Flushing of the Green Hydraulic System of the Trimmable Horizontal Stabilizer (THS) Actuator
TASK 12-36-29-170-012-A
Flushing of the Green Hydraulic System of the Trimmable Horizontal Stabilizer (THS) Actuator
To flush the Green hydraulic system after a failure in that part of the THS actuator 9CE.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 12-36-29-860-083-A
Subtask 12-36-29-170-061-A
Subtask 12-36-29-860-085-A
[Rev.10 from 2021]
2026.04.02 06:10:39 UTC
Flushing of the Green Hydraulic System of the Trimmable Horizontal Stabilizer (THS) Actuator
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
- FLUSH IT AWAY WITH CLEAN WATER
- GET MEDICAL AID.
FIN: 9CE
1. Reason for the JobTo flush the Green hydraulic system after a failure in that part of the THS actuator 9CE.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | ACCESS PLATFORM 4M (13 FT) |
| No specific | 1 | CONTAINER 5 L (1.32 USGAL) |
| No specific | 1 | LOCALLY MANUFACTURED - ADAPTER |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | 1 | WARNING NOTICE(S) |
| ALT29000001 | 1 | HYD GRND PWR UNIT3000 |
| REFERENCE | DESIGNATION |
|---|---|
| No specific | corrosion-resistant steel lockwire 0.8 mm (0.032 in) dia |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 197CB, 312AR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-11-44-610-001-A | Servicing of the LP-Filter |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 12-36-29-860-083-A
A. Aircraft Maintenance Configuration
(1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(5) Put the WARNING NOTICE(S) in position.
(6) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(7) Put the ACCESS PLATFORM 4M (13 FT) in position at the Zone 310.
Subtask 12-36-29-010-095-A (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(2) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
(3) Depressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-001).
(4) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(5) Put the WARNING NOTICE(S) in position.
(6) As necessary, use the applicable SAFETY BARRIERS, specified by the operator's instructions and your local regulations.
(7) Put the ACCESS PLATFORM 4M (13 FT) in position at the Zone 310.
B. Get Access
(1) Open the access door 312AR.
(2) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001).
(3) Open the access door 197CB.
Subtask 12-36-29-860-084-A (1) Open the access door 312AR.
(2) Open the left MLG door (Ref. AMM TASK 32-12-00-010-001).
(3) Open the access door 197CB.
C. Preparation for the Flushing Procedure
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at Zone 147.
(2) Put a CONTAINER 5 L (1.32 USGAL) in position to collect the hydraulic fluid below:
(4) Disconnect the pressure line from the valve block.
(5) Disconnect the return line from the valve block.
(6) Disconnect the return line from the LP manifold 1003GM.
(7) Connect the pressure line to the return line at the THS actuator 9CE with an union.
(9) Connect the pressure hose of the ALT29000001 HYD GRND PWR UNIT3000 to the delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
(10) Connect the return hose of the ALT29000001 HYD GRND PWR UNIT3000 to the return line at the LP manifold 1003GM with an LOCALLY MANUFACTURED - ADAPTER.
(11) Put the PLUG-BLANKING in each disconnected line end.
4. Procedure(1) Put the ACCESS PLATFORM 2M (6 FT) in position at Zone 147.
(2) Put a CONTAINER 5 L (1.32 USGAL) in position to collect the hydraulic fluid below:
- the THS actuator 9CE and
- the LP manifold 1003GM.
(4) Disconnect the pressure line from the valve block.
(5) Disconnect the return line from the valve block.
(6) Disconnect the return line from the LP manifold 1003GM.
(7) Connect the pressure line to the return line at the THS actuator 9CE with an union.
CAUTION:
MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
(8) Put the ALT29000001 HYD GRND PWR UNIT3000 in position as necessary. (9) Connect the pressure hose of the ALT29000001 HYD GRND PWR UNIT3000 to the delivery connector 1008GM with an LOCALLY MANUFACTURED - ADAPTER.
(10) Connect the return hose of the ALT29000001 HYD GRND PWR UNIT3000 to the return line at the LP manifold 1003GM with an LOCALLY MANUFACTURED - ADAPTER.
(11) Put the PLUG-BLANKING in each disconnected line end.
Subtask 12-36-29-170-061-A
A. Flush the Green hydraulic system.
(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
(2) Stop the hydraulic power cart.
Subtask 12-36-29-960-061-A 5. Close-up(1) Operate the hydraulic power cart for 20 s at 20 bar (290.0754 psi).
(2) Stop the hydraulic power cart.
Subtask 12-36-29-860-085-A
A. Put the system back to the serviceable condition.
(1) Disconnect the pressure hose of the hydraulic power cart and the adaptor from the delivery connector 1008GM.
(2) Disconnect the return hose of the hydraulic power cart and the adaptor from the return line at the LP manifold 1003GM.
(3) Disconnect and remove the union from the pressure and return lines at the THS actuator 9CE.
(4) Remove the hydraulic power cart.
(5) Remove the blanking plugs.
(6) Connect the return line to the LP manifold 1003GM.
(7) Connect the pressure line to the valve block of the THS actuator 9CE.
(8) Connect the return line to the valve block of the THS actuator 9CE.
(9) Safety the connections of the pressure and return lines with corrosion-resistant steel lockwire 0.8 mm (0.032 in) dia.
Subtask 12-36-29-790-061-A (1) Disconnect the pressure hose of the hydraulic power cart and the adaptor from the delivery connector 1008GM.
(2) Disconnect the return hose of the hydraulic power cart and the adaptor from the return line at the LP manifold 1003GM.
(3) Disconnect and remove the union from the pressure and return lines at the THS actuator 9CE.
(4) Remove the hydraulic power cart.
(5) Remove the blanking plugs.
(6) Connect the return line to the LP manifold 1003GM.
(7) Connect the pressure line to the valve block of the THS actuator 9CE.
(8) Connect the return line to the valve block of the THS actuator 9CE.
(9) Safety the connections of the pressure and return lines with corrosion-resistant steel lockwire 0.8 mm (0.032 in) dia.
B. Leak Test of the Components which were Disconnected
(1) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(2) Make sure that there is no hydraulic fluid leakage.
(3) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
Subtask 12-36-29-942-100-A (1) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(2) Make sure that there is no hydraulic fluid leakage.
(3) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
C. Put the aircraft back to its initial configuration.
(1) Remove the containers.
(2) Remove the safety barriers.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
Subtask 12-36-29-410-082-A (1) Remove the containers.
(2) Remove the safety barriers.
(3) Remove the access platform(s).
(4) Remove the WARNING NOTICE(S).
D. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
(3) Close the access door 312AR.
(4) Close the access door 197CB.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the left MLG door (Ref. AMM TASK 32-12-00-410-001).
(3) Close the access door 312AR.
(4) Close the access door 197CB.
(5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Green Hydraulic System of the THS Actuator 9CE - Flushing Schematic