W DOC AIRBUS | AMM A320F

Installation of the Third (Fourth) Occupant Individual Air-Outlet


TASK 21-21-44-400-002-A
Installation of the Third (Fourth) Occupant Individual Air-Outlet


ZONE: 211
FIN: 4502HM
FIN: 4503HM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
211
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 21-21-44-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
Subtask 21-21-44-865-054-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VUAIR COND/RECIRC FAN/L/CTL2HGX20
122VUAIR COND/RECIRC FAN/L/SPLY1HGX18
4. Procedure
Subtask 21-21-44-420-052-B
A. Installation of the Third Occupant Individual Air-Outlet
   (1) Put the air outlet (2) in position on the duct (1).
   (2) Put the duct (1) with the air outlet (2) in position on the plate (4).
   (3) Install the 4 screws (8) and tighten.
   (4) Put the plate (4) in position on the frame (3). Tighten the 4 quarter-turn fasteners (5).
   (5) Put the lining panel (6) in position. Install the 4 screws (7) and tighten.
5. Close-up
Subtask 21-21-44-865-055-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VUAIR COND/RECIRC FAN/L/CTL2HGX20
122VUAIR COND/RECIRC FAN/L/SPLY1HGX18
Subtask 21-21-44-862-051-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.04.02 06:10:55 UTC