Operational Test of the Skin-Exchanger Outlet Bypass-Valve without the Centralized Fault Display System (CFDS)
TASK 21-26-55-710-001-A
Operational Test of the Skin-Exchanger Outlet Bypass-Valve without the Centralized Fault Display System (CFDS)
1. Reason for the Job
Test after the removal/installation of the skin-exchanger outlet bypass-valve 23HQ if the CFDS is unserviceable.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-26-55-861-056-A Subtask 21-26-55-865-059-A
Subtask 21-26-55-710-053-A
Subtask 21-26-55-410-055-A Subtask 21-26-55-860-055-A Subtask 21-26-55-862-056-A
[Rev.10 from 2021]
2026.04.02 06:11:09 UTC
Operational Test of the Skin-Exchanger Outlet Bypass-Valve without the Centralized Fault Display System (CFDS)
1. Reason for the Job
Test after the removal/installation of the skin-exchanger outlet bypass-valve 23HQ if the CFDS is unserviceable.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 812 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 21-26-55-861-056-A Subtask 21-26-55-865-059-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-26-55-860-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
C. Aircraft Maintenance Configuration
(1) Make sure that the throttle control levers of the engines 1 and 2 are at idle.
(2) On the VENTILATION section of the overhead control and indicating panel 22VU:
(Ref. AMM TASK 31-60-00-860-001).
Subtask 21-26-55-010-054-A (1) Make sure that the throttle control levers of the engines 1 and 2 are at idle.
(2) On the VENTILATION section of the overhead control and indicating panel 22VU:
- make sure that the BLOWER and EXTRACT pushbutton switches are in the AUTO configuration (pushed with the FAULT and OVRD legends off).
(Ref. AMM TASK 31-60-00-860-001).
D. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 812.
(2) Open the access door 812.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 812.
(2) Open the access door 812.
Subtask 21-26-55-710-053-A
A. Operational Test of the Skin-Exchanger Outlet Bypass-Valve (23HQ)
5. Close-up| ACTION | RESULT |
|---|---|
1.On the rear circuit breaker panel 122VU:
| On the VENTILATION section of the overhead control and indicating panel 22VU:
|
2.On the rear circuit breaker panel 122VU:
| On the VENTILATION section of the overhead control and indicating panel 22VU:
|
Subtask 21-26-55-410-055-A Subtask 21-26-55-860-055-A Subtask 21-26-55-862-056-A