W DOC AIRBUS | AMM A320F

Installation of the Extract and Blower Fans


TASK 21-26-51-400-001-A
Installation of the Extract and Blower Fans


ZONE: 128
FIN: 18HQ
FIN: 20HQ
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128
REAR AVIONIC COMPARTMENT
824
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
O-RING
AIPC 21-26-01-08-030
3
O-RING
AIPC 21-26-81-08-050
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 21-26-00-710-001-A
Operational Check of the Avionics Equipment Ventilation-System via MCDU
TASK 21-26-00-710-001-A-01
Operational Check of the Avionics Equipment Ventilation (without the CFDS)
TASK 21-26-51-710-001-A
Operational Test of the Extract and Blower Fans (without the CFDS)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-51-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001)
Subtask 21-26-51-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 18HQ (FANEXTRACT, AVNCS VENT)
49VUAIR COND/AVNCS VENT/CTL6HQD06
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
** ON A/C ALL
FOR FIN: 20HQ (FANBLOWER, AVNCS VENT)
49VUAIR COND/AVNCS VENT/CTL5HQD05
123VUAVNCS VENT/BLOWER/FAN1HQAD10
Subtask 21-26-51-010-051-A
C. Get Access
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
   (2) Make sure that the access door 824 is open.
4. Procedure
Subtask 21-26-51-420-050-B Subtask 21-26-51-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
FOR FIN: 18HQ (FANEXTRACT, AVNCS VENT)
49VUAIR COND/AVNCS VENT/CTL6HQD06
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
** ON A/C ALL
FOR FIN: 20HQ (FANBLOWER, AVNCS VENT)
49VUAIR COND/AVNCS VENT/CTL5HQD05
123VUAVNCS VENT/BLOWER/FAN1HQAD10
Subtask 21-26-51-710-051-A
5. Close-up
Subtask 21-26-51-410-050-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
   (3) Remove the access platform(s).
Subtask 21-26-51-862-051-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:11:07 UTC