W DOC AIRBUS | AMM A320F

Reactivation of the Lavatory/Galley Extraction Fan


TASK 21-23-00-440-001-A
Reactivation of the Lavatory/Galley Extraction Fan


FIN: 1HU
1. Reason for the Job
MMEL 21-23-01A
LAVATORY AND GALLEY EXTRACTION FAN (FAA ONLY)
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 21-61-00-710-001-A
Operational Test of the Pack Temperature-Control System
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 21-23-00-861-054-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
4. Procedure
Subtask 21-23-00-865-053-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VUAIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL5HUU21
122VUAIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY6HUU19
Subtask 21-23-00-710-051-A
B. Do the operational test of the pack temperature-control system (Ref. AMM TASK 21-61-00-710-001)
Subtask 21-23-00-440-050-A
C. Placard
   (1) Remove the deactivation placard in the cockpit.
5. Close-up
Subtask 21-23-00-862-054-A
A. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:10:56 UTC