W DOC AIRBUS | AMM A320F

Detailed Inspection of Elbow Drain Hose Connection Area Downstream of Blower Fan


TASK 21-26-42-210-002-A
Detailed Inspection of Elbow Drain Hose Connection Area Downstream of Blower Fan


ZONE: 128
1. Reason for the Job
Refer to the MPD TASK: 212600-07
DETAILED INSPECTION OF ELBOW DRAIN HOSE CONNECTION AREA DOWNSTREAM OF BLOWER FAN
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128
REAR AVIONIC COMPARTMENT
824
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
8
O-RING
AIPC 21-26-01-08-030
8
O-RING
AIPC 21-26-81-08-050
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-42-861-055-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-42-941-054-A
B. Safety Precautions
   (1) On the AIR COND panel 30VU:
     (a) Make sure that the APU BLEED, all ENG BLEED and the PACK 1(2) pushbutton switches are released.
     (b) Put a WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
   (2) On the HP and LP ground connectors, put a warning notice in position to tell persons not to supply the ground air sources.
Subtask 21-26-42-865-055-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-42-010-055-A
D. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
   (2) Open the access door 824.
Subtask 21-26-42-010-056-B
E. Removal of the Elbow
   (1) Remove the clamps (2) from the flexible sleeve (1).
NOTE: Do not discard the clamps (2). You must keep and use them during the installation procedure.
   (2) Remove the clamp (7) from the blower fan (9).
NOTE: Do not discard the clamp (7). You must keep and use it during the installation procedure.
   (3) Hold the elbow (4) and remove the clamp (3).
   (4) Remove the elbow (4) and discard the O-ring (8).
4. Procedure
Subtask 21-26-42-210-059-A
A. Verification of the Drain Holes/Hose
   (1) Remove the clamp (6).
   (2) Examine the drain hole/hose (5) area. Make sure that it is not clogged.
   (3) Install the clamp (6) and tighten it.
5. Close-up
Subtask 21-26-42-410-055-B ** ON A/C NOT FOR ALL Subtask 21-26-42-410-055-D ** ON A/C NOT FOR ALL Subtask 21-26-42-410-054-A Subtask 21-26-42-865-056-A
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-42-862-055-A
D. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:11:05 UTC