W DOC AIRBUS | AMM A320F

Removal of the Avionics Ventilation Skin Exchanger Inlet Bypass Valve


TASK 21-26-55-000-001-B
Removal of the Avionics Ventilation Skin Exchanger Inlet Bypass Valve


ZONE: 128
FIN: 16HQ
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128
REAR AVIONIC COMPARTMENT
128EG, 824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 53-12-13-000-001-A
Removal of the avionics compartment floor panels
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-55-861-057-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-55-865-060-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
Subtask 21-26-55-010-055-A
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
   (2) Open the access door 824.
   (3) Remove the access panel 128EG (Ref. AMM TASK 53-12-13-000-001).
4. Procedure
Subtask 21-26-55-020-054-B
A. Removal of the Skin Exchanger Inlet Bypass Valve
   (1) Disconnect the electrical connector (14) from the valve (15).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Remove the clamps (13) and (11).
NOTE: Do not discard the clamps (13) and (11). You must keep and use them during the installation procedure.
   (4) Move the flexible sleeve (12) which is on the duct (10) to disengage the valve (15).
   (5) Remove the clamp (17) and the valve (15).
   (6) Discard the O-ring (16).
   (7) Remove the flexible sleeve (12).
   (8) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.02 06:11:09 UTC