Decontamination of the Environmental Control System (ECS) when the Temperature is below 24 deg.C (Engine/s)
TASK 21-00-00-615-003-A
Decontamination of the Environmental Control System (ECS) when the Temperature is below 24 deg.C (Engine/s)
To decontaminate the ECS if oil has gone into it from one or both engines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 21-00-00-850-050-A ** ON A/C NOT FOR ALL
Subtask 21-00-00-110-050-B ** ON A/C NOT FOR ALL
(a) Make sure that:
Subtask 21-00-00-869-063-A
(2) On the AIR COND panel 30VU:
(a) Make sure that:
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(3) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
(7) On the ECAM control panel push the COND pushbutton switch.
(8) Blow warm air onto the zone temperature sensor 21HK (behind the grill in the cockpit ceiling) with a warm air blower.
(11) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(14) Stop the warm air blower.
(15) On the ECAM control panel push the COND pushbutton switch.
(16) On the ECAM lower DU make sure that the CKPT, the FWD cabin and the AFT cabin temperatures decrease to, or are less than 24 deg. C.
(17) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(18) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
Subtask 21-00-00-160-057-G ** ON A/C NOT FOR ALL
(2) On the AIR COND panel 30VU:
(a) Make sure that:
(a) On the CARGO HEAT panel 22VU and the AIR COND panel 30VU push the HOT AIR pushbutton switches to the off position (the OFF legends come on).
(b) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(4) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
(8) On the ECAM control panel push the COND pushbutton switch.
(9) Blow warm air onto the zone temperature sensor 21HK (behind the grill in the cockpit ceiling) with a warm air blower.
(12) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(15) Stop the warm air blower.
(16) On the ECAM control panel push the COND pushbutton switch.
(17) On the ECAM lower DU make sure that the CKPT, the FWD cabin and the AFT cabin temperatures decrease to, or are less than 24 deg. C.
(18) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(19) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
Subtask 21-00-00-860-071-B ** ON A/C NOT FOR ALL Subtask 21-00-00-865-072-A
(2) On the AIR COND panel 30VU:
(a) Make sure that:
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(3) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
(d) On the ECAM lower DU make sure that the duct inlet temperature does not go above 70 deg. C (max.).
Subtask 21-00-00-160-058-I ** ON A/C NOT FOR ALL
(2) On the CARGO HEAT panel 22VU push the HOT AIR pushbutton switch to the off position. (the OFF legend comes on).
(3) On the AIR COND panel 30VU:
(a) Make sure that:
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(4) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
(a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
(d) On the ECAM lower DU make sure that the duct inlet temperature does not go above 70 deg. C (max.).
Subtask 21-00-00-860-073-B ** ON A/C NOT FOR ALL
Subtask 21-00-00-410-052-A
[Rev.9 from 2019]
2026.04.02 06:10:52 UTC
Decontamination of the Environmental Control System (ECS) when the Temperature is below 24 deg.C (Engine/s)
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobTo decontaminate the ECS if oil has gone into it from one or both engines.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | CAP - BLANKING |
| No specific | AR | COVER - PROTECTION |
| No specific | 1 | GUN - HOT AIR - MAX OPERATING 55 DEG.C (131 DEG.F) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.08ABC1) | Aqueous Cleaner-Aircraft Exterior Pressure Spraying - |
| (Material No.08BBB1) | Non Aqueous Cleaner-- Petroleum Based - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 191BB, 191KB, 192FB, 192KB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 05-24-50-210-801-A | GENERAL VISUAL INSPECTION OF CORE COMPARTMENT (EWIS) |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 12-33-21-618-001-A | Pre-conditioning through the LP Ground Connection |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 21-00-00-100-001-A | Cleaning of Special Components in the Environmental Control System (ECS) |
| TASK 21-00-00-615-004-A | Decontamination of the Environmental Control System (ECS) when the Temperature is above 24 deg.C (Engine/s) |
| TASK 21-21-00-710-001-A | Operational Test of the Cabin Recirculation Fans |
| TASK 21-21-41-000-001-A | Removal of the Recirculation Filter |
| TASK 21-21-41-400-001-A | Installation of the Recirculation Filter |
| TASK 21-21-51-000-001-A | Removal of the Cabin Recirculation Fans |
| TASK 21-21-51-400-001-A | Installation of the Cabin Recirculation Fans |
| TASK 21-43-00-710-003-A | Operational Test of the AFT Cargo Compartment Heating System |
| TASK 21-43-51-000-001-A | Removal of the Aft Cargo-Trim Air-Valve |
| TASK 21-43-51-400-001-A | Installation of the Aft Cargo-Trim Air-Valve |
| TASK 21-43-52-000-001-A | Removal of the Pressure Regulating Valve - Aft Cargo-Compartment Heating |
| TASK 21-43-52-400-001-A | Installation of the Pressure Regulating Valve - Aft Cargo-Compartment Heating |
| TASK 21-51-41-000-001-A | Removal of the Ozone Filter |
| TASK 21-51-41-400-001-A | Installation of the Ozone Filter |
| TASK 21-51-51-000-001-A | Removal of the Pack Flow-Control Valve/ Pack Flow-Control Unit |
| TASK 21-51-51-400-001-A | Installation of the Pack Flow-Control Valve/ Pack Flow-Control Unit |
| TASK 21-52-16-000-001-A | Removal of the Water Extractor |
| TASK 21-52-16-400-001-A | Installation of the Water Extractor |
| TASK 21-52-21-000-001-A | Removal of the Air Cycle Machine |
| TASK 21-52-21-400-001-A | Installation of the Air Cycle Machine |
| TASK 21-52-32-400-001-A | Installation of the Condenser |
| TASK 21-52-42-000-001-A | Removal of the Water Injector |
| TASK 21-52-42-400-001-A | Installation of the Water Injector |
| TASK 21-52-43-400-001-A | Installation of the Pack Downstream Check-Valves |
| TASK 21-63-00-710-004-A | Operational Test of the Cockpit and Cabin Temperature Control with CFDS/MCDU |
| TASK 21-63-52-000-001-A | Removal of the Pressure Regulating Valve |
| TASK 21-63-52-400-001-A | Installation of the Pressure Regulating Valve |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 26-12-17-000-803-A | Removal of the Aft Fire/Overheat Detector |
| TASK 26-12-17-400-803-A | Installation of the Aft Fire/Overheat Detector |
| TASK 26-12-61-000-802-A | Removal of the Loop-A Fire Harness and Electrical Rail Assembly |
| TASK 26-12-61-400-802-A | Installation of the Loop-A Fire Harness and Electrical Rail Assembly |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 36-11-00-710-802-A | Operational Test of the Bleed Air System |
| TASK 36-11-49-000-040-A | Removal of the Pylon Interface Duct |
| TASK 36-11-49-000-042-A | Removal of the Pylon Interface Duct |
| TASK 36-11-49-000-822-A | Removal of the Environmental Control System (ECS) Ducts |
| TASK 36-11-49-000-823-A | Removal of the Environmental Control System (ECS) Sense Lines |
| TASK 36-11-49-400-040-A | Installation of the Pylon Interface Duct |
| TASK 36-11-49-400-042-A | Installation of the Pylon Interface Duct |
| TASK 36-11-49-400-822-A | Installation of the Environmental Control System (ECS) Ducts |
| TASK 36-11-49-400-823-A | Installation of the Environmental Control System (ECS) Sense Lines |
| TASK 36-11-49-400-824-A | Installation of the Environmental Control System (ECS) Interface Duct |
| TASK 36-11-52-000-802-A | Removal of the Bleed Pressure-Regulator Valve |
| TASK 36-11-52-400-802-A | Installation of the Bleed Pressure-Regulator Valve |
| TASK 36-11-53-000-802-A | Removal of the Overpressure Valve |
| TASK 36-11-53-400-802-A | Installation of the Overpressure Valve |
| TASK 36-12-41-000-001-A | Removal of a Bleed-Air Duct |
| TASK 36-12-41-400-001-A | Installation of a Bleed-Air Duct |
| TASK 49-00-00-860-005-A | APU Start by External Power |
| TASK 49-00-00-860-005-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-006-A | APU Shutdown by External Power |
| TASK 49-00-00-860-006-A-01 | APU Shutdown by Batteries |
| TASK 49-00-00-860-008-A | APU Start by External Power |
| TASK 49-00-00-860-008-A-01 | APU Start by Batteries |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
| TASK 71-00-00-710-003-A | Engine Automatic Start |
| TASK 71-00-00-710-003-B | Engine Automatic Start |
| TASK 71-00-00-710-028-A | Engine Shutdown |
| TASK 71-00-00-710-028-B | Engine Shutdown |
| TASK 75-24-49-000-803-A | Removal of the Component Cooling Lines |
| TASK 75-24-49-400-803-A | Installation of the Component Cooling Lines |
| TASK 78-32-00-210-821-A | General Visual Inspection (GVI) of the Thrust Reverser Thermal Insulation Blankets |
Subtask 21-00-00-850-050-A ** ON A/C NOT FOR ALL
A. AFR Required CAUTION
Subtask 21-00-00-941-052-A B. Necessary Special Tools
(1) CAP - BLANKING
Manufactured with reference to
(2) GUN - HOT AIR - MAX OPERATING 55 DEG.C (131 DEG.F)
Subtask 21-00-00-861-052-A Subtask 21-00-00-860-067-A (1) CAP - BLANKING
Manufactured with reference to
(2) GUN - HOT AIR - MAX OPERATING 55 DEG.C (131 DEG.F)
NOTE: A commercial hair drier could be used as the warm air blower.
D. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel push the COND pushbutton switch.
(3) Make sure that the CKPT, the FWD cabin and the AFT cabin temperatures shown on the ECAM lower display unit (DU) are below 24 deg. C.
(4) If one or more of the temperatures is more than 24 deg. C you must:
(a) Lower the temperature (Ref. AMM TASK 12-33-21-618-001) or,
(b) Do the alternative ECS decontamination procedure (Ref. AMM TASK 21-00-00-615-004).
Subtask 21-00-00-865-070-A (1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) On the ECAM control panel push the COND pushbutton switch.
(3) Make sure that the CKPT, the FWD cabin and the AFT cabin temperatures shown on the ECAM lower display unit (DU) are below 24 deg. C.
(4) If one or more of the temperatures is more than 24 deg. C you must:
(a) Lower the temperature (Ref. AMM TASK 12-33-21-618-001) or,
(b) Do the alternative ECS decontamination procedure (Ref. AMM TASK 21-00-00-615-004).
E. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-00-00-010-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS2 | 4HK | V20 |
| 122VU | AIR COND/ZONE TEMP CTL/28VDC/SYS1 | 3HK | V19 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS2 | 2HK | V18 |
| 122VU | AIR COND/ZONE TEMP CTL/115VAC/SYS1 | 1HK | V17 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
| ** ON A/C ALL | |||
| 122VU | AIR COND/RECIRC FAN/R/CTL | 11HG | W20 |
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
| 122VU | AIR COND/RECIRC FAN/L/CTL | 2HG | X20 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
F. Get access
(1) Remove the access panels 191BB, 192FB, 191KB and 192KB (Ref. AMM TASK 53-35-13-000-002).
4. Procedure(1) Remove the access panels 191BB, 192FB, 191KB and 192KB (Ref. AMM TASK 53-35-13-000-002).
Subtask 21-00-00-110-050-B ** ON A/C NOT FOR ALL
A. Cleaning of the Bleed Air Duct
(2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts and the ozone filters.
(4) Cleaning of the Bleed Air Ducts and the Ozone Filters
(5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-040).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
(9) Remove the WARNING NOTICE(S).
Subtask 21-00-00-110-050-F ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Put a warning notice in position in the cockpit to tell persons not to start the APU or the engines. (2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts and the ozone filters.
(4) Cleaning of the Bleed Air Ducts and the Ozone Filters
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Clean contaminated bleed air ducts and areas of the ozone filters that you can get access to with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) . (5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-040).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
NOTE: The open ends of the bleed-air joint ducts (B) must face in such a direction that the hot bleed air can vent freely to atmosphere.
(8) Put protective covers on the open ends of the bleed-pressure regulator valve. (9) Remove the WARNING NOTICE(S).
A. Cleaning of the Bleed Air Duct
(2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts and the ozone filters.
(4) Cleaning of the Bleed Air Ducts and the Ozone Filters
(5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
(9) Remove the WARNING NOTICE(S).
Subtask 21-00-00-110-050-G ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Put a warning notice in position in the cockpit to tell persons not to start the APU or the engines. (2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts and the ozone filters.
(4) Cleaning of the Bleed Air Ducts and the Ozone Filters
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Clean contaminated bleed air ducts and areas of the ozone filters that you can get access to with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) . (5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
NOTE: The open ends of the bleed-air joint ducts (B) must face in such a direction that the hot bleed air can vent freely to atmosphere.
(8) Put protective covers on the open ends of the bleed-pressure regulator valve. (9) Remove the WARNING NOTICE(S).
A. Cleaning of the Bleed Air Duct
(2) Remove the section of bleed air duct forward of the flow control units 23HB and 24HB (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts or in the connector grooves of the 'v'-flanges.
(4) Cleaning of the Bleed Air Ducts
(5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
(9) Remove the WARNING NOTICE(S).
Subtask 21-00-00-110-050-I ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Put a warning notice in position in the cockpit to tell persons not to start the APU or the engines. (2) Remove the section of bleed air duct forward of the flow control units 23HB and 24HB (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts or in the connector grooves of the 'v'-flanges.
(4) Cleaning of the Bleed Air Ducts
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Clean contaminated bleed air ducts with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) . (5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
NOTE: The open ends of the bleed-air joint ducts (B) must face in such a direction that the hot bleed air can vent freely to atmosphere.
(8) Put protective covers on the open ends of the bleed-pressure regulator valve. (9) Remove the WARNING NOTICE(S).
A. Cleaning of the Bleed Air Duct
(2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts or in the connector grooves of the 'v'-flanges.
(4) Cleaning of the Bleed Air Ducts
(5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
(9) Remove the WARNING NOTICE(S).
Subtask 21-00-00-110-050-R ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Put a warning notice in position in the cockpit to tell persons not to start the APU or the engines. (2) Remove the section of bleed air duct forward of the ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for and remove any large quantities of oil which may be present in the bleed air ducts or in the connector grooves of the 'v'-flanges.
(4) Cleaning of the Bleed Air Ducts
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Clean contaminated bleed air ducts with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) . (5) Install the removed sections of bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Disconnect the bleed-air joint duct (B) on both engines at the bleed-pressure regulator valve side of the ducts (Ref. AMM TASK 36-11-49-000-042).
(7) Turn the bleed-air joint ducts so that they face away from the engines and any electrical cables or equipment.
NOTE: The open ends of the bleed-air joint ducts (B) must face in such a direction that the hot bleed air can vent freely to atmosphere.
(8) Put protective covers on the open ends of the bleed-pressure regulator valve. (9) Remove the WARNING NOTICE(S).
A. Cleaning of the Bleed Air Duct
(2) Remove the section of bleed air duct forward of ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for large quantities of oil in the bleed air ducts or in the connector grooves of the V-flanges. If present, clean them.
(4) Clean the contaminated bleed air ducts with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
(5) Install the removed sections of the bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Remove the overpressure valve (Ref. AMM TASK 36-11-53-000-802).
(7) Remove the ECS starter duct (Ref. AMM TASK 36-11-49-000-822).
(8) If necessary, re-install the ECS interface duct (Ref. AMM TASK 36-11-49-400-824).
(9) Remove the bleed pressure-regulator valve (Ref. AMM TASK 36-11-52-000-802).
(10) Remove the component cooling hose (Ref. AMM TASK 75-24-49-000-803) and put COVER - PROTECTION on the open ends.
(11) Remove the ECS sense line hoses (Ref. AMM TASK 36-11-49-000-823).
(12) Remove the aft fire/overheat detector (Ref. AMM TASK 26-12-17-000-803).
(13) Remove the loop-A fire harness and the electrical rail assembly (Ref. AMM TASK 26-12-61-000-802).
(14) Remove the COVER - PROTECTION from the ECS interface duct.
(15) Remove the WARNING NOTICE(S).
Subtask 21-00-00-860-068-A WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Make sure that the warning notice is in position in the cockpit to tell persons not to start the APU or the engines. (2) Remove the section of bleed air duct forward of ozone filters 100HM and 101HM (Ref. AMM TASK 36-12-41-000-001).
(3) Do a check for large quantities of oil in the bleed air ducts or in the connector grooves of the V-flanges. If present, clean them.
(4) Clean the contaminated bleed air ducts with a Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
(5) Install the removed sections of the bleed air duct (Ref. AMM TASK 36-12-41-400-001).
(6) Remove the overpressure valve (Ref. AMM TASK 36-11-53-000-802).
(7) Remove the ECS starter duct (Ref. AMM TASK 36-11-49-000-822).
(8) If necessary, re-install the ECS interface duct (Ref. AMM TASK 36-11-49-400-824).
(9) Remove the bleed pressure-regulator valve (Ref. AMM TASK 36-11-52-000-802).
(10) Remove the component cooling hose (Ref. AMM TASK 75-24-49-000-803) and put COVER - PROTECTION on the open ends.
(11) Remove the ECS sense line hoses (Ref. AMM TASK 36-11-49-000-823).
(12) Remove the aft fire/overheat detector (Ref. AMM TASK 26-12-17-000-803).
(13) Remove the loop-A fire harness and the electrical rail assembly (Ref. AMM TASK 26-12-61-000-802).
(14) Remove the COVER - PROTECTION from the ECS interface duct.
(15) Remove the WARNING NOTICE(S).
B. Do the Procedure to Start the APU
Subtask 21-00-00-160-056-A WARNING:
BE CAREFUL WHEN THE DUCTS ARE DISCONNECTED THE TEMPERATURE OF THE EXHAUST GASES FROM THE OPEN ENDS OF THE DISCONNECTED DUCTS CAN BE AS HIGH AS 270 DEG.C (518 DEG.F). THE HOT GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
C. Cleaning of the Cross Feed, the Engine and the APU Bleed Air Ducts by "Residual Burning" NOTE: Make sure that no persons are near the engines when you do this cleaning procedure.
(1) On the AIR COND panel 30VU: (a) Make sure that:
- the APU BLEED pushbutton switch ON legend shows on.
- the OFF legend on the PACK 1 and the PACK 2 pushbutton switches shows off.
- the X-BLEED selector is in the OPEN position.
D. Do the Procedure to Stop the APU
Subtask 21-00-00-860-069-A ** ON A/C NOT FOR ALL E. Aircraft Maintenance Configuration
(1) On the AIR COND panel 30VU set the X BLEED selector to the AUTO position.
(2) Connection of the Bleed-Air Joint Ducts at the Engines
(b) Connect the bleed-air joint ducts (B) (Ref. AMM TASK 36-11-49-400-040).
Subtask 21-00-00-860-069-C ** ON A/C NOT FOR ALL (1) On the AIR COND panel 30VU set the X BLEED selector to the AUTO position.
(2) Connection of the Bleed-Air Joint Ducts at the Engines
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(a) Remove the protective covers from the open ends of the bleed pressure-regulator valves. (b) Connect the bleed-air joint ducts (B) (Ref. AMM TASK 36-11-49-400-040).
NOTE: Make sure that you do the leak check after connection of the bleed-air joint ducts.
E. Aircraft Maintenance Configuration
(1) On the AIR COND panel 30VU set the X BLEED selector to the AUTO position.
(2) Connection of the Bleed-Air Joint Ducts at the Engines
(b) Connect the bleed-air joint ducts (B) (Ref. AMM TASK 36-11-49-400-042).
Subtask 21-00-00-860-069-F ** ON A/C NOT FOR ALL (1) On the AIR COND panel 30VU set the X BLEED selector to the AUTO position.
(2) Connection of the Bleed-Air Joint Ducts at the Engines
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(a) Remove the protective covers from the open ends of the bleed pressure-regulator valves. (b) Connect the bleed-air joint ducts (B) (Ref. AMM TASK 36-11-49-400-042).
NOTE: Make sure that you do the leak check after connection of the bleed-air joint ducts.
E. Aircraft Maintenance Configuration
(2) Do a general visual inspection of the core compartment (Ref. AMM TASK 05-24-50-210-801). Clean the components of the exhaust plume of the ECS interface duct if necessary.
(3) Do a general visual inspection of the thrust-reverser thermal blankets (Ref. AMM TASK 78-32-00-210-821).
(4) Install the component cooling hose (Ref. AMM TASK 75-24-49-400-803).
(5) Install the aft fire/overheat detector (Ref. AMM TASK 26-12-17-400-803).
(6) Install the loop-A fire harness and the electrical rail assembly (Ref. AMM TASK 26-12-61-400-802).
(7) Install the bleed pressure-regulator valve (Ref. AMM TASK 36-11-52-400-802).
(8) Install the ECS starter duct (Ref. AMM TASK 36-11-49-400-822).
(9) Install the ECS sense line hoses (Ref. AMM TASK 36-11-49-400-823).
(10) Install the overpressure valve (Ref. AMM TASK 36-11-53-400-802).
(11) If necessary, re-install the ECS interface duct (Ref. AMM TASK 36-11-49-400-824).
(12) Do the operational test of the bleed air system (Ref. AMM TASK 36-11-00-710-802).
Subtask 21-00-00-869-056-A ** ON A/C NOT FOR ALL WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) On the AIR COND panel 30VU set the X BLEED selector to the AUTO position. (2) Do a general visual inspection of the core compartment (Ref. AMM TASK 05-24-50-210-801). Clean the components of the exhaust plume of the ECS interface duct if necessary.
(3) Do a general visual inspection of the thrust-reverser thermal blankets (Ref. AMM TASK 78-32-00-210-821).
(4) Install the component cooling hose (Ref. AMM TASK 75-24-49-400-803).
(5) Install the aft fire/overheat detector (Ref. AMM TASK 26-12-17-400-803).
(6) Install the loop-A fire harness and the electrical rail assembly (Ref. AMM TASK 26-12-61-400-802).
(7) Install the bleed pressure-regulator valve (Ref. AMM TASK 36-11-52-400-802).
(8) Install the ECS starter duct (Ref. AMM TASK 36-11-49-400-822).
(9) Install the ECS sense line hoses (Ref. AMM TASK 36-11-49-400-823).
(10) Install the overpressure valve (Ref. AMM TASK 36-11-53-400-802).
(11) If necessary, re-install the ECS interface duct (Ref. AMM TASK 36-11-49-400-824).
(12) Do the operational test of the bleed air system (Ref. AMM TASK 36-11-00-710-802).
F. Preparation for the Stage 1 Cleaning of the ECS
(2) Remove the clamps and the sleeve between the condenser 11HM2 and the check valve 16HM duct flange.
(3) Put the special blanking caps on the open end of the check valve 15HM and on the open end of the check valve 16HM duct flange.
(a) Remove the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-000-001).
(b) Do a check for oil contamination in the interior of the mixer unit.
(c) Cleaning of the Mixer Unit
(d) Install the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-400-001).
(6) Examine the heating trim-air line for contamination.
1 If there is no contamination, install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
3 If there is oil in the trim-air pressure-regulating valve (14HK):
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the ducting downstream and check for oil-contamination.
c Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
d When dry install the ducting and the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
(7) On the AIR COND panel 30VU make sure that:
(a) The COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are at the 12 o'clock position.
(b) The X BLEED selector is at the AUTO position.
(8) On the VENTILATION section of panel 22VU:
(a) Push the CAB FANS pushbutton switch to the off position (the OFF legend comes on).
(9) At the ram air outlets:
(a) Put warning notices in position to tell persons not to go near the ram-air outlets.
Subtask 21-00-00-869-056-C ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove the clamps and the sleeve between the condenser 10HM2 and the check valve 15HM. (2) Remove the clamps and the sleeve between the condenser 11HM2 and the check valve 16HM duct flange.
(3) Put the special blanking caps on the open end of the check valve 15HM and on the open end of the check valve 16HM duct flange.
NOTE: Use the removed clamps to secure the blanking caps.
(4) Do a check for and make a note of any oil contamination in the condensers. NOTE: Water condensation can occur in the condensers. This must be ignored.
(5) If oil contamination is found in the condensers you must: (a) Remove the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-000-001).
(b) Do a check for oil contamination in the interior of the mixer unit.
(c) Cleaning of the Mixer Unit
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1 If oil contamination is found you must remove it from the areas that you can get access to with a Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) . (d) Install the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-400-001).
(6) Examine the heating trim-air line for contamination.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Remove the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-000-001) and examine it for contamination. 1 If there is no contamination, install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
3 If there is oil in the trim-air pressure-regulating valve (14HK):
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the ducting downstream and check for oil-contamination.
c Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
d When dry install the ducting and the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
(7) On the AIR COND panel 30VU make sure that:
(a) The COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are at the 12 o'clock position.
(b) The X BLEED selector is at the AUTO position.
(8) On the VENTILATION section of panel 22VU:
(a) Push the CAB FANS pushbutton switch to the off position (the OFF legend comes on).
(9) At the ram air outlets:
(a) Put warning notices in position to tell persons not to go near the ram-air outlets.
F. Preparation for the Stage 1 Cleaning of the ECS
(2) Remove the clamps and the sleeve between the condenser 11HM2 and the check valve 16HM duct flange.
(3) Put the special blanking caps on the open end of the check valve 15HM and on the open end of the check valve 16HM duct flange.
(a) Remove the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-000-001).
(b) Do a check for oil contamination in the interior of the mixer unit.
(c) Cleaning of the Mixer Unit
(d) Install the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-400-001).
(6) Examine the cargo heating trim-air line for contamination.
1 If there is no contamination, install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
c On CARGO HEAT panel 22VU, make sure that the AFT temperature selector is set to HOT.
d On AIR COND panel 30VU, make sure that the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are set to COLD.
3 If there is oil in the trim-air pressure-regulating valve (14HK):
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the ducting downstream and check for oil-contamination.
c Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
d When dry install the ducting and the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
(b) Remove the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-000-001) and examine it for contamination.
1 If there is no contamination, install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (11HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
c Remove the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-000-001).
d Clean the trim-air valve (12HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
e Install the trim-air valve (12HC) (Ref. AMM TASK 21-43-52-400-001).
f Operate the cargo-heating system for 15 minutes:
a Clean the trim-air pressure-regulating valve (11HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-000-001).
c Clean the trim-air valve (12HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
d Remove the ducting downstream and check for oil-contamination.
e Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
f When dry install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
g When dry install the ducting and the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-400-001).
(7) On the AIR COND panel 30VU make sure that:
(a) The COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are at the 12 o'clock position.
(b) The X BLEED selector is at the AUTO position.
(8) On the VENTILATION section of panel 22VU:
(a) Push the CAB FANS pushbutton switch to the OFF position (the OFF legend comes on).
(9) At the ram air outlets:
(a) Put warning notices in position to tell persons not to go near the ram-air outlets.
Subtask 21-00-00-865-071-A WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove the clamps and the sleeve between the condenser 10HM2 and the check valve 15HM. (2) Remove the clamps and the sleeve between the condenser 11HM2 and the check valve 16HM duct flange.
(3) Put the special blanking caps on the open end of the check valve 15HM and on the open end of the check valve 16HM duct flange.
NOTE: Use the removed clamps to secure the blanking caps.
(4) Do a check for and make a note of any oil contamination in the condensers. NOTE: Water condensation can occur in the condensers. This must be ignored.
(5) If oil contamination is found in the condensers you must: (a) Remove the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-000-001).
(b) Do a check for oil contamination in the interior of the mixer unit.
(c) Cleaning of the Mixer Unit
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1 If oil contamination is found in the mixer unit you must remove it with a Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) . (d) Install the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-51-400-001).
(6) Examine the cargo heating trim-air line for contamination.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(a) Remove the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-000-001) and examine it for contamination. 1 If there is no contamination, install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
c On CARGO HEAT panel 22VU, make sure that the AFT temperature selector is set to HOT.
d On AIR COND panel 30VU, make sure that the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are set to COLD.
3 If there is oil in the trim-air pressure-regulating valve (14HK):
a Clean the trim-air pressure-regulating valve (14HK) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the ducting downstream and check for oil-contamination.
c Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
d When dry install the ducting and the trim-air pressure-regulating valve (14HK) (Ref. AMM TASK 21-63-52-400-001).
(b) Remove the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-000-001) and examine it for contamination.
1 If there is no contamination, install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
2 If there is a dust-like contamination:
a Clean the trim-air pressure-regulating valve (11HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
c Remove the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-000-001).
d Clean the trim-air valve (12HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
e Install the trim-air valve (12HC) (Ref. AMM TASK 21-43-52-400-001).
f Operate the cargo-heating system for 15 minutes:
- On CARGO HEAT panel 22VU, make sure that the AFT temperature selector is set to HOT.
- On AIR COND panel 30VU, make sure that the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are set to COLD.
a Clean the trim-air pressure-regulating valve (11HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
b Remove the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-000-001).
c Clean the trim-air valve (12HC) with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
d Remove the ducting downstream and check for oil-contamination.
e Clean the ducting with a lint-free cloth Textile-Lint free Cotton - (Material No.14SBA1) and Aqueous Cleaner-Aircraft Exterior Pressure Spraying - (Material No.08ABC1) .
f When dry install the trim-air pressure-regulating valve (11HC) (Ref. AMM TASK 21-43-52-400-001).
g When dry install the ducting and the trim-air valve (12HC) (Ref. AMM TASK 21-43-51-400-001).
(7) On the AIR COND panel 30VU make sure that:
(a) The COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors are at the 12 o'clock position.
(b) The X BLEED selector is at the AUTO position.
(8) On the VENTILATION section of panel 22VU:
(a) Push the CAB FANS pushbutton switch to the OFF position (the OFF legend comes on).
(9) At the ram air outlets:
(a) Put warning notices in position to tell persons not to go near the ram-air outlets.
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-00-00-860-070-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
H. On the AIR COND panel 30VU turn the PACK FLOW selector to the HI position.
Subtask 21-00-00-860-070-B ** ON A/C NOT FOR ALL H. On the AIR COND panel 30VU push the ECON FLOW pushbutton switch to the off position (the ON legend goes off).
Subtask 21-00-00-160-057-E ** ON A/C NOT FOR ALL WARNING:
BE CAREFUL WHEN YOU DO THIS CLEANING PROCEDURE. A VERY STRONG HOT OR COLD AIRFLOW WILL OCCUR IN THE AREA OF THE PACK BAY. THIS AIRFLOW CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR OUTLETS.
HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE AREA NEAR THE RAM AIR INLET IS CLEAN AND FREE FROM LOOSE ARTICLES. LOOSE ARTICLES CAN GO INTO THE RAM AIR INLET AND CAUSE DAMAGE TO EQUIPMENT.
I. Stage 1 Cleaning of the ECS NOTE: Make sure that at least one of the windows in the cockpit stays open during this part of the decontamination procedure.
(1) Start the engine 1(2) and keep it at idle (Ref. AMM TASK 71-00-00-710-003). (2) On the AIR COND panel 30VU:
(a) Make sure that:
- the X BLEED selector is at the AUTO position,
- the PACK 1 and the PACK 2 pushbutton switches are in the on position (the FAULT and the OFF legends are off).
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(3) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the pack temperatures.
(5) To do this you must: (a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
- the pack compressor outlet temperature does not go above 230 deg. C maximum (max.) and
- the pack outlet temperature does not go above 85 deg. C (max.).
NOTE: If any of the temperatures go above max. you must stop the procedure and do the trouble shooting of the ECS (refer to TSM, chapter 21).
(6) Move the applicable throttle control lever to the idle position. (7) On the ECAM control panel push the COND pushbutton switch.
(8) Blow warm air onto the zone temperature sensor 21HK (behind the grill in the cockpit ceiling) with a warm air blower.
NOTE: Do not damage the cockpit interior with to much heat from the warm air blower.
(9) On the ECAM lower DU monitor the CKPT compartment temperature until it shows between 30 and 40 deg. C. NOTE: You must keep this condition during work steps (10) to (12) by use of the warm air blower as in work step (8).
(10) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the COLD position. (11) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must also constantly monitor the pack temperatures as in work step (5) of this paragraph.
(13) Move the applicable throttle control lever to the idle position. (14) Stop the warm air blower.
(15) On the ECAM control panel push the COND pushbutton switch.
(16) On the ECAM lower DU make sure that the CKPT, the FWD cabin and the AFT cabin temperatures decrease to, or are less than 24 deg. C.
(17) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(18) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the pack temperatures as in work step (5) of this paragraph.
WARNING:
BE CAREFUL WHEN YOU DO THIS CLEANING PROCEDURE. A VERY STRONG HOT OR COLD AIRFLOW WILL OCCUR IN THE AREA OF THE PACK BAY. THIS AIRFLOW CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR OUTLETS.
HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE AREA NEAR THE RAM AIR INLET IS CLEAN AND FREE FROM LOOSE ARTICLES. LOOSE ARTICLES CAN GO INTO THE RAM AIR INLET AND CAUSE DAMAGE TO EQUIPMENT.
I. Stage 1 Cleaning of the ECS NOTE: Make sure that at least one of the windows in the cockpit stays open during this part of the decontamination procedure.
(1) Start the engine 1(2) and keep it at idle (Ref. AMM TASK 71-00-00-710-003). (2) On the AIR COND panel 30VU:
(a) Make sure that:
- the X BLEED selector is at the AUTO position,
- the PACK 1 and the PACK 2 pushbutton switches are in the on position (the FAULT and the OFF legends are off).
(a) On the CARGO HEAT panel 22VU and the AIR COND panel 30VU push the HOT AIR pushbutton switches to the off position (the OFF legends come on).
(b) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(4) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the pack temperatures.
(6) To do this you must: (a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
- the pack compressor outlet temperature does not go above 230 deg. C maximum (max.) and
- the pack outlet temperature does not go above 85 deg. C (max.).
NOTE: If any of the temperatures go above max. you must stop the procedure and do the trouble shooting of the ECS (refer to TSM, chapter 21).
(7) Move the applicable throttle control lever to the idle position. (8) On the ECAM control panel push the COND pushbutton switch.
(9) Blow warm air onto the zone temperature sensor 21HK (behind the grill in the cockpit ceiling) with a warm air blower.
NOTE: Do not damage the cockpit interior with to much heat from the warm air blower.
(10) On the ECAM lower DU monitor the CKPT compartment temperature until it shows between 30 and 40 deg. C. NOTE: You must keep this condition during work steps (10) to (12) by use of the warm air blower as in work step (8).
(11) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the COLD position. (12) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must also constantly monitor the pack temperatures as in work step (5) of this paragraph.
(14) Move the applicable throttle control lever to the idle position. (15) Stop the warm air blower.
(16) On the ECAM control panel push the COND pushbutton switch.
(17) On the ECAM lower DU make sure that the CKPT, the FWD cabin and the AFT cabin temperatures decrease to, or are less than 24 deg. C.
(18) On the AIR COND panel 30VU turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(19) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the pack temperatures as in work step (5) of this paragraph.
K. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-00-00-210-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
L. Inspection of the ECS for Contamination
(2) If there is no oil contamination in the condensers then carry on with the preparation for and stage 2 cleaning of the ECS.
(3) If you find oil contamination in the condensers then you must:
(a) To do an overhaul:
1 Remove the air cycle machine (Ref. AMM TASK 21-52-21-000-001).
2 To do an overhaul of the air cycle machine, send it to the workshop.
3 Install the air cycle machine (Ref. AMM TASK 21-52-21-400-001), or
(b) Replace the air cycle machine (Ref. AMM TASK 21-52-21-000-001) and (Ref. AMM TASK 21-52-21-400-001).
Subtask 21-00-00-869-057-A WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Do a check by hand for oil contamination in the condensers 10HM2 and 11HM2. (2) If there is no oil contamination in the condensers then carry on with the preparation for and stage 2 cleaning of the ECS.
(3) If you find oil contamination in the condensers then you must:
- clean the components in the system as necessary (Ref. AMM TASK 21-00-00-100-001),
- carry on with the preparation for and stage 2 cleaning of the ECS.
(a) To do an overhaul:
1 Remove the air cycle machine (Ref. AMM TASK 21-52-21-000-001).
2 To do an overhaul of the air cycle machine, send it to the workshop.
3 Install the air cycle machine (Ref. AMM TASK 21-52-21-400-001), or
(b) Replace the air cycle machine (Ref. AMM TASK 21-52-21-000-001) and (Ref. AMM TASK 21-52-21-400-001).
M. Preparation for Stage 2 Cleaning of the ECS
(1) Remove the special blanking caps from the check valve 15HM and from the check valve 16HM duct flange.
(2) Install the sleeves and the clamps on the check valve 15HM and on the check valve 16HM duct flange (Ref. AMM TASK 21-52-43-400-001).
(3) Install the sleeves and the clamps on the condensers 10HM2 and 11HM2 (Ref. AMM TASK 21-52-32-400-001).
Subtask 21-00-00-865-073-A (1) Remove the special blanking caps from the check valve 15HM and from the check valve 16HM duct flange.
(2) Install the sleeves and the clamps on the check valve 15HM and on the check valve 16HM duct flange (Ref. AMM TASK 21-52-43-400-001).
(3) Install the sleeves and the clamps on the condensers 10HM2 and 11HM2 (Ref. AMM TASK 21-52-32-400-001).
N. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-00-00-860-072-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
O. On the AIR COND panel 30VU turn the PACK FLOW selector to the NORM position.
Subtask 21-00-00-860-072-B ** ON A/C NOT FOR ALL O. On the AIR COND panel 30VU Push the ECON FLOW pushbutton switch to the on position (the ON legend comes on).
Subtask 21-00-00-160-058-G ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR OUTLETS.
HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE AREA NEAR THE RAM AIR INLET IS CLEAN AND FREE FROM LOOSE ARTICLES. LOOSE ARTICLES CAN GO INTO THE RAM AIR INLET AND CAUSE DAMAGE TO EQUIPMENT.
P. Stage 2 Cleaning of the ECS NOTE: Make sure that at least one of the windows in the cockpit stays open during this part of the decontamination procedure.
(1) Start the engine 1(2) (Ref. AMM TASK 71-00-00-710-003)(2) On the AIR COND panel 30VU:
(a) Make sure that:
- the X BLEED selector is at the AUTO position,
- the PACK 1 and the PACK 2 pushbutton switches are in the on position (the FAULT and the OFF legends are off).
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(3) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the duct inlet and the pack temperatures.
(5) To do this you must: (a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
- the pack compressor outlet temperature does not go above 230 deg. C (max.) and,
- the pack outlet temperature does not go above 85 deg. C (max.).
(d) On the ECAM lower DU make sure that the duct inlet temperature does not go above 70 deg. C (max.).
NOTE: If any of the temperatures go above max. you must stop the procedure and do the trouble shooting of the ECS (refer to TSM, chapter 21).
WARNING:
MAKE SURE THAT THERE ARE NO PERSONS OR EQUIPMENT NEAR THE RAM AIR OUTLETS.
HOT EXHAUST GASES CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION:
MAKE SURE THAT THE AREA NEAR THE RAM AIR INLET IS CLEAN AND FREE FROM LOOSE ARTICLES. LOOSE ARTICLES CAN GO INTO THE RAM AIR INLET AND CAUSE DAMAGE TO EQUIPMENT.
P. Stage 2 Cleaning of the ECS NOTE: Make sure that at least one of the windows in the cockpit stays open during this part of the decontamination procedure.
(1) Start the engine 1(2) (Ref. AMM TASK 71-00-00-710-003). (2) On the CARGO HEAT panel 22VU push the HOT AIR pushbutton switch to the off position. (the OFF legend comes on).
(3) On the AIR COND panel 30VU:
(a) Make sure that:
- the X BLEED selector is at the AUTO position,
- the PACK 1 and the PACK 2 pushbutton switches are in the on position (the FAULT and the OFF legends are off).
(c) Turn the COCKPIT, the FWD CABIN and the AFT CABIN temperature selectors to the HOT position.
(4) Move the applicable throttle control lever forward until on the upper ECAM DU a N1 of between 35 and 40 per cent (immediately before HPV closure) is shown.
(a) On the lower ECAM DU, the BLEED page shows:
- PRV ENG 1 (or ENG 2) in line green,
- HPV ENG 1 (or ENG 2) in line green,
- ENG 1 (or ENG 2) pressure: 36 psi (2.48 bar) plus or minus 4 psi (0.28 bar)
- ENG 1 (or ENG 2) temperature: 200 deg.C (392.00 deg.F) plus 10 deg.C (50.00 deg.F) or minus 30 deg.C (86.00 deg.F).
NOTE: During this 15 minute period you must constantly monitor the duct inlet and the pack temperatures.
(6) To do this you must: (a) On the ECAM control panel push the BLEED pushbutton switch.
(b) On the ECAM lower DU make sure that:
- the pack compressor outlet temperature does not go above 230 deg. C (max.) and,
- the pack outlet temperature does not go above 85 deg. C (max.).
(d) On the ECAM lower DU make sure that the duct inlet temperature does not go above 70 deg. C (max.).
NOTE: If any of the temperatures go above max. you must stop the procedure and do the trouble shooting of the ECS (refer to TSM, chapter 21).
Q. Aircraft Maintenance Configuration
(1) Stop the engine (Ref. AMM TASK 71-00-00-710-028).
(2) If there is smoke in the cockpit or cabin then you must do the decontamination procedure again.
(3) If after 20 minutes, with the recirculation fans running, you can still smell the oil, you must replace the recirculation filters (Ref. AMM TASK 21-21-41-000-001) (Ref. AMM TASK 21-21-41-400-001).
(4) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
Subtask 21-00-00-865-074-A (1) Stop the engine (Ref. AMM TASK 71-00-00-710-028).
(2) If there is smoke in the cockpit or cabin then you must do the decontamination procedure again.
(3) If after 20 minutes, with the recirculation fans running, you can still smell the oil, you must replace the recirculation filters (Ref. AMM TASK 21-21-41-000-001) (Ref. AMM TASK 21-21-41-400-001).
(4) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
R. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-00-00-210-055-C ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
S. Post Cleaning and Inspection of the ECS
(a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control valves 8HB and 11HB:
1 Remove the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control valves, send them to the workshop.
3 Install the pack flow-control valves (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
Subtask 21-00-00-210-055-D ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove, clean and install: (a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
NOTE: Overhaul or replacement of the ozone filters 100HM and 101HM is only necessary if smell was reported during stage 2 cleaning of the ECS.
(a) To do an overhaul: 1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control valves 8HB and 11HB:
NOTE: Overhaul or replacement of the Flow-Control Valves 8HB and 11HB is only necessary if the valves are oil contaminated from inside.
(a) To do an overhaul: 1 Remove the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control valves, send them to the workshop.
3 Install the pack flow-control valves (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
S. Post Cleaning and Inspection of the ECS
(a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control valves 8HB and 11HB:
1 Remove the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control valves, send them to the workshop.
3 Install the pack flow-control valves (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
Subtask 21-00-00-210-055-E ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove, clean and install: (a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
NOTE: Overhaul or replacement of the ozone filters 100HM and 101HM is only necessary if smell was reported during stage 2 cleaning of the ECS.
(a) To do an overhaul: 1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control valves 8HB and 11HB:
NOTE: Overhaul or replacement of the Flow-Control Valves 8HB and 11HB is only necessary if the valves are oil contaminated from inside.
(a) To do an overhaul: 1 Remove the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control valves, send them to the workshop.
3 Install the pack flow-control valves (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control valves (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
S. Post Cleaning and Inspection of the ECS
(a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
Subtask 21-00-00-210-055-G ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove, clean and install: (a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
NOTE: Overhaul or replacement of the Flow-Control Units 23HB and 24HB is only necessary if the valves are oil contaminated from inside.
(a) To do an overhaul: 1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
S. Post Cleaning and Inspection of the ECS
(a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injector 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
Subtask 21-00-00-210-055-H ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove, clean and install: (a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injector 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
NOTE: Overhaul or replacement of the ozone filters 100HM and 101HM is only necessary if smell was reported during stage 2 cleaning of the ECS.
(a) To do an overhaul: 1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
NOTE: Overhaul or replacement of the Flow-Control Units 23HB and 24HB is only necessary if the valves are oil contaminated from inside.
(a) To do an overhaul: 1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
S. Post Cleaning and Inspection of the ECS
(a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
Subtask 21-00-00-865-089-A WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE COMPONENT UNTIL IT IS SUFFICIENTLY
COOL TO PREVENT BURNS.
(1) Remove, clean and install: (a) Clean water extractors 10HM8, 11HM8 and the water extractor drain lines:
1 Remove the water extractors and the water-extractor drain lines (Ref. AMM TASK 21-52-16-000-001).
2 To clean the water extractors, send them to the workshop.
3 Install the water extractors and water-extractor drain lines (Ref. AMM TASK 21-52-16-400-001).
(b) Clean water injectors 20HM and 21HM:
1 Remove the water injectors (Ref. AMM TASK 21-52-42-000-001).
2 To clean the water injectors, send them to the workshop.
3 Install the water injectors (Ref. AMM TASK 21-52-42-400-001).
(2) Remove, overhaul or replace and install ozone filters 100HM and 101HM:
NOTE: Overhaul or replacement of the ozone filters 100HM and 101HM is only necessary if smell was reported during stage 2 cleaning of the ECS.
(a) To do an overhaul: 1 Remove the ozone filters (Ref. AMM TASK 21-51-41-000-001).
2 To do an overhaul of the ozone filters, send them to the workshop.
3 Install the ozone filters (Ref. AMM TASK 21-51-41-400-001), or
(b) Replace the ozone filters (Ref. AMM TASK 21-51-41-000-001) and (Ref. AMM TASK 21-51-41-400-001).
(3) Remove, overhaul or replace and install pack flow-control units 23HB and 24HB:
NOTE: Overhaul or replacement of the Flow-Control Units 23HB and 24HB is only necessary if the valves are oil contaminated from inside.
(a) To do an overhaul: 1 Remove the pack flow-control units (Ref. AMM TASK 21-51-51-000-001).
2 To do an overhaul of the pack flow-control units, send them to the workshop.
3 Install the pack flow-control units (Ref. AMM TASK 21-51-51-400-001), or
(b) Replace the pack flow-control units (Ref. AMM TASK 21-51-51-000-001) and (Ref. AMM TASK 21-51-51-400-001).
T. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-00-00-710-052-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/AFT CARGO/VENT & HTG/CTL & MONG | 31HN | C07 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/TEMP CTL/SYS 1 CHAN B/28VDC | 52HH | D08 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/115VAC | 21HH | W22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/2/28VDC | 23HH | W21 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/115VAC | 1HH | X22 |
| 122VU | AIR COND/PACK TEMP/CTL SYS1/1/28VDC | 3HH | X21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/28VDC | 24HH | Y21 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/2/115VAC | 22HH | Y20 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/28VDC | 4HH | Y19 |
| 122VU | AIR COND/PACK TEMP CTL SYS2/1/115VAC | 2HH | Y18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/AFT CARGO VENT/FAN | 30HN | S22 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/115VAC | 53HH | W22 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN A/28VDC | 55HH | W21 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/115VAC | 49HH | X22 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN A/28VDC | 51HH | X21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/28VDC | 56HH | Y21 |
| 122VU | AIR COND/TEMP CTL SYS 2/CHAN B/115VAC | 54HH | Y20 |
| 122VU | AIR COND/TEMP CTL SYS 1/CHAN B/115VAC | 50HH | Y18 |
U. Checks and Test of the ECS
(1) Do the pre-conditioning with the APU or through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of:
(a) All the air pack and the air pack component connections at each of the air packs.
(b) The mixer unit and the recirculation fan connections.
(c) Any reconnected bleed-air duct connections.
(3) Do the operational test of the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-00-710-001).
(4) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
(5) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
Subtask 21-00-00-710-052-B ** ON A/C NOT FOR ALL (1) Do the pre-conditioning with the APU or through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of:
(a) All the air pack and the air pack component connections at each of the air packs.
(b) The mixer unit and the recirculation fan connections.
(c) Any reconnected bleed-air duct connections.
(3) Do the operational test of the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-00-710-001).
(4) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
(5) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
U. Checks and Test of the ECS
(1) Do the pre-conditioning with the APU or through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of:
(a) All the air pack and the air pack component connections at each of the air packs.
(b) The mixer unit and the recirculation fan connections.
(c) Any reconnected bleed-air duct connections.
(3) Do the operational test of the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-00-710-001).
(4) Do the operational test of the AFT cargo-compartment heating system (Ref. AMM TASK 21-43-00-710-003).
(5) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
(6) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
5. Close-up(1) Do the pre-conditioning with the APU or through the HP ground connector (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
(2) Do a leak check of:
(a) All the air pack and the air pack component connections at each of the air packs.
(b) The mixer unit and the recirculation fan connections.
(c) Any reconnected bleed-air duct connections.
(3) Do the operational test of the cabin recirculation fans 14HG and 15HG (Ref. AMM TASK 21-21-00-710-001).
(4) Do the operational test of the AFT cargo-compartment heating system (Ref. AMM TASK 21-43-00-710-003).
(5) Do the operational test of the cockpit and cabin temperature control (Ref. AMM TASK 21-63-00-710-004).
(6) Stop the pre-conditioning (Ref. AMM TASK 12-33-21-618-001) or (Ref. AMM TASK 12-33-21-618-001).
Subtask 21-00-00-410-052-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 191BB, 192FB, 191KB and 192KB (Ref. AMM TASK 53-35-13-400-002)
(3) Remove the WARNING NOTICE(S).
Subtask 21-00-00-862-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 191BB, 192FB, 191KB and 192KB (Ref. AMM TASK 53-35-13-400-002)
(3) Remove the WARNING NOTICE(S).
Special Blanking Caps