Installation of the FWD Cargo Compartment Extraction Fan
TASK 21-28-53-400-001-A
Installation of the FWD Cargo Compartment Extraction Fan
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-28-53-860-050-A ** ON A/C NOT FOR ALL Subtask 21-28-53-941-052-A ** ON A/C NOT FOR ALL
Subtask 21-28-53-420-050-A ** ON A/C NOT FOR ALL
Subtask 21-28-53-410-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:12 UTC
Installation of the FWD Cargo Compartment Extraction Fan
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
CAUTION:
BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 132 | FORWARD CARGO COMPARTMENT |
| 132KW, 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-28-00-710-004-A | Operational Test of the FWD Cargo-Compartment Outlet Isolation-Valve in the Ditching Configuration |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-54-12-000-003-A | Removal of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-003-A | Installation of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 21-28-53-860-050-A ** ON A/C NOT FOR ALL Subtask 21-28-53-941-052-A ** ON A/C NOT FOR ALL
B. Safety Precautions
(1) In the cockpit, on the overhead panel, on the AIR COND section of panel 30VU:
(a) Make sure that:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
3 The PACK 1 and PACK 2 pushbutton switches are released (the OFF legends are on).
(b) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate these pushbutton switches.
(2) On the HP and the LP ground connectors:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to supply the ground air.
Subtask 21-28-53-865-054-A ** ON A/C NOT FOR ALL (1) In the cockpit, on the overhead panel, on the AIR COND section of panel 30VU:
(a) Make sure that:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
3 The PACK 1 and PACK 2 pushbutton switches are released (the OFF legends are on).
(b) Make sure that the WARNING NOTICE(S) are in position to tell persons not to operate these pushbutton switches.
(2) On the HP and the LP ground connectors:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to supply the ground air.
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-28-53-010-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/FWD CARGO/VENT/CTL & MONG | 2HN | C08 |
| 122VU | FWD CARGO VENT AND HTG/FAN | 1HN | T22 |
D. Get Access
(1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at forward cargo-compartment door 825.
(2) Make sure that forward cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that sidewall panel 132KW is removed (Ref. AMM TASK 25-54-12-000-003).
Subtask 21-28-53-210-050-A ** ON A/C NOT FOR ALL (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position at forward cargo-compartment door 825.
(2) Make sure that forward cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001).
(3) Make sure that sidewall panel 132KW is removed (Ref. AMM TASK 25-54-12-000-003).
E. Make sure that the clamps, the flexible sleeve and the fan are in the correct condition. Replace them if necessary.
4. ProcedureSubtask 21-28-53-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Extraction Fan
(1) Clean the component interfaces and the adjacent area.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) Install the flexible sleeve (6) on the valve (8).
(4) Install the fan (3) in the flexible sleeve (6).
(6) Make sure that the fan (3) is in the correct angular position.
The electrical cable must not be too tight or too loose.
(7) Install the clamp (2) and torque to the value given on the clamp.
(8) Put the flexible sleeve (6) in position.
(9) Install the clamps (5) and (7) and tighten them.
(10) Tighten the clamp (4).
(11) Remove the CAP-BLANKING from each electrical connector and receptacle.
(12) Make sure that all the electrical connections are clean and in the correct condition.
(13) Connect the electrical connector (10).
(14) Connect the bonding strip (9).
Subtask 21-28-53-865-055-A ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) Install the flexible sleeve (6) on the valve (8).
(4) Install the fan (3) in the flexible sleeve (6).
NOTE: The arrow which shows the airflow direction points rearward.
(5) Install the clamp (4). Do not fully tighten at this time. (6) Make sure that the fan (3) is in the correct angular position.
The electrical cable must not be too tight or too loose.
(7) Install the clamp (2) and torque to the value given on the clamp.
(8) Put the flexible sleeve (6) in position.
(9) Install the clamps (5) and (7) and tighten them.
(10) Tighten the clamp (4).
(11) Remove the CAP-BLANKING from each electrical connector and receptacle.
(12) Make sure that all the electrical connections are clean and in the correct condition.
(13) Connect the electrical connector (10).
(14) Connect the bonding strip (9).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-28-53-710-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/FWD CARGO/VENT/CTL & MONG | 2HN | C08 |
| 122VU | FWD CARGO VENT AND HTG/FAN | 1HN | T22 |
C. Do an operational test of the FWD cargo compartment ventilation (Ref. AMM TASK 21-28-00-710-004).
5. Close-upSubtask 21-28-53-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install sidewall panel 132KW (Ref. AMM TASK 25-54-12-400-003).
(3) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Subtask 21-28-53-862-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install sidewall panel 132KW (Ref. AMM TASK 25-54-12-400-003).
(3) Close forward cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
Extraction Fan