W DOC AIRBUS | AMM A320F

Installation of the AFT Cargo-Compartment Ventilation Isolation-Valves


TASK 21-28-52-400-001-A
Installation of the AFT Cargo-Compartment Ventilation Isolation-Valves


FIN: 33HN ** ON A/C NOT FOR ALL
FIN: 34HN ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
No specific
Torque wrench: range to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in ) T
FOR [34HN] (ISOL VALVE AFT CARGO INLET)
No specific
Torque wrench: range to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
826
FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
162DW
FOR [34HN] (ISOL VALVE AFT CARGO INLET)
151EW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-28-00-710-006-A
Operational Test of the AFT Cargo-Compartment Ventilation-System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F AFT Cargo Isolation Valves ** ON A/C NOT FOR ALL
F AFT Cargo Isolation Valves ** ON A/C NOT FOR ALL
FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 25-55-12-400-001-A
Installation of the Aft Cargo-Compartment Partition at FR65
FOR [34HN] (ISOL VALVE AFT CARGO INLET)
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 25-55-11-400-003-A
Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59
3. Job Set-up
Subtask 21-28-52-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that:
     (a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
     (b) The AFT cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
     (c) The ACCESS PLATFORM 2M (6 FT) is in position at the AFT cargo-compartment door 826.
     (d) The access panel is removed.
       1 FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
  • 161DW.
       2 FOR [34HN] (ISOL VALVE AFT CARGO INLET)
  • 151EW.
   (2) On the panel 30VU:
     (a) Make sure that:
       1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
       2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
       3 The warning notice is in position to tell persons not to operate these pushbutton switches.
   (3) On the HP and the LP ground connectors the warning notice is in position to tell persons not to supply the ground air.
Subtask 21-28-52-860-050-C ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that:
     (a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
     (b) The AFT cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001).
     (c) The ACCESS PLATFORM 2M (6 FT) is in position at the AFT cargo-compartment door 826.
     (d) The access panel is removed:
       1 FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
  • 162DW.
       2 FOR [34HN] (ISOL VALVE AFT CARGO INLET)
  • 151VW.
   (2) On the panel 30VU:
     (a) Make sure that:
       1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
       2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
       3 The warning notice is in position to tell persons not to operate these pushbutton switches.
   (3) On the HP and the LP ground connectors the warning notice is in position to tell persons not to supply the ground air.
Subtask 21-28-52-865-051-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT/CTL & MONG31HNC07
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT & HTG/CTL & MONG31HNC07
** ON A/C NOT FOR ALL
122VUAIR COND/AFT CARGO VENT/FAN30HNS22
Subtask 21-28-52-865-065-A ** ON A/C NOT FOR ALL
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT/CTL & MONG31HNC07
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT & HTG/CTL & MONG31HNC07
4. Procedure
Subtask 21-28-52-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Isolation Valve
   (1) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
     (a) Remove the blanking plugs from the isolation valve (11), the sleeve (1), and the duct flange (2).
     (b) Clean the component interfaces and the adjacent area.
     (c) Make sure that the parts retained from the removed component are clean and in the correct condition.
     (d) Put the isolation valve (11) in position and engage the pin (4) in the cutout in the duct flange (2).
     (e) Install the clamp (3).
     (f) TORQUE the clamp (3) to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in ) T.
     (g) Put the clamp (12) and the sleeve (1) in position on the isolation valve (11).
NOTE: The end of the sleeve (1) must be within the coloured markings on the isolation valve (11).
     (h) Tighten the clamp (12).
     (i) Put the bonding strap (9) in position and install the washer (8), the screw (7), the washer (6) and the nut (5) (
Ref. AMM TASK 20-28-00-912-802).
     (j) Remove the blanking caps from the disconnected electrical connectors.
     (k) Make sure that all the electrical connections are clean and in the correct condition.
     (l) Connect the electrical connector (10).
   (2) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
     (a) Remove the blanking plugs from the isolation valve (24), the sleeve (15) and the duct flange (13).
     (b) Clean the component interfaces and the adjacent area.
     (c) Make sure that the parts retained from the removed component are clean and in the correct condition.
     (d) Put the isolation valve (24) in position and engage the pin (26) in the cutout in the duct flange (15).
     (e) Put the clamp (25) in position on the isolation valve (24) and the duct flange (13).
NOTE: Do not fully tighten the clamp (25) at this time.
     (f) Put the clamp (17) in position on the bracket (14) and the isolation valve (24).
NOTE: Do not fully tighten the clamp (17) at this time.
     (g) Make sure that the clamp (25) is in the correct position.
     (h) TORQUE the clamp (25) to between 0.56 and 0.51 m.daN (49.56 and 45.13 lbf.in ) T.
NOTE: When you look in the direction of the air flow the attach device of the clamp (25) must be between the 7 o'clock and the 8 o'clock position.
     (i) Tighten the clamp (17).
     (j) Put the clamp (16) and the sleeve (15) in position on the isolation valve (24).
NOTE: The end of the sleeve (15) must be within the coloured markings on the isolation valve (24).
     (k) Tighten the clamp (16).
     (l) Put the bonding strap (21) in position and install the washer (20), the screw (19), the washer (22) and the nut (23) (
Ref. AMM TASK 20-28-00-912-802).
     (m) Remove the blanking caps from the disconnected electrical connectors.
     (n) Make sure that all the electrical connections are clean and in the correct condition.
     (o) Connect the electrical connector (18).
Subtask 21-28-52-865-060-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT/CTL & MONG31HNC07
** ON A/C NOT FOR ALL
49VUAIR COND/AFT CARGO/VENT & HTG/CTL & MONG31HNC07
** ON A/C NOT FOR ALL
122VUAIR COND/AFT CARGO VENT/FAN30HNS22
Subtask 21-28-52-710-050-A ** ON A/C NOT FOR ALL
C. Do the operational test of the AFT cargo-compartment ventilation system (Ref. AMM TASK 21-28-00-710-006).
5. Close-up
Subtask 21-28-52-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel:
     (a) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
     (b) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
   (3) Remove the access platform(s).
   (4) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the WARNING NOTICE(S).
Subtask 21-28-52-410-050-C ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the access panel(s):
     (a) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
     (b) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
   (3) Remove the access platform(s).
   (4) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
   (5) Remove the WARNING NOTICE(S).
Subtask 21-28-52-862-051-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:11:12 UTC