W DOC AIRBUS | AMM A320F

Removal of the Avionics Equipment Blowing and Extraction Ducts


TASK 21-26-42-000-002-A
Removal of the Avionics Equipment Blowing and Extraction Ducts


1. Reason for the Job
To do the maintenance of the strake on the right side of the fuselage.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
PLUG - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128EG, 824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-41-00-010-002-A
Open the Avionics Compartment Doors for Access
TASK 53-12-13-000-001-A
Removal of the avionics compartment floor panels
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-42-861-058-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-42-865-059-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-42-010-060-A
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
   (2) Open the access door 824 (Ref. AMM TASK 52-41-00-010-002).
   (3) Remove access panel 128EG (Ref. AMM TASK 53-12-13-000-001).
4. Procedure
Subtask 21-26-42-020-056-A
A. Removal of the Avionics Equipment Blowing-Duct
   (1) Remove the clamp (17) and disconnect the drain hose (16) from the duct (14).
   (2) Remove the clamps (18) and (22).
   (3) Hold the duct (14) and remove the clamp (15).
   (4) Remove the duct (14) and discard the O-ring (21).
   (5) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-26-42-020-057-A
B. Removal of the Avionics Equipment Extraction-Ducts
   (1) Remove the clamps (6) and the sleeve (5).
   (2) Remove the clamp (3).
   (3) Remove the clamps (7) and the flexible sleeve (8).
   (4) Remove the duct (4) and discard the O-ring (2).
   (5) Remove the clamps (12) and the flexible sleeve (13).
   (6) Remove the clamp (11).
   (7) Remove the duct (9) and discard the O-ring (10).
   (8) Put the PLUG-BLANKING in each disconnected line end.
[Rev.10 from 2021] 2026.04.02 06:11:04 UTC