W DOC AIRBUS | AMM A320F

Installation of the Fwd Cargo Compartment Differential Pressure Switch


TASK 21-28-11-400-001-A
Installation of the Fwd Cargo Compartment Differential Pressure Switch


ZONE: 132
FIN: 21HN ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
132
FORWARD CARGO COMPARTMENT
132KW, 825
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 21-28-00-710-004-A
Operational Test of the FWD Cargo-Compartment Outlet Isolation-Valve in the Ditching Configuration
3. Job Set-up
Subtask 21-28-11-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/FWD CARGO/VENT/CTL & MONG2HNC08
122VUFWD CARGO VENT AND HTG/FAN1HNT22
Subtask 21-28-11-860-050-A ** ON A/C NOT FOR ALL
B. Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position.
Subtask 21-28-11-010-051-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Make sure that the access door 825 is open.
   (2) Make sure that the panel 132KW is removed.
Subtask 21-28-11-210-050-A ** ON A/C NOT FOR ALL
D. Make sure that the unions are not clogged and that the union threads are not damaged.
Subtask 21-28-11-160-050-A ** ON A/C NOT FOR ALL
E. Clean the component interfaces and the adjacent area.
4. Procedure
Subtask 21-28-11-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Pressure Switch
   (1) Install the pressure switch (5).
   (2) Install the washers (3), the screws (4) and tighten the screws.
   (3) Remove the blanking plug from the pipe (1).
   (4) Install the pipe (1).
   (5) Remove the blanking cap from the electrical connector (2) and make sure that the electrical connector is clean and in the correct condition.
   (6) Connect the electrical connector (2).
Subtask 21-28-11-942-050-A ** ON A/C NOT FOR ALL
B. Make sure that the work area is clean and clear of tools and other items.
Subtask 21-28-11-865-052-A ** ON A/C NOT FOR ALL
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/FWD CARGO/VENT/CTL & MONG2HNC08
122VUFWD CARGO VENT AND HTG/FAN1HNT22
Subtask 21-28-11-710-050-A ** ON A/C NOT FOR ALL
D. Do an operational test of the FWD cargo compartment ventilation (Ref. AMM TASK 21-28-00-710-004).
5. Close-up
Subtask 21-28-11-410-050-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Install the panel 132KW.
   (2) Close the access door 825.
   (3) Remove the access platform(s).
[Rev.10 from 2021] 2026.04.02 06:11:11 UTC