W DOC AIRBUS | AMM A320F

Replacement of the Hydraulic Fluid in the Green Hydraulic System because of an Increased Level of Acidity when a Ground Cart is not Available


TASK 12-36-29-600-802-A
Replacement of the Hydraulic Fluid in the Green Hydraulic System because of an Increased Level of Acidity when a Ground Cart is not Available


WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES. WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING: DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM YOUR EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU GET HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
WARNING: MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
1. Reason for the Job
This is an alternative procedure for the hydraulic fluid replacement in the Green Hydraulic System. This procedure must be used when the value of the hydraulic fluid acidity is between 1.5 and 3.5 mg KOH/g and when the Ground Cart is not available.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197CB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-32-29-281-001-A
Analyze Hydraulic Fluid
TASK 12-36-29-600-001-A
Change of the Hydraulic Fluid in the Green Hydraulic System - with Ground Cart Available
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-680-001-A
Drainage of the Reservoir of the Green Hydraulic System
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
3. Job Set-up
Subtask 12-36-29-860-150-A
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 12-36-29-860-152-A
B. Safety Precautions
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
   (3) Put the WARNING NOTICE(S) in position to tell persons not to pressurize the Green Hydraulic System:
  • In the cockpit, on the HYD overhead panel 40VU.
Subtask 12-36-29-010-107-A
C. Get Access
   (1) Open the access door 197CB.
   (2) Open the left hand or right hand Main-Landing-Gear (MLG) door (Ref. AMM TASK 32-12-00-010-001).
   (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the MLG bay.
4. Procedure
Subtask 12-36-29-611-083-A
A. Replacement of the Hydraulic Fluid in the Green Hydraulic System
   (1) If the acidity of the fluid in the Green Hydraulic System is between 1.0 and 1.2 mg KOH/g, do the steps that follow in the next thirty days:
     (a) Drain the reservoir of the Green Hydraulic System (Ref. AMM TASK 29-10-00-680-001).
     (b) Fill the reservoir of the Green Hydraulic System with a hand pump (Ref. AMM TASK 12-12-29-611-001).
     (c) In less than thirty days and after a minimum of one flight or operating with the flights controls:
     (d) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (e) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (2) If the acidity in the Green hydraulic system is between 1.2 and 1.5 mg KOH/g, do the steps that follow in the next thirty days:
     (a) Drain the reservoir of the Green hydraulic system (Ref. AMM TASK 29-10-00-680-001).
     (b) Fill the reservoir of the Green Hydraulic System with a hand pump (Ref. AMM TASK 12-12-29-611-001).
     (c) In less than thirty days and after a minimum of one flight or operating with the flights controls:
     (d) In less than thirty days and after a minimum of one flight or operating with the flights controls:
     (e) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (f) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (3) If the acidity in the Green hydraulic system is between 1.5 and 1.8 mg KOH/g, do the steps that follow in the next fourteen days:
     (a) Drain the reservoir of the Green hydraulic system (Ref. AMM TASK 29-10-00-680-001).
     (b) Fill the reservoir of the Green Hydraulic System with a hand pump (Ref. AMM TASK 12-12-29-611-001).
     (c) In less than fourteen days and after a minimum of one flight or operating with the flights controls:
     (d) Do the procedure given in step (c) four times in total.
     (e) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (f) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (4) If the acidity in the Green hydraulic system is between 1.8 and 2.2 mg KOH/g, do the steps that follow in the next fourteen days:
     (a) Drain the reservoir of the Green hydraulic system (Ref. AMM TASK 29-10-00-680-001).
     (b) Fill the reservoir of the Green Hydraulic System with a hand pump (Ref. AMM TASK 12-12-29-611-001).
     (c) In less than fourteen days and after a minimum of one flight or operating with the flights controls:
     (d) Do the procedure given in step (c) five times in total.
     (e) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (f) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (5) If the acidity in the Green hydraulic system is between 2.2 and 2.5 mg KOH/g, do the steps that follow in the next fourteen days:
     (a) Drain the reservoir of the Green hydraulic system (Ref. AMM TASK 29-10-00-680-001).
     (b) Fill the reservoir of the Green Hydraulic System with a hand pump (Ref. AMM TASK 12-12-29-611-001).
     (c) In less than fourteen days and after a minimum of one flight or operating with the flights controls:
     (d) Do the procedure given in step (c) six times in total.
     (e) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (f) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (6) If the acidity in the Green hydraulic system is between 2.5 and 3.5 mg KOH/g, do the steps that follow in less than three flights:
NOTE: If there is a contamination in more than one system, no period is permitted.
     (a) Change the Hydraulic Fluid in the Green Hydraulic System (Ref. AMM TASK 12-36-29-600-001).
     (b) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (c) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
   (7) If the acidity in the Green hydraulic system is more than 3.5 mg KOH/g, do the steps that follow:
NOTE: The grace period is not permitted.
     (a) Change the Hydraulic Fluid in the Green Hydraulic System (Ref. AMM TASK 12-36-29-600-001).
     (b) Take a new sample minimum after 1 FC and in seven days. Test result must be available in 30 days.
     (c) If acidity level is less than 1, make an analysis of the hydraulic fluid at the next scheduled maintenance (MPD check), or in the next 12 months, the one that occurs first (Ref. AMM TASK 12-32-29-281-001).
5. Close-up
Subtask 12-36-29-410-094-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 197CB.
   (3) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 12-36-29-860-151-A
B. Put the aircraft back to its initial configuration.
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the access platform(s).
   (3) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:46:35 UTC