Operational Test of the Residual Pressure Control Unit (RPCU)
TASK 21-31-00-710-802-A
Operational Test of the Residual Pressure Control Unit (RPCU)
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 21-31-00-865-080-A ** ON A/C NOT FOR ALL
Subtask 21-31-00-710-071-A ** ON A/C NOT FOR ALL
5. Close-up
Subtask 21-31-00-860-077-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:48:15 UTC
Operational Test of the Residual Pressure Control Unit (RPCU)
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 21-31-00-865-080-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-31-00-860-076-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/CAB/PRESS/CTL1 | 1HL | D09 |
| 122VU | RPCU | 4HL | X23 |
| 122VU | AIR COND/CAB PRESS/CTL/MAN | 3HL | Y23 |
| 122VU | AIR COND/CAB PRESS/CTL/2 | 2HL | Y22 |
B. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the PRESS pushbutton switch. The CAB PRESS page comes into view on the lower ECAM display unit.
(4) On the AIR COND panel 30VU, make sure that:
4. Procedure(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) On the ECAM control panel, push the PRESS pushbutton switch. The CAB PRESS page comes into view on the lower ECAM display unit.
(4) On the AIR COND panel 30VU, make sure that:
- The PACK 1 and the PACK 2 pushbutton switches are in the OFF position (the OFF legends are on).
- The RAM AIR pushbutton switch is in the OFF position (the ON legend is off).
- The MODE SEL pushbutton switch is in the AUTO configuration (with the FAULT and MAN legends off).
- The LDG ELEV selector is in the AUTO position.
- The DITCHING pushbutton switch is in the AUTO configuration (with the ON legend off).
Subtask 21-31-00-710-071-A ** ON A/C NOT FOR ALL
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE OUTFLOW VALVES ARE CLEAR. MOVEMENT OF THE OUTFLOW VALVES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
A. Operational Test of the RPCU | ACTION | RESULT |
|---|---|
1.On the CABIN PRESS panel 25VU:
| On the CABIN PRESS panel 25VU:
NOTE: The accuracy of the cabin altitude indication in MAN mode is +/- 1100ft. |
| | On the ECAM lower display unit:
|
|
|
|
|
|
|
2.On the CABIN PRESS panel 25VU:
| On the CABIN PRESS panel 25VU:
|
| | On the ECAM lower display unit:
|
Subtask 21-31-00-860-077-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).