Removal of the Avionics Equipment Blowing-Duct
TASK 21-26-42-000-802-A
Removal of the Avionics Equipment Blowing-Duct
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-26-42-861-061-A Subtask 21-26-42-941-056-A
Subtask 21-26-42-020-060-A
[Rev.10 from 2021]
2026.04.02 06:11:05 UTC
Removal of the Avionics Equipment Blowing-Duct
CAUTION:
USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 120 | AVIONICS COMPARTMENT |
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 131CW, 131DW, 131GW, 131HW |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 25-54-11-000-001-A | Removal of the Forward Cargo-Compartment Partition FR24A |
| TASK 25-54-12-000-003-A | Removal of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 21-26-42-861-061-A Subtask 21-26-42-941-056-A
B. Safety Precautions
(1) On AIR COND panel 30VU:
(a) Make sure that the APU BLEED, all ENG BLEED and the PACK 1(2) pushbutton switches are released.
(b) Put a WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
(2) On the HP and the LP ground connectors, put a WARNING NOTICE(S) in position to tell persons not to supply the ground air sources.
Subtask 21-26-42-865-062-A (1) On AIR COND panel 30VU:
(a) Make sure that the APU BLEED, all ENG BLEED and the PACK 1(2) pushbutton switches are released.
(b) Put a WARNING NOTICE(S) in position to tell persons not to operate these pushbutton switches.
(2) On the HP and the LP ground connectors, put a WARNING NOTICE(S) in position to tell persons not to supply the ground air sources.
C. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-26-42-010-065-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
D. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the forward cargo-compartment door.
(2) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove forward cargo-compartment partition-panels 131CW and 131DW (Ref. AMM TASK 25-54-11-000-001).
(4) Remove forward cargo-compartment sidewall-panels 131GW and 131HW (Ref. AMM TASK 25-54-12-000-003).
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position below the forward cargo-compartment door.
(2) Open the forward cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Remove forward cargo-compartment partition-panels 131CW and 131DW (Ref. AMM TASK 25-54-11-000-001).
(4) Remove forward cargo-compartment sidewall-panels 131GW and 131HW (Ref. AMM TASK 25-54-12-000-003).
Subtask 21-26-42-020-060-A
A. Removal of the Avionics Equipment Blowing-Duct
(1) Remove the clamps (3), (5) and (7).
(2) Move the flexible sleeves (6) to disengage the duct (2).
(3) Remove the duct (2).
(4) Remove the flexible sleeves (6) from the ducts (1) and (4).
(5) Put the PLUG-BLANKING in each disconnected line end.
(1) Remove the clamps (3), (5) and (7).
(2) Move the flexible sleeves (6) to disengage the duct (2).
(3) Remove the duct (2).
(4) Remove the flexible sleeves (6) from the ducts (1) and (4).
(5) Put the PLUG-BLANKING in each disconnected line end.
Avionics Equipment Blowing-Duct