W DOC AIRBUS | AMM A320F

Inspection/Check of the Skin Heat Exchanger (Outlet Duct)


TASK 21-26-42-200-002-A
Inspection/Check of the Skin Heat Exchanger (Outlet Duct)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
To examine the condition around the drain holes in the skin heat exchanger.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
AR
SCRAPER - PLASTIC
No specific
AR
SPATULA - NON METALLIC
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.06CMD9)
Silicone Adhesive Sealant-General Purpose One part legacy
(Material No.08BBC1)
Non Aqueous Cleaner-- Naphta based and Alcohol -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
812
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 21-26-42-200-802-A
Inspection/Check of the Honeycomb Grids
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-42-861-053-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-42-865-053-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
Subtask 21-26-42-010-053-A
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 812.
   (2) Open the access door 812.
4. Procedure
Subtask 21-26-42-020-053-B
DELETED
Subtask 21-26-42-210-053-A
B. Make an Inspection of the Internal Structure
   (1) Carefully examine the internal structure of the heat exchanger, specially the area with the drain holes.
   (2) Make sure that this area has no corrosion, cracks, blocked drain holes, unwanted objects. Clean, if necessary.
   (3) With a SCRAPER - PLASTIC, remove the gaskets (23), (25) and all bonding compound from the heat exchanger and the ducts. Discard the gaskets (23) and (25).
   (4) Clean the contact faces of the heat exchanger and the ducts with cleaning agent Non Aqueous Cleaner-- Naphta based and Alcohol - (Material No.08BBC1) .
   (5) Make sure that the contact faces of the heat exchanger have no cracks, dents or other damage.
   (6) Make sure that the honeycomb grids are in the correct position inside the outlet ducts.
   (7) Make sure that the ducts are not clogged.
   (8) If the ducts are clogged, remove contamination and clogging from the honeycomb grids (Ref. AMM TASK 21-26-42-200-802).
   (9) Make sure that the inside of the heat exchanger is clear of tools and other items.
   (10) Remove the PLUG-BLANKING from each disconnected line end.
   (11) Install the gaskets:
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
     (a) With a SPATULA - NON METALLIC, apply a layer of bonding compound Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) to the contact faces of the heat exchanger and the ducts. You must wait 5 minutes before you install the gaskets and the ducts.
Subtask 21-26-42-420-053-B
DELETED
5. Close-up
Subtask 21-26-42-410-052-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 812.
   (3) Remove the access platform(s).
Subtask 21-26-42-865-054-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
Subtask 21-26-42-862-053-A
C. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:47:59 UTC