Reactivation of the Conditioned-Air Inlet Valve and of the Blower Fan
TASK 21-26-00-440-013-A
Reactivation of the Conditioned-Air Inlet Valve and of the Blower Fan
1. Reason for the Job
MMEL 12-34-56C
AVIONICS BLOWER FAN (FUNC-CODE:21-26-01 ITEM-LIST-NBR:01)
MMEL 21-26-01C
AVIONICS BLOWER FAN
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-26-00-861-089-A Subtask 21-26-00-865-102-A
Subtask 21-26-00-440-065-A
Subtask 21-26-00-410-090-A
[Rev.10 from 2021]
2026.04.02 06:10:59 UTC
Reactivation of the Conditioned-Air Inlet Valve and of the Blower Fan
1. Reason for the Job
MMEL 12-34-56C
AVIONICS BLOWER FAN (FUNC-CODE:21-26-01 ITEM-LIST-NBR:01)
MMEL 21-26-01C
AVIONICS BLOWER FAN
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 21-26-00-861-089-A Subtask 21-26-00-865-102-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-26-00-010-093-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
C. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
(2) Open the access door 824 (Ref. AMM TASK 52-41-00-010-002).
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position at the access door 824.
(2) Open the access door 824 (Ref. AMM TASK 52-41-00-010-002).
Subtask 21-26-00-440-065-A
A. Reactivation of the Conditioned-Air Inlet Valve (21HQ) and of the Blower Fan
(1) On the conditioned-air inlet valve 21HQ:
(a) Get the electrical cable and its connector.
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector 21HQ-A to the valve 21HQ.
(e) Fully close the valve 21HQ with the manual mechanism (the position indicator of the valve goes to C).
(2) On the VENTILATION section of the overhead panel 22VU:
Subtask 21-26-00-865-103-A (1) On the conditioned-air inlet valve 21HQ:
(a) Get the electrical cable and its connector.
(b) Remove the CAP-BLANKING from each electrical connector and receptacle.
(c) Make sure that all the electrical connections are clean and in the correct condition.
(d) Connect the electrical connector 21HQ-A to the valve 21HQ.
(e) Fully close the valve 21HQ with the manual mechanism (the position indicator of the valve goes to C).
(2) On the VENTILATION section of the overhead panel 22VU:
- Push the BLOWER pushbutton switch (the OVRD legend goes off.)
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | AIR COND/AVNCS VENT/CTL | 5HQ | D05 |
Subtask 21-26-00-410-090-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 21-26-00-862-092-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the access door 824 (Ref. AMM TASK 52-41-00-410-002).
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).