Installation of the Check Valve
TASK 21-26-41-400-001-A
Installation of the Check Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 21-26-41-420-052-G
Subtask 21-26-41-410-050-A
[Rev.10 from 2021]
2026.04.02 06:11:03 UTC
Installation of the Check Valve
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 128 | REAR AVIONIC COMPARTMENT |
| 824 |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 12 | O-RING | AIPC 21-26-01-08-030 |
| 12 | O-RING | AIPC 21-26-81-08-050 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
CAUTION:
USE ONLY THE GROUND SERVICE NETWORK TO SUPPLY ELECTRICITY BECAUSE THE AVIONICS VENTILATION SYSTEM IS NOT SERVICEABLE. IF YOU ENERGIZE THE AIRCRAFT ELECTRICAL CIRCUITS WITHOUT THE VENTILATION SYSTEM YOU WILL CAUSE DAMAGE TO ELECTRICAL EQUIPMENT.
Subtask 21-26-41-860-050-A A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-41-865-051-A (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 21-26-41-010-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
C. Get Access
(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
(2) Make sure that the access door 824 is open.
4. Procedure(1) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position at the access door 824.
(2) Make sure that the access door 824 is open.
Subtask 21-26-41-420-052-G
A. Installation of the Check Valve
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Install the flexible sleeve (3).
(3) Put the check valve (4) in position.
(5) Install the clamps (2) and tighten.
(7) Install the new AIPC 21-26-01-08-030 O-RING (12) or AIPC 21-26-81-08-050 O-RING (12) in the fan (13) groove.
(8) Put the duct (10) in position.
(9) Install the clamp (9). Do not fully tighten at this time.
(10) Install the clamps (8) and tighten.
(12) Install the clamp (14) and tighten it.
(13) Make sure that the O-ring (12) is correctly installed in the fan (13) groove.
(14) Install the clamp (11) and torque them to the value given on the clamp.
(15) Tighten the clamp (9).
5. Close-up(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Install the flexible sleeve (3).
(3) Put the check valve (4) in position.
NOTE: The arrow that indicates the air flow points to the left.
(4) Install the washers (5), the screws (6) and tighten. (5) Install the clamps (2) and tighten.
NOTE: Use the clamps (2) kept during the removal procedure.
(6) Install the flexible sleeve (7). (7) Install the new AIPC 21-26-01-08-030 O-RING (12) or AIPC 21-26-81-08-050 O-RING (12) in the fan (13) groove.
(8) Put the duct (10) in position.
(9) Install the clamp (9). Do not fully tighten at this time.
(10) Install the clamps (8) and tighten.
NOTE: Use the clamps (8) kept during the removal procedure.
(11) Install the drain hose (15) to the duct (10). (12) Install the clamp (14) and tighten it.
(13) Make sure that the O-ring (12) is correctly installed in the fan (13) groove.
(14) Install the clamp (11) and torque them to the value given on the clamp.
(15) Tighten the clamp (9).
Subtask 21-26-41-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
Subtask 21-26-41-865-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-26-41-862-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 6HQ | D06 |
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
| 122VU | AIR COND/AVNCS/VENT/MONG | 3HQ | Y17 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AE02 |
| ** ON A/C ALL | |||
| 123VU | AVNCS VENT/BLOWER/FAN | 1HQ | AD10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AVNCS VENT/EXTC/FAN | 2HQ | AC04 |
Check Valve