Operational Test of the Extract and Blower Fans (without the CFDS)
TASK 21-26-51-710-001-A
Operational Test of the Extract and Blower Fans (without the CFDS)
1. Reason for the Job
To do the test after the removal/installation of the blower fan or the extract fan if the CFDS is unserviceable.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 21-26-51-865-053-A
Subtask 21-26-51-710-050-A
Subtask 21-26-51-860-052-A Subtask 21-26-51-862-052-A
[Rev.10 from 2021]
2026.04.02 06:11:07 UTC
Operational Test of the Extract and Blower Fans (without the CFDS)
1. Reason for the Job
To do the test after the removal/installation of the blower fan or the extract fan if the CFDS is unserviceable.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 21-26-51-865-053-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-26-51-869-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
B. Make sure that the throttle control levers of the engines 1 and 2 are at idle.
Subtask 21-26-51-861-052-A Subtask 21-26-51-860-051-A D. Aircraft Maintenance Configuration
(1) On the VENTILATION section of the panel 22VU:
(Ref. AMM TASK 31-60-00-860-001).
4. Procedure(1) On the VENTILATION section of the panel 22VU:
- make sure that the BLOWER and EXTRACT pushbutton switches are in the AUTO configuration (pushed with the FAULT and OVRD legends off).
(Ref. AMM TASK 31-60-00-860-001).
Subtask 21-26-51-710-050-A
A. Operational Test of the Extract and Blower Fans
5. Close-up| ACTION | RESULT |
|---|---|
1.On the circuit breaker panel 122VU:
| On the VENTILATION section of the panel 22VU:
|
2.On the circuit breaker panel 122VU:
| On the VENTILATION section of the panel 22VU:
|
Subtask 21-26-51-860-052-A Subtask 21-26-51-862-052-A