Installation of the Skin Heat Exchanger
TASK 21-26-45-400-001-A
Installation of the Skin Heat Exchanger
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 21-26-45-861-051-A Subtask 21-26-45-865-051-A
Subtask 21-26-45-420-050-A
Subtask 21-26-45-410-050-A
[Rev.10 from 2021]
2026.04.02 06:11:07 UTC
Installation of the Skin Heat Exchanger
CAUTION:
USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06AEB2) | Polysulfide Sealant-Low Adhesion Fillet Structure |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-26-00-710-004-A | Operational Check of Ditching Configuration Control Circuit |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-31-41-400-001-A | Installation of the Forward Galley Unit |
| TASK 25-41-41-400-001-A | Installation of Lavatory A |
| TASK 25-41-41-400-001-B | Installation of Lavatory A |
| TASK 25-80-00-400-001-A | Installation of the Insulation Blankets |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 21-26-45-861-051-A Subtask 21-26-45-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-26-45-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
C. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
(2) Make sure that the access door 824 is open.
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
(2) Make sure that the access door 824 is open.
Subtask 21-26-45-420-050-A
A. Installation of the Skin Heat Exchanger
(1) Apply Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) between the contact surfaces of the panels (3) of the skin heat exchanger and the self-locking nut plates (4).
(2) Attach the panels (3) of the skin heat exchanger with washers (2) and screws (1).
Subtask 21-26-45-710-050-A (1) Apply Polysulfide Sealant-Low Adhesion Fillet Structure (Material No.06AEB2) between the contact surfaces of the panels (3) of the skin heat exchanger and the self-locking nut plates (4).
(2) Attach the panels (3) of the skin heat exchanger with washers (2) and screws (1).
B. Test
(1) Do the operational test of the control circuit of the ditching configuration (Ref. AMM TASK 21-26-00-710-004).
(2) On the upper ECAM display unit, make sure that there is no warning related to the avionics ventilation system.
(3) Make sure that there is no leak on the skin heat exchanger.
Subtask 21-26-45-420-051-A (1) Do the operational test of the control circuit of the ditching configuration (Ref. AMM TASK 21-26-00-710-004).
(2) On the upper ECAM display unit, make sure that there is no warning related to the avionics ventilation system.
(3) Make sure that there is no leak on the skin heat exchanger.
C. Installation of the Insulation Blankets, Galley and Lavatory
(1) Install all the insulation blankets between FR12 and FR14 above and below the floor panels (Ref. AMM TASK 25-80-00-400-001).
(2) Install the galley unit at location 1, if removed (Ref. AMM TASK 25-31-41-400-001).
(3) Install the lavatory A, if removed (Ref. AMM TASK 25-41-41-400-001).
5. Close-up(1) Install all the insulation blankets between FR12 and FR14 above and below the floor panels (Ref. AMM TASK 25-80-00-400-001).
(2) Install the galley unit at location 1, if removed (Ref. AMM TASK 25-31-41-400-001).
(3) Install the lavatory A, if removed (Ref. AMM TASK 25-41-41-400-001).
Subtask 21-26-45-410-050-A
A. Close Access
(1) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(2) Remove the access platform(s).
Subtask 21-26-45-865-052-A (1) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(2) Remove the access platform(s).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-26-45-862-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
Skin Heat Exchanger