VERTICAL STABILIZER ATTACH FITTINGS - DESCRIPTION AND OPERATION
** ON A/C NOT FOR ALL
** ON A/C NOT FOR ALL
1. General
Three pairs of primary attach fittings and three transverse-load fittings attach the vertical stabilizer to the fuselage.
** ON A/C NOT FOR ALL Three pairs of primary attach fittings and three transverse-load fittings attach the vertical stabilizer to the fuselage.
** ON A/C NOT FOR ALL
3. Description
The primary attach fittings of the left-hand and right-hand side are laminated with the side shells. They are found at:
The primary attach fittings of the left-hand and right-hand side are laminated with the side shells. They are found at:
- the front spar,
- the center spar,
- the rear spar.
Vertical Stabilizer Attach Fittings