W DOC AIRBUS | AMM A320F

Removal of the Avionics Ventilation Duct Temperature Sensors


TASK 21-26-12-000-001-B
Removal of the Avionics Ventilation Duct Temperature Sensors


FIN: 26HQ ** ON A/C NOT FOR ALL
FIN: 32HQ ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
824
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 21-26-12-861-052-A ** ON A/C NOT FOR ALL
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-26-12-865-053-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR COND/AVNCS VENT/CTL6HQD06
49VUAIR COND/AVNCS VENT/CTL5HQD05
122VUAIR COND/AVNCS/VENT/MONG3HQY17
123VUAVNCS VENT/BLOWER/FAN1HQAD10
123VUAVNCS VENT/EXTC/FAN2HQAE02
Subtask 21-26-12-010-052-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
   (2) Open the access door 824.
4. Procedure
Subtask 21-26-12-020-052-A ** ON A/C NOT FOR ALL
A. Removal of the Duct Temperature Sensors
F Duct Temperature Sensors ** ON A/C NOT FOR ALL
   (1) Disconnect the electrical connectors (1).
   (2) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
   (3) Cut and discard the lockwire.
   (4) Remove the sensors (2) and discard the O-rings (3).
[Rev.9 from 2019] 2026.04.02 06:11:02 UTC