W DOC AIRBUS | AMM A320F

Reactivation of the CPC2


TASK 21-31-00-440-003-A
Reactivation of the CPC2


1. Reason for the Job
MMEL 21-31-01B
AUTOMATIC CABIN PRESSURE CONROL SYSTEM (CPC, OUTFLOW VALVE AUTO CHANNEL) (FAA ONLY)
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 21-31-00-710-002-A
Operational Test of the Pressure Control and Monitoring
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 21-31-00-861-068-A
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 21-31-00-865-071-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VUAIR COND/CAB PRESS/CTL/22HLY22
4. Procedure
Subtask 21-31-00-710-068-A
A. Operational Test of the Pressure Control and Monitoring (Ref. AMM TASK 21-31-00-710-002).
5. Close-up
Subtask 21-31-00-862-064-A
A. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:13 UTC