Functional Test of the Galley/Lavatory Air Extraction Duct
TASK 21-23-00-720-001-A
Functional Test of the Galley/Lavatory Air Extraction Duct
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 21-23-00-861-050-A Subtask 21-23-00-865-050-A
Subtask 21-23-00-720-050-E ** ON A/C NOT FOR ALL
Subtask 21-23-00-410-052-A
[Rev.10 from 2021]
2026.04.02 06:47:42 UTC
Functional Test of the Galley/Lavatory Air Extraction Duct
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
MAKE SURE THAT THE FWD AVIONICS ACCESS DOOR 811 IS OPEN WITH A WARNING PLACARD ATTACHED TO IT.
THE WARNING NOTICE MUST TELL PERSONS NOT TO CLOSE THE DOOR. THIS PREVENTS ACCIDENTAL PRESSURIZATION OF THE AIRCRAFT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | HOSE LENGTH 2 M (6.6 FT) |
| No specific | Torque wrench: range to between 0.07 and 0.034 m.daN (6.19 and 3.01 lbf.in ) ![]() | |
| EMA84-10-5-1 | 1 | DIGITAL MANOMETER - 0 TO 10 KPA (0 TO 100 MBAR) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 222BC, 251HC |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 2 | LOCK WASHER | AIPC 21-23-04-10-140 |
| 2 | WASHER-LOCK | AIPC 21-23-84-04-070 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-13-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-13-41-400-001-A | Installation of the Ceiling Panels |
Subtask 21-23-00-861-050-A Subtask 21-23-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 21-23-00-010-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
C. Remove the ceiling panels 222BC between FR 16-17, and 251HC between FR 61-63 (Ref. AMM TASK 25-13-41-000-001).
4. ProcedureSubtask 21-23-00-720-050-E ** ON A/C NOT FOR ALL
A. Functional Test of the Air Extraction Duct
Subtask 21-23-00-720-050-F ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.Remove the blanking cap (3) from the forward pressure measurement point 1025.
| On the manometer:
|
2.Disconnect the manometer and the silicone tubing from the forward pressure measurement point 1025.
| |
3.Remove the screw (1) and the lock washer (2) from the aft pressure measurement point 1026.
| On the manometer:
|
4.Disconnect the manometer and the silicone tubing from the aft pressure measurement point 1026.
| |
A. Functional Test of the Air Extraction Duct
Subtask 21-23-00-720-050-G ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
1.Remove the blanking cap (3) from the forward pressure measurement point 1025.
| On the manometer:
|
2.Disconnect the manometer and the silicone tubing from the forward pressure measurement point 1025.
| |
3.Remove the screw (1) and the lock washer (2) from the aft pressure measurement point 1026.
| On the manometer:
|
4.Disconnect the manometer and the silicone tubing from the aft pressure measurement point 1026.
| |
A. Functional Test of the Air Extraction Duct
5. Close-up| ACTION | RESULT |
|---|---|
1.Remove the blanking cap (3) from the forward pressure measurement point 1025.
| On the manometer:
|
2.Disconnect the manometer and the silicone tubing from the forward pressure measurement point 1025.
| |
3.Remove the screw (1) and the lock washer (2) from the aft pressure measurement point 1026.
| On the manometer:
|
4.Disconnect the manometer and the silicone tubing from the aft pressure measurement point 1026.
| |
Subtask 21-23-00-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels 222BC and 251HC (Ref. AMM TASK 25-13-41-400-001).
(3) Remove the WARNING NOTICE(S).
Subtask 21-23-00-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the ceiling panels 222BC and 251HC (Ref. AMM TASK 25-13-41-400-001).
(3) Remove the WARNING NOTICE(S).

Pressure Measurement Point - Locations