W DOC AIRBUS | AMM A320F

Removal of the Skin Heat Exchanger


TASK 21-26-45-000-001-A
Removal of the Skin Heat Exchanger


CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 25-31-41-000-001-A
Removal of the Forward Galley Unit
TASK 25-41-41-000-001-A
Removal of Lavatory A
TASK 25-41-41-000-001-B
Removal of Lavatory A
TASK 25-80-00-000-001-A
Removal of the Insulation Blankets
3. Job Set-up
Subtask 21-26-45-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-45-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
Subtask 21-26-45-010-050-A
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
   (2) Open the access door 824.
4. Procedure
Subtask 21-26-45-020-050-A
A. Removal of the Skin Heat Exchanger
   (1) Remove the lavatory A, if install (Ref. AMM TASK 25-41-41-000-001).
   (2) Remove the galley unit at location 1, if install (Ref. AMM TASK 25-31-41-000-001).
   (3) Remove all the insulation blankets between FR12 and FR14 above and below the floor panels (Ref. AMM TASK 25-80-00-000-001).
   (4) Remove the skin heat exchanger:
     (a) Remove the screws (1).
     (b) Remove the washers (2).
     (c) Remove the panels (3) of the skin heat exchanger.