Removal of the Avionics Equipment Blowing and Extraction Ducts
TASK 21-26-42-000-002-A
Removal of the Avionics Equipment Blowing and Extraction Ducts
1. Reason for the Job
To do the maintenance of the strake on the right side of the fuselage.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-26-42-020-056-A
[Rev.10 from 2021]
2026.04.02 06:47:59 UTC
Removal of the Avionics Equipment Blowing and Extraction Ducts
1. Reason for the Job
To do the maintenance of the strake on the right side of the fuselage.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128EG, 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 53-12-13-000-001-A | Removal of the avionics compartment floor panels |
CAUTION:
USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-42-861-058-A Subtask 21-26-42-865-059-A B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-26-42-010-060-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
C. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
(2) Open the access door 824 (Ref. AMM TASK 52-41-00-010-002).
(3) Remove access panel 128EG (Ref. AMM TASK 53-12-13-000-001).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
(2) Open the access door 824 (Ref. AMM TASK 52-41-00-010-002).
(3) Remove access panel 128EG (Ref. AMM TASK 53-12-13-000-001).
Subtask 21-26-42-020-056-A
A. Removal of the Avionics Equipment Blowing-Duct
(1) Remove the clamp (17) and disconnect the drain hose (16) from the duct (14).
(2) Remove the clamps (18) and (22).
(3) Hold the duct (14) and remove the clamp (15).
(4) Remove the duct (14) and discard the O-ring (21).
(5) Put the PLUG-BLANKING in each disconnected line end.
Subtask 21-26-42-020-057-A (1) Remove the clamp (17) and disconnect the drain hose (16) from the duct (14).
(2) Remove the clamps (18) and (22).
(3) Hold the duct (14) and remove the clamp (15).
(4) Remove the duct (14) and discard the O-ring (21).
(5) Put the PLUG-BLANKING in each disconnected line end.
B. Removal of the Avionics Equipment Extraction-Ducts
(1) Remove the clamps (6) and the sleeve (5).
(2) Remove the clamp (3).
(3) Remove the clamps (7) and the flexible sleeve (8).
(4) Remove the duct (4) and discard the O-ring (2).
(5) Remove the clamps (12) and the flexible sleeve (13).
(6) Remove the clamp (11).
(7) Remove the duct (9) and discard the O-ring (10).
(8) Put the PLUG-BLANKING in each disconnected line end.
(1) Remove the clamps (6) and the sleeve (5).
(2) Remove the clamp (3).
(3) Remove the clamps (7) and the flexible sleeve (8).
(4) Remove the duct (4) and discard the O-ring (2).
(5) Remove the clamps (12) and the flexible sleeve (13).
(6) Remove the clamp (11).
(7) Remove the duct (9) and discard the O-ring (10).
(8) Put the PLUG-BLANKING in each disconnected line end.