Deactivation of the Aft-Cargo-Compartment Ventilation Isolation-Valves
TASK 21-28-00-040-002-A
Deactivation of the Aft-Cargo-Compartment Ventilation Isolation-Valves
MMEL 21-28-04B
AFT CARGO ISOLATION VALVE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-28-00-861-058-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-085-A ** ON A/C NOT FOR ALL
Subtask 21-28-00-040-053-A ** ON A/C NOT FOR ALL
Subtask 21-28-00-865-092-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:11:10 UTC
Deactivation of the Aft-Cargo-Compartment Ventilation Isolation-Valves
ZONE: 150
ZONE: 160
ZONE: 170
FIN: 33HN ** ON A/C NOT FOR ALL
FIN: 34HN ** ON A/C NOT FOR ALL
Task Summary
1. Reason for the JobZONE: 160
ZONE: 170
FIN: 33HN ** ON A/C NOT FOR ALL
FIN: 34HN ** ON A/C NOT FOR ALL
Task Summary
| Access | Test | Specific Tools | Mhr | E/T | Nb Men |
|---|---|---|---|---|---|
| YES | YES | NO | 0.5 | 0.5 | 1 |
MMEL 21-28-04B
AFT CARGO ISOLATION VALVE
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| 160 | BULK CARGO COMPARTMENT AFT BULKHEAD OF AFT CARGO COMPARTMENT TO AFT BULKHEAD OF BULK CARGO COMPARTMENT |
| 170 | AFT CAB U/FLOOR COMPT AFT BHD OF BULK |
| 826 | |
| FOR [33HN] (ISOL VALVE AFT CARGO OUTLET) | |
| 162DW | |
| FOR [34HN] (ISOL VALVE AFT CARGO INLET) | |
| 151EW | |
| 151VW | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| FOR [33HN] (ISOL VALVE AFT CARGO OUTLET) | |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| FOR [34HN] (ISOL VALVE AFT CARGO INLET) | |
| TASK 25-55-11-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-11-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
Subtask 21-28-00-861-058-A ** ON A/C NOT FOR ALL Subtask 21-28-00-865-085-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-28-00-010-055-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
C. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door (door 826).
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Remove access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Remove access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-010-055-C ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door (door 826).
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Remove access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Remove access panel 151EW (Ref. AMM TASK 25-55-11-000-003).
C. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door (door 826).
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Remove access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Remove access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) below the aft cargo-compartment door (door 826).
(2) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Remove access panel 162DW (Ref. AMM TASK 25-55-12-000-001).
(4) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Remove access panel 151VW (Ref. AMM TASK 25-55-11-000-003).
Subtask 21-28-00-040-053-A ** ON A/C NOT FOR ALL
A. Deactivation of the Aft-Cargo-Compartment Ventilation Isolation-Valves
Cargo-Compartment Ventilation Isolation-Valves ** ON A/C NOT FOR ALL
Cargo-Compartment Ventilation Isolation-Valves ** ON A/C NOT FOR ALL
(1) On the isolation valves (2), move the manual override levers (1) to the closed position.
(2) Disconnect the electrical connectors (3) (33HN-A and 34 HN-A) and safety them to the aircraft structure.
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
5. Close-up
Cargo-Compartment Ventilation Isolation-Valves ** ON A/C NOT FOR ALL
Cargo-Compartment Ventilation Isolation-Valves ** ON A/C NOT FOR ALL (2) Disconnect the electrical connectors (3) (33HN-A and 34 HN-A) and safety them to the aircraft structure.
(3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
Subtask 21-28-00-865-092-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-28-00-865-093-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-28-00-410-056-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Install access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Make an entry in the aircraft log book to record the deactivation.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Remove the access platform(s).
Subtask 21-28-00-410-056-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Install access panel 151EW (Ref. AMM TASK 25-55-11-400-003).
(4) Make an entry in the aircraft log book to record the deactivation.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Remove the access platform(s).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Install access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Make an entry in the aircraft log book to record the deactivation.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Remove the access platform(s).
Subtask 21-28-00-862-056-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) FOR [33HN] (ISOL VALVE AFT CARGO OUTLET)
Install access panel 162DW (Ref. AMM TASK 25-55-12-400-001).
(3) FOR [34HN] (ISOL VALVE AFT CARGO INLET)
Install access panel 151VW (Ref. AMM TASK 25-55-11-400-003).
(4) Make an entry in the aircraft log book to record the deactivation.
(5) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(6) Remove the access platform(s).