W DOC AIRBUS | AMM A320F

Removal of the Inlet Duct and the Outlet Duct of the Skin Heat Exchanger


TASK 21-26-42-000-804-A
Removal of the Inlet Duct and the Outlet Duct of the Skin Heat Exchanger


CAUTION: BE VERY CAREFUL WHEN YOU DO WORK ON OR NEAR THE AIR-CONDITIONING DUCTS. THE DUCTS ARE MADE OF THIN MATERIAL AND YOU CAN EASILY BREAK THEM.
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
ZONE: 810
ZONE: 820
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
810
AVIONICS COMPARTMENT DOORS (LEFT)
820
AVIONICS COMPT DOOR (RIGHT)
812, 822
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
3. Job Set-up
Subtask 21-26-42-861-062-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-42-865-071-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-42-010-068-A
C. Get Access
   (1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the applicable access door 812 and/or 822.
   (2) To get access to the inlet duct of the skin heat exchanger:
     (a) Open access door 822 (Ref. AMM TASK 52-41-00-010-002).
   (3) To get access to the outlet duct of the skin heat exchanger:
     (a) Open access door 812 (Ref. AMM TASK 52-41-00-010-002).
4. Procedure
Subtask 21-26-42-020-062-B
A. Removal of the Inlet Duct of the Skin Heat Exchanger
   (1) Carefully move the insulating blankets away from the work area.
   (2) Remove the clamps (9):
     (a) Do not discard the clamps (9). You must keep and use them during the installation procedure.
   (3) Move the flexible sleeve (14) on the duct (12).
   (4) Remove the clamp (5).
   (5) Remove the support clamp (8), which holds the duct (2):
     (a) Attach the isolation valve (7) of the heat exchanger to the adjacent structure to prevent damage to the valve.
   (6) Remove the attachment screws (10) and (4) and the washers (11) and (3).
   (7) Carefully remove the ducts (2) and (12).
   (8) Remove the seals (13) and (1).
   (9) Remove and discard the O-ring (6) from the grooves of the isolation valve (7) of the heat exchanger.
   (10) Remove the flexible sleeve (14) from the duct (12).
   (11) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-26-42-020-063-B
B. Removal of the Outlet Duct of the Skin Heat Exchanger
   (1) Carefully move the insulating blankets away from the work area.
   (2) Remove the clamps (8):
     (a) Do not discard the clamps (8). You must keep and use them during the installation procedure.
   (3) Move the flexible sleeve (9) on the duct (7).
   (4) Remove the clamps (13):
     (a) Do not discard the clamps (13). You must keep and use them during the installation procedure.
   (5) Move flexible sleeve (14) on the duct (10).
   (6) Remove the clamps (16):
     (a) Do not discard the clamps (16). You must keep and use them during the installation procedure.
   (7) Move the flexible sleeve (17) on the duct (2).
   (8) Remove the support clamp (15).
   (9) Remove the duct (2).
   (10) Remove the attachment screws (6) and (11) and the washers (5) and (12).
   (11) Carefully remove the ducts (7) and (10).
   (12) Remove the seals (4) and (3).
   (13) Remove the flexible sleeves (9), (14) and (17) from the ducts (7), (10) and (2).
   (14) Put the PLUG-BLANKING in each disconnected line end.