Removal of the Recirculation Check Valve
TASK 21-21-42-000-001-A
Removal of the Recirculation Check Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-21-42-861-050-A Subtask 21-21-42-865-050-A
Subtask 21-21-42-020-050-A
[Rev.10 from 2021]
2026.04.02 06:10:54 UTC
Removal of the Recirculation Check Valve
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
NOTE: The procedure is the same for the recirculation check valves 4020HM (4021HM).
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| FOR [4020HM] (RECIRC CHECK VALVE 1) | |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
| FOR [4021HM] (RECIRC CHECK VALVE 2) | |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 21-21-42-861-050-A Subtask 21-21-42-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-21-42-941-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| FOR FIN: 4020HM (RECIRC CHECK VALVE 1) | |||
| 122VU | AIR COND/RECIRC FAN/L/CTL | 2HG | X20 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
| FOR FIN: 4021HM (RECIRC CHECK VALVE 2) | |||
| 122VU | AIR COND/RECIRC FAN/R/CTL | 11HG | W20 |
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
C. Safety Precautions
(1) On AIR COND panel 30VU:
(a) Make sure that:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(b) Put a WARNING NOTICE(S) in position to tell the persons not to operate these pushbutton switches.
(2) On the High Pressure (HP) ground connector put the WARNING NOTICE(S) in position to tell persons not to supply ground air.
Subtask 21-21-42-010-050-A (1) On AIR COND panel 30VU:
(a) Make sure that:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(b) Put a WARNING NOTICE(S) in position to tell the persons not to operate these pushbutton switches.
(2) On the High Pressure (HP) ground connector put the WARNING NOTICE(S) in position to tell persons not to supply ground air.
D. Get Access
(1) Open FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at FWD cargo-compartment door 825.
(3) Remove the access panel(s) from partition FR34 (Ref. AMM TASK 25-54-12-000-001):
(a) FOR [4020HM] (RECIRC CHECK VALVE 1)
(b) FOR [4021HM] (RECIRC CHECK VALVE 2)
4. Procedure(1) Open FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(2) Put an ACCESS PLATFORM 2M (6 FT) in position at FWD cargo-compartment door 825.
(3) Remove the access panel(s) from partition FR34 (Ref. AMM TASK 25-54-12-000-001):
(a) FOR [4020HM] (RECIRC CHECK VALVE 1)
(b) FOR [4021HM] (RECIRC CHECK VALVE 2)
Subtask 21-21-42-020-050-A
A. Removal of the Recirculation Check Valve
(1) Remove the clamp (4) and disconnect the sleeve (5).
(2) Remove the clamp (1).
(3) Carefully remove the flange (3) together with the recirculation check valve (2).
(4) Remove the recirculation check valve (2) from the flange (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
(1) Remove the clamp (4) and disconnect the sleeve (5).
(2) Remove the clamp (1).
(3) Carefully remove the flange (3) together with the recirculation check valve (2).
(4) Remove the recirculation check valve (2) from the flange (3).
(5) Put the PLUG-BLANKING in each disconnected line end.
Recirculation Check Valve 4020HM (4021HM).