Installation of the Check Valve


TASK 21-26-41-400-001-A
Installation of the Check Valve


ZONE: 128
FIN: 2140HM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128
REAR AVIONIC COMPARTMENT
824
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
12
O-RING
AIPC 21-26-01-08-030
12
O-RING
AIPC 21-26-81-08-050
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 52-41-00-410-002-A
Close the Avionics Compartment Doors after Access
3. Job Set-up
CAUTION: USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-41-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-41-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-41-010-051-A
C. Get Access
   (1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
   (2) Make sure that the access door 824 is open.
4. Procedure
Subtask 21-26-41-420-052-G
A. Installation of the Check Valve
   (1) Remove the PLUG-BLANKING from each disconnected line end.
   (2) Install the flexible sleeve (3).
   (3) Put the check valve (4) in position.
NOTE: The arrow that indicates the air flow points to the left.
   (4) Install the washers (5), the screws (6) and tighten.
   (5) Install the clamps (2) and tighten.
NOTE: Use the clamps (2) kept during the removal procedure.
   (6) Install the flexible sleeve (7).
   (7) Install the new AIPC 21-26-01-08-030 O-RING (12) or AIPC 21-26-81-08-050 O-RING (12) in the fan (13) groove.
   (8) Put the duct (10) in position.
   (9) Install the clamp (9). Do not fully tighten at this time.
   (10) Install the clamps (8) and tighten.
NOTE: Use the clamps (8) kept during the removal procedure.
   (11) Install the drain hose (15) to the duct (10).
   (12) Install the clamp (14) and tighten it.
   (13) Make sure that the O-ring (12) is correctly installed in the fan (13) groove.
   (14) Install the clamp (11) and torque them to the value given on the clamp.
   (15) Tighten the clamp (9).
5. Close-up
Subtask 21-26-41-410-050-A
Subtask 21-26-41-865-052-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAE02
** ON A/C ALL
123VUAVNCS VENT/BLOWER/FAN1HQAD10
** ON A/C NOT FOR ALL
123VUAVNCS VENT/EXTC/FAN2HQAC04
Subtask 21-26-41-862-051-A
C. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).