W DOC AIRBUS | AMM A320F

47-20 DISTRIBUTION


    47-20-00 DISTRIBUTION

  • PB.401 DISTRIBUTION - DEACTIVATION/REACTIVATION
  • 47-20-41 VALVE IN-TANK, HOUSING

  • PB.401 HOUSING - IN TANK, IGGS - REMOVAL/INSTALLATION
  • 47-20-43 VALVE DUAL-FLAPPER, CHECK

  • PB.401 CHECK VALVE - DUAL FLAPPER, IGGS - REMOVAL/INSTALLATION
  • PB.701 CHECK VALVE - DUAL FLAPPER, IGGS - CLEANING/PAINTING
  • 47-20-49 NITROGEN ENRICHED AIR (NEA) PIPES

  • PB.401 NITROGEN ENRICHED AIR (NEA) PIPES - REMOVAL/INSTALLATION
    • 47-20-49-000-801-A [10]
      Removal of the NEA Line in the Fuel Center Tank
    • 47-20-49-400-801-A [10]
      Installation of the NEA Line in the Fuel Center Tank
    • 47-20-49-000-804-A [10]
      Removal of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box
    • 47-20-49-400-804-A [10]
      Installation of the NEA Line in the Bay between the FWD Cargo Compartment and the FWD Pressure Bulkhead of the Center Wing Box
    • 47-20-49-000-805-A [10]
      Removal of the NEA Line on the Outside of the Fuel Center Tank
    • 47-20-49-400-805-A [10]
      Installation of the NEA Line on the Outside of the Fuel Center Tank