4).
(6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connectors (8) and (9) to the control unit (5).
Subtask 21-31-35-865-052-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Install the control unit (5) on the mounting (1).
(4) Install the washers (6) and the screws (7). Tighten the screws (7).
(5) Put the bonding strap (2) in position and install the screw (4) and the washer (3). Tighten the screw (4).
(6) Remove the CAP-BLANKING from each electrical connector and receptacle.
(7) Make sure that all the electrical connections are clean and in the correct condition.
(8) Connect the electrical connectors (8) and (9) to the control unit (5).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-31-35-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | RPCU | 4HL | X23 |
C. Do the operational test of the residual pressure control-unit (Ref. AMM TASK 21-31-00-710-802).
5. Close-upNOTE: The outflow valve opens automatically during the operational test in the manual mode.
Subtask 21-31-35-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
Subtask 21-31-35-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 811.
(3) Remove the access platform(s).
Residual Pressure Control Unit